參考文獻 |
Averill M. Law, and W. David Kelton, “Simulation Modeling And Analysis,” New York.
Akturk, M. S. and Yilmaz, H., 1996, “Scheduling of automated guided vehicles in a decision making hierarchy,” International Journal of Production Research, 34(2), 577-591.
Bartholdi, J. J., and Platzman, L. K., 1989, “Decentralized control of automated guided vehicles on a simple loop,” IIE Transactions, 21(1), 76-81.
Bozer, Y. A., and Yen, C. K., 1996, “Intelligent dispatching rules for trip-based material handling systems”, Journal of Manufacturing Systems, 15(4), 226-239.
Bilge, U. and Tanchoco, J. M. A., 1997, “AGV systems with muti-load carriers:Basic issues and potential benefits,” Journal of manufacturing systems, 16(3), 159-171.
Byung. H. J. and Sabah U. R., 2001, “A muti-attribute dispatching rule for automated guided vehicle systems,” International Journal of Production Research, 39(13), 2817-2832.
Davis, R. and Smith, R. G., 1983, "Negotiation as a Metaphor for Distributed Problem Solving," Artificial Intelligence, Vol. 20, No. 1, pp.63-109.
Egbelu, P. J., and Tanchoco, J. M. A., 1984, “Characterization of automatic guided vehicle dispatching rules,” International Journal of Production Research, 22(3), 359-374.
Egbelu, P. J., 1987, “Pull versus push strategy for automated guided vehicle load movement in a batch manufacturing system,” Journal of Manufacturing Systems, 6(3), 209-221.
Gaskins, R. J., and Tanchoco, J. M. A., 1987, “Flow path design for automated guided vehicle systems,” International Journal of Production Research, 25(5), 667-676.
Gould, L., 1990, “Could an AGVs Work for You ?” Modern Material Handling, 74-79.
Goetz, William G. and Egbelu, P. J., 1990, “Guide path design and location of load pick-up/drop-off points for an automated guided vehicle system,” International Journal of Production Research, 28(5), 927-941.
Hodgson, T. J., R. E.,Monteith, S.K., and Schultz, S.R., 1987, “Developing control rules for an AGVs using Markov decision processes,” Material Flow, vol.4, 85-96.
Ho. Y. C., and Moodie, C., L., 1996, “Solving cell formation problems in a manufacturing environment with flexible processing and routeing capabilities,” International Journal of Production Research, 34(10), 2901-2923.
Hwang, H. and Kim, S. H., 1998, “Development of dispatching rules for automated guided vehicle systems,” Journal of manufacturing systems, 17(2), 137-143.
Hu, Q., Arun K. and Zhang S., 2001, “A bidding decision model in multi-agent supply chain planning,” International Journal of Production Research, 39(15), 3291-3301.
Jaejin, J., Jungdae, S. and Placid, M. F., 2001, “An AGV routing policy reflecting the current and future state of semiconductor and LCD production lines,” International Journal of Production Research, 39(17), 3901-3921.
Kim, J., and Klein, C. M., 1996, “Location of departmental pickup and delivery points for an AGV system,” International Journal of Production Research, 34(2), 407-420.
Liu, C. M., and Duh, S. H., 1992, “Study of AGVs design and dispatching rules by analytical and simulation methods,” International Journal of Computer Integrated Manufacturing, 5(4&5), 290-299.
Lin, Y. J., and Solberg, J. J., 1989, “Flexible routing control and scheduling,” Proceedings of the Third ORSA/TIMS conference on flexible manufacturing systems, Netherlands.
Lin, G.. Y., 1993, “A Distributed Production Control For an Intelligent Manufacturing Systems,” Ph. D. Thesis, Prudue University.
Lee, J., Tangjarukij, M. and Zhu, Z., 1996, “Load selection of automated guided vehicles in flexible manufacturing systems,” International Journal of Production Research, 34(12), 3388-3400.
Lee, K. K., Yoon, W. C. and Baek, D. H., 2001, “Generating interpretable fuzzy rules for adaptive job dispatching,” International Journal of Production Research, 39(5), 1011-1030.
Ozden, M., 1988, “A simulation study of multiple-load-carrying automated guided vehicles in flexible manufacturing system,” International Journal of Production Research, 26(8), 1353-1366
Occena, L. G. and Yokota, T., 1991,“Modeling of an automated guided vehicle system (AGVs) in a just-in-time (JIT) environment,” International Journal of Production Research, 29(3), 495-511.
Occena, L. G., and Yokota, T., 1993, “Analysis of the AGV loading capacity in a JIT environment,” Journal of Manufacturing system, 12(1), 24-35.
Ozelkan, E. C.; and Duckstein, L., 1999, “Optimal fuzzy counterparts of scheduling rules,” European Journal of Operational Research, 113(3), 593-609.
Russell, R.S. and Tanchoco, J. M. A.,1984, “An evaluation of vehicle dispatching rules and their effect on shop performance,” Material Flow, vol.1, 271-280.
Stankovic, J. A., 1984, “Simulations of Three Adaptive, Decentralized Controlled, Job Scheduling Algorithms,” Computer Networks & ISDN Systems, 8(3), 199-218.
Sabuncuoglu, I. And Hommertzheim, D. L., 1992, “Dynamic dispatching algorithm for scheduling machines and automated guided vehicles in a flexible manufacturing system,” International Journal of Production Research, 30(5), 1059-1079.
Smith, R. G., 1980, “The contract net protocol: High-Level communication and control in a distributed problem solver,” IEEE Transactions on Computers, c29(12), 1104-1113.
Tompkins. J.A. and White, J. A, 1984, “Facility Planning ,” Wiley, New York.
Tanchoco, J. M. A. and Co, C. G., 1994, “Real-time control strategies for multiple-load AGVs,” Material Flow Systems in Manufacturing, edit by Tanchoco, J. M. A. (Chapman & Hall), pp. 300-331.
Taghaboni, F. and Tanchoco, J. M. A., 1995, “Comparison of dynamic routing techniques for automated guided vehicle system,” International Journal of Production Research, 33(10), 2653-2669.
Yim. D. and Linn. R. J., 1993,“Push and pull rules for dispatching automated guided vehicles in a flexible manufacturing system,” International Journal of Production Research, 31(1), 43-57.
林宏益,1991,『以投標法則分析無人搬運車指派問題』,國立交通大學工業工程與管理研究所碩士論文。
賴士葆,1995,『生產/作業管理:理論與實務』,華泰書局。
蕭漢祈,1996,『多載量AGV系統在單迴圈和區段式雙向單迴圈軌道下之績效表現』,國立中央大學工業管理研究所碩士論文。
張世昌,1999,『多載量無人搬運車系統在及時生產環境下之即時控制策略』,國立中央大學工業管理研究所碩士論文。
陳作斌,2000,『模糊指派問題之匈牙利解法』,國立成功大學工業管理研究所碩士論文。
吳進富,2000,『在具製程與途程彈性之AGV控制策略』,國立中央大學工業管理研究所碩士論文。
吳豐全,2001,『多載量AGV的控制方法』,國立中央大學工業管理研究所碩士論文。
王文俊,2002,『認識Fuzzy』,全華科技。 |