參考文獻 |
1. Banker, R., Khosla, I., and Sinha, K., 1998, Quality and competition, Management Science, 44, 1179-1192.
2. Bitran, G.R. and Mondschein, S.V., 1995, An application of yield management to the hotel industry considering multiple day stays, Operations Research, 43, (3), 427-443.
3. Bryne, D. M. and Taguchi, S., 1986, The Taguchi Approach to Parameter Design, ASQC Quality Congress Transactions, 177, 168-173.
4. Chand, S., 1989, Lot sizes and setup frequency with learning in setups and process quality, European Journal of Operations Research, 42, 190-202.
5. Chen, J. M. and Tsou, J. C., 2003, An optimal design for process quality improvement: modelling and application, Production Planning & Control, 14, 603-612.
6. Cheng, T. C. E., 1989, An economic production quantity model with flexibility and reliability considerations, European Journal of Operations Research, 39, 174-179.
7. Cheng, T. C. E., 1991, Economic order quantity model with demand-dependent unit production cost and imperfect production processes, IIE Transactions, 23, 23-28.
8. Elimam, A.A. and Dodin, B.M., 1995, An optimization-based productivity improvement incentive system, IIE Transactions, 27, (3), 394-404.
9. Elimam, A.A. and Dodin, B.M., 2001, Incentives and yield management in improving productivity of manufacturing facilities, IIE Transactions, 33, (6), 449-462.
10. Fine, C.H., 1988, A quality control model with Learning Effects, Operations Research, 36, 437-444.
11. Fine, C. H. and Porteus, E. L., 1989, Dynamic process improvement, Operations Research, 37, 580-591.
12. Ford Motor Company, 2002, Internal training material: 6-sigma Black Belt training, Dearborn, Michigan.
13. Ganeshan, R., Kulkarni S., and Boone T., 2001, Production Economics and Process Quality: A Taguchi Perspective, International Journal of Production Economics, 71, 343-351.
14. Goyal, S.K. and Gunasekaran, A., 1990, Effect of dynamic process quality control on the economics of production, International Journal of Operations and Production Management, 10, 69-77.
15. Goyal, S.K., Gunasekaran, A., Martikainen, T. and Yli-Olli, P., 1993, Integrating production and quality control policies: A survey, European Journal of Operational Research, 69, 1-13.
16. Harrington, H. J., 1987, POOR-QUALITY COST, American Society for Quality Control.
17. Hong, J., Hayya, J.C. and Kim, S.L., 1992, JIT purchasing and setup reduction in an integrated inventory model, International Journal of Production Research, 30, 245-256.
18. Hong, J., Xu, S.H., and Hayya, J.C., 1993, Process quality improvement and setup reduction in dynamic lot-sizing, International Journal of Production Research, 31, 2693-2708.
19. Jaber, M.Y. and Bonney, M., 2003, Lot sizing with learning and forgetting in set-ups and in product quality, International Journal of Production Economics, 83, 95-111.
20. Krishnan, M.S., Kriebel, C.H., Kekre, S., and Mukhopodhayay, T., 2000, An empirical analysis of productivity and quality in software products, Management Science, 46, 745-759.
21. Lee, H.L. and Rosenblatt, M.J., 1987, Simultaneous determination of production cycles and inspection schedules in a production system, Management Science, 33, 1125-1137.
22. Maghsoodloo, S. and Li, M.C., 2000, Optimal asymmetric tolerance design, IIE Transactions, 32, 1127-1137.
23. Ng, W. and Hui, Y., 1996, Interactive quality improvement of a process subject to complete inspection, International Journal of Production Research, 34, 3275-3284.
24. Porteus, E.L., 1986, Optimal lot-sizing process quality improvement and setup cost reduction, Operations Research, 34, 137-144.
25. Rosenblat, M.J. and Lee, H.L., 1986, Economic production cycles with imperfect production processes, IIE Transactions, 18, 48-55.
26. Salameh, M.K. and Jaber, M.Y., 2000, Economic production quantity model for items with imperfect quality, International Journal of Production Economics, 64, 59-64.
27. Schonberger, R., 1986, World Class Manufacturing Techniques, The Free Press.
28. Shingo, Shigeo and Dillon, A.P., 1986, Zero Quality Control: Source Inspection and the Poka-Yoke System, Productivity Press, Massachusetts.
29. Smith, C.B., Leimkuhler, J.F., and Darrow, R.W., 1992, Yield management in American Airlines, Interfaces, 22, (1), 8-32.
30. Summers, C.S., 2003, Quality, Prentice Hall, Ohio.
31. Taguchi, G.. and Wu, Y., 1980, Introduction to Off-line Quality Control, Central Japan Quality Control Association, Meieki Nakamura-ku Magaya, Japan.
32. Tapiero, C., 1987, Production learning and quality control, IIE Transactions, 19, 362-370.
33. Tersine, R.J., 1994, Principles of Inventory and Materials Management, Prentice-Hall, New Jersey.
34. Weatherford, L.R. and Bodily, S.E., 1992, A taxonomy and research overview of perishable asset revenue management: yield management, overbooking and pricing, Operation Research, 40, (5), 831-844.
35. Zhang, X. and Gerchak, Y., 1990, Joint lot sizing and inspection policy in an EOQ model with random yield, IIE Transactions, 22, (1), 41-47. |