參考文獻 |
參考文獻
Bartholdi, J. J. and Platzman, L. K., 1989, “Decentralized control of automated guided vehicles on a simple loop,”IIE Transactions, 21(1), 76-81.
Bilge, U. and Tanchoco, J. M. A., 1997, “AGV systems with muti-load carriers:Basic issues and potential benefits,” Journal of manufacturing systems, 16(3), 159-171.
Bozer, Y. A. and Srinivasan, M. M., 1989, “Tandem configurations for AGV systems offer simplicity and flexibility,” Material Handling System, 21(2), 23-27.
Bozer, Y. A. and Srinvasan, M. M., 1992, “Tandem AGV system : a partitioning algorithm and performance comparison with conventional AGV systems,” European Journal of Operational Research, 63(1) , 173-191..
Egbelu, P. J., 1987, “Pull versus push strategy for automated guided vehicle load movement in a batch manufacturing system,” Journal of Manufacturing Systems, 6(3), 209-221.
Egbelu, P. J., 1987, “The use of non-simulation approaches in estimating vehicle requirements in an automated guided vehicle base transport System,” Material Flow, 2, 17-32.
Egbelu, P. J. and Tanchoco, J. M. A., 1984, “Characterization of automatic guided vehicle dispatching rules,”International Journal of Production Research, 22(3), 359-374.
Egbelu, P. J. and Tanchoco, J. M. A., 1986, “Potentials for bi-directional guide-path for automated guided systems,” International Journal of Production Research, 24(5), 1075-1097.
Gaskins, R. J., and Tanchoco, J. M. A., 1987, “Flow path design for automated guided vehicle systems,”International Journal of Production Research, 25(5), 667-676.
Gaskins, R. J., Tanchoco, J. M. A., and Taghoboni, F., 1989, “Virtual flow paths for free-ranging automated guided vehicle system,” International Journal of Production Research, 27(1), 91-100..
Kaspi, M. and Tanchoco, J. M. A., 1990, “Optimal flow path design of unidirectional AGV systems,” International Journal of Production Research, 28(6), 1023-1030.
Kim, C. W. and Tanchoco, J. M. A., 1991, “Conflict-free shortest path bi-directional AGV routing,” International Journal of Production Research, 29(12), 2377-2391.
Klein, C. M. and Kim, J., 1996, “AGV dispatching,” International Journal of Production Research, 34(1), 95-110.
Lee, J.; Tangjarukij, M.; Zhu, Z.. 1996, “Load selection of automated guided vehicles in flexible manufacturing systems.” International Journal of Production Research, Dec96, Vol. 34 Issue 12, p3383, 18p.
Law, K. M., and Kelton, W. D., 1999, Simulation Modeling and Analysis, McGraw-Hill, Boston.
Mahadevan, B. and Narendran, T. T., 1990, “Design of an automated guided vehicle-based material handling system for a flexible manufacturing system,”International Journal of Production Research, 28(9), 1611-1622
Maxwell, W. L. and Muckstadt, J. A., 1982, “Design of automatic guided vehicle systems,” IIE Transaction, 14(2), 114-124.
Nayyar., P. and Khator, S. K., 1993, “Operational Control of multi-load vehicles in an automated guided vehicle system,” Computers and Industrial Engineering, 25(1-4), 503-506.
Newton, D., 1985, “Simulation model calculates how many automated guided vehicle are needed,” Industrial Engineering, 8(2), 68-77.
Occena, L. G. and Yokota, T., 1991, “Modeling of an automated guided vehicle system (AGVs) in a just-in-time (JIT) environment,” International Journal of Production Research, 29(3), 495-511.
Ozden M., 1988, “A simulation study of multiple-load-carrying automated guided vehicles in a flexible manufacturing system,” International Journal of Production Research, Aug88, Vol. 26 Issue 8, p1353, 14p.
Prakash, Avneesh; Chen, Mingyuan, 1995,” A simulation study of flexible manufacturing systems,” Computers & Industrial Engineering, 28(1), pp. 191-199
Rajotia, S., Shanker, K., and Batra, J. L., 1998, “Determination of optimal AGV fleet size for an FMS,” International Journal of Production Research, 36(5), 1177-1198.
Sinriech, D., and Tanchoco, J. M. A., 1991, “Intersection graph method for AGV flow path design,” International Journal of Production Research, 29(9), 1725-1732.
Sinriech, D., and Tanchoco, J. M. A., 1992, “An economic model for determining AGV fleet size,” International Journal of Production Research, 30(6), 1255-1268.
Sinriech, D. and Tanchoco, J. M. A., 1995, “An introduction to the segmented flow approach for discrete material flow systems,” International Journal of Production Research, 33(12), 3381-3410.
Sinriech, D. Tanchoco, J. M. A., and Herer, Y. T., 1996, “The segmented bi-directional single-loop topology for material flow systems,” IIE Transactions, 28(1), 40-54.
Tanchoco, J. M. A. and Sinriech, D., 1991, “OSL-optimal single loop guided paths for AGVs,” International Journal of Production Research, 30(3), 665-681.
Tanchoco, J. M. A., and Co, C. G., 1994, “Real-time control strategies for multiple-load AGVs,” Material Flow Systems in Manufacturing, edit by Tanchoco, J. M. A. (Chapman & Hall), pp. 300-331.
Wysk, R. A. and Egbelu, P. J., 1987, “Use of spread sheet analysis for evaluation AGV systems, ” Material Flow, 4, 53-64.
Yim. D., and Linn. R. J., 1993, “Push and pull rules for dispatching automated guided vehicles in a flexible manufacturing system”. International Journal of Production Research, 31(1), 43-57.
黎士賢,1998,『網路式移動區域控制無人搬運車系統』,國立中央大學工業管理研究所碩士論文。
劉嘉文,1999,『考慮加工設備阻塞及飢渴現象並具途程串接優化的AGV派車法』,國立台灣大學工業工程研究所碩士論文。
廖韋昌,2002,『模糊投標式多載量AGV之控制方法』,國立中央大學工業管理研究所碩士論文。
陳永昇,2002,『多載量無人搬車派送法則的研究』,國立中央大學工業管理研究所碩士論文。
龎百正,2003,『多載量AGV之派車法則與揀取法則的探討』,國立中央大學工業管理研究所碩士論文。 |