參考文獻 |
[1] ADENSO-DIAZ, B. and LAGUNA, M., ”Modeling the Load Leveling Problem in Master Production Scheduling for MRP Systems”, INT. J. PROD. RES., 1996, Vol. 34, No. 2, 483-493
[2] BHUTTA, K. S., HUQ, F., FRAZIER, G. and MOHAMED, Z., ”An Integrated Location, Production, Distribution and Investment Model for a Multinational Corporation”, INT. J. Production Economics 86(2003), 201-216
[3] BARD, J. F., SRINIVASAN, K. and TIRUPATI, D., “An Optimization Approach to Capacity in Semiconductor Manufacturing Facilities”, INT. J. PROD. RES., 1999, Vol.37, No. 15, 3359-3382
[4] FOWLER, J. W., PARK, S., MACKULAK, G. T. and SHUNK, D. L., ”Efficient Cycle Time-Throughput Curve Generation Using a Fixed Sample Size Procedure”, INT. J. PROD.RES., 2001, Vol. 39, No. 12, 2595-2613
[5] GOETSCHALCKX, M., VIDAL C. J. and DOGAN, K., ”Modeling and Design of Global Logistics Systems:A Review of Integrated Strategic and Tactical Models and Design Algorithms”, European Journal of Operational Research 143(2002), 1-18
[6] HASTINGS, N. A. J., MARSHALL, P. and WILLIS, R. J., ” Schedule Based M.R.P.:An Integrated Approach to Production Scheduling and Material Requirement Planning ”, The Journal of the Operational Research Society, 1982, Vol. 33, No. 11, 1021-1029
[7] HO, C. J., KIM, S. C. and KOO, M., ”MRP System Performance Under Lumpy Demand Environments”, PRODUCTION PLANNING & CONTROL, 2001, Vol. 12, No. 4, 316-325
[8] JANG, Y. J., JANG, S. Y., CHANG, B. M. and PARK, J., ”A Combined Model of Network Design and Production/Distribution Planning for a Supply Network”, Computers & Industrial Engineering 43(2002), 263-281
[9] KIM, S., DAVIS, K. R. and COX III J. F., ”Investigation of Flow Mechanisms in Semiconductor Wafer Fabrication”, INT. J. PROD. RES., 2003, Vol. 41, No. 4, 681-698
[10] KISHIMOTO, M., OZAWA, K., WATANABE, K. and MARTIN, D. P., “Optimized Operations by Extended X-Factor Theory Including Unit Hours Concept”, IEEE Transactions on Semiconductor Manufacturing, 2001, Vol. 14, No.3, 187-195
[11] KOH, S. C. L., SAAD, S. M. and JONES, M. H., ”Uncertainty Under MRP-Planned Manufacture: Review and Categorization”, INT. J. PROD. RES., 2002, Vol. 40, No. 10, 2399-2421
[12] LEE, Y. H. and KIM, S. H., “Production-Distribution Planning in Supply Chain Considering Capacity Constraints”, Computers & Industrial Engineering 43(2002),169-190
[13] LUEBBE, R. and FINCH, B., ”Theory of Constraints and Linear Programming:A Comparison”, INT. J. PROD. RES., 1992, Vol. 30, No. 6, 1471-1478
[14] MARTIN, D. P., “Total Operational Efficiency (TOE): The Determination of 2 Capacity and Cycle Time Components and Their Relationship to Productivity Improvements in a Semiconductor Manufacturing Line”, IEEE/SEMI Advanced Semiconductor Manufacturing Conference, 1999, 37-41
[15] MIN, H. and ZHOU, G., ”Supply chain modeling: past, present and future”, Computers & Industrial Engineering , 43 (2002), 231-249
[16] NAGENDRA, P. B. and DAS, S. K., ”Finite Capacity Scheduling Method for MRP with Lot Size Restrictions”, INT. J. PROD. RES., 2001, Vol. 39, No. 8, 1603-1623
[17] PONTRANDOLFO, P. and OKOGBAA, O. G., ”Global Manufacturing: A Review and Framework for Planning in a Global Corporation”, INT. J. PROD. RES., 1999, Vol. 37, No. 1, 1-19
[18] PAPKE-SHIELDS, K. E., MALHOTRA, M. K. and GROVER, V., ”Strategic Manufacturing Planning Systems and Their Linkage to Planning System Success”, Decision Sciences, 2002, Vol. 33, No. 1, 1-30
[19] REN, J. Z., COHEN, M. A., TERWIESCH, C. and HO, T., ”An Empirical Analysis of Forecast Sharing in the Semiconductor Equipment Supply Chain”, Manufacturing & Service Operations Management, 2003, Vol. 5, No. 1, 70-73
[20] SHIMOYASHIRO S., ISODA, K. and AWANE H., ”Input Scheduling and Load Balance Control for a Job Shop”, INT. J. PROD. RES., 1984, Vol. 22, No. 4, 597-605
[21] SPENCER, M. S. and COX III, J. F., ”The Role of MRP in Repetitive Manufacturing”, INT. J. PROD. RES., 1995, Vol. 33, No. 7, 1881-1899
[22] STADTLER H. et al., “Supply Chain Management and Advanced Planning”, Springer-Verlag Berlin Heidelberg, 2000
[23] SHAPIRO, J. F., “Modeling the Supply Chain”, Wadsworth Group, 2001
[24] SCHÖMIG, A. K., ”OR Probleme in der Mikrochipfertigung”, Symposium on Operations Research 2000, Dresden
[25] SCHEER, A. W., “Business Process Engineering Study Edition”, Springer-Verlag Berlin Heidelberg, 1998
[26] UZSOY, R., LEE, C. Y. and MARTIN-VEGA, L. A., ”A Review of Production Planning and Scheduling Models in the Semiconductor Industry;Part I:System Characteristics, Performance Evaluation and Production Planning”, IIE Transactions, 1994, Vol. 26, No. 5, 47-60
[27] UZSOY, R., LEE, C. Y. and MARTIN-VEGA, L. A., ” A Review of Production Planning and Scheduling Models in the Semiconductor Industry;Part II:Shop-Floor Control”, IIE Transactions, 1994, Vol. 26, No. 5, 44-55
[28] VAN ZANT, P., “Microchip Fabrication:A Practical Guide to Semiconductor Processing”, 4th ed, McGraw-Hill, Inc., 2000 |