參考文獻 |
[1] 柯文清,”晶圓製造廠多工單等級下生產規劃模式之構建”,國立交通大學工業工程與管理學系碩士論文,民國89年。
[2] 溫伊蓁,”晶圓製造廠多工單等級之生產活動控制系統設計”,國立交通大學工業工程與管理學系碩士論文,民國89年。
[3] Adams, J., Balas, E., and Zawack, D., “The Shifting Bottleneck Procedure For Job-Shop Scheduling,” Management Science, Vol.34, No.3, pp.391-401, 1988.
[4] Akturk, M.S., Gorgulu, E. “Match-up scheduling under a machine breakdown,” European Journal of Operation Reasearch, Vol.112, pp.81-97, 1999
[5] Applegate, D., and Cook, W., “A computational study of the job shop scheduling problem,” ORSA Journal of Computing, Vol.3, pp.149-156, 1991.
[6] Baker, J.R., and McMahon, G.B., “Scheduling The General Job-Shop,” The Institute of Management Sciences, Vol.31, No.5, 1985.
[7] Balas, E., “Machine Sequencing Via Disjunctive Graphs: An Implicit Enumeration Algorithm,” Operations Research, Vol.17, pp.941-957, 1969.
[8] Bistline Sr, W.G., Banerjee, S. and Banerjee, A “RTSS: An Interactive Decision Support System For Solving Real Time Scheduling Problems Considering Customer and Job Priorities with Schedule Interruptions” Computer Ops Res. Vol.25, No.11, pp.981-995, 1998
[9] Brucker, P., “An Efficient Algorithm for the Job-Shop Problem with Two Jobs,” Computing, Vol. 40, pp.353-359, 1988.
[10] Carlier, J., and Pinson, E., “An Algorithm for Solving the Job-Shop Problem,” Management Sciences, Vol. 35. pp.164-176, 1989.
[11] Carlier, J., and Pinson, E., “A Practical Use of Jackson’s Schedule for Solving the Job Shop Problem,” Annals of Operations Research, Vol. 26. pp.269-287, 1990.
[12] Carlier, J., and Pinson, E., “Adjustment of Heads and Tails for the Job Shop Problem,” European Journal of Operation Research, Vol.78, pp.146-161, 1994.
[13] Gooding, C. and Rudisill, F. “Contigent Critical Ratio Analysis,” Production and Inventory Management, Vol.25 Issue.4, 1984
[14] Lee, C.Y., Uzsoy, R., and Martin-Vega, L.A., “A Review of Production Planning and Scheduling Models in The Semiconductor Industry. Part I: System Characteristics, Performance Evaluation and Production Planning,” IEEE Trans.,VOL.24,NO.4,1992.
[15] Malhotra, M.K. “Management of Vital Customer Priorities in Job Shop Manufacturing Environment,” Decision Sciences, Vol.25, No. 5/6, 1994.
[16] Menlnyk, S.A., Denzler, D.R., & Steele, D.C. “Scheduling the multiple class job shop with delivery windows,” Proceedings of the Decision Sciences Institute, Atlanta, GA, 1992
[17] Pinedo, M.,”Scheduling:Theory, Algorithms and System,” Prentice Hall, 1995. |