Change is usually inescapable on most construction projects. Such change may include multiple reasons and cause degrees of impact to costs associate with materials, manpower, and overhead. How to quantify project overhead impacted by project change still leaves construction practitioners a task to fulfill. This study is to preliminarily quantify the impact of changes to construction project overhead using statistical methods. The study hypothesis was made to assume that change order impacts and increases project overhead, guiding the data collection to satisfy data sampling assumptions of 95% confidence level and 10% of limits error in 20-80 category proportion. Thus 60 residential construction projects completed in the recent 10 years were collected. Using t-test, F-test, and regression to prove the hypothesis, we established that project change is linearly direct proportion to project overhead with the corresponding R-square at 0.687. Not only the hypothesis is proved but a quantitative tool is derived. Construction practitioners can utilize the regression equation to estimate the increase or decrease of project overhead as a construction project confronting changes.
|
參考文獻 |
【1】 王伯檢,「工程人員契約法律實務」,三版,永然文化出版股份有限公司,1998。
【2】 黃弘銘,「鋼構造基準生產力之研究」,國立高雄第一科技大學營建工程系碩士論文,2000。
【3】 黃火城,「國內營造工程契約問題點及公平性之研究」,國立台灣工業技術學院碩士論文,1985。
【4】 王伯檢,「工程糾紛與索賠實務」,初版,元照出版公司,2002。
【5】 行政院法規資料庫網站,http://law.moj.gov.tw/,2008。
【6】 行政院主計處網站,http://www.dgbas.gov.tw/,2008。
【7】 李公璞,「工程項目成本管理探討」,武漢大學碩士論文,2004。
【8】 P. Levin, Construction contract claims, changes & dispute resolution. Second edition,ASCE press,1998.
【9】 姚乃嘉,「營建管理課程講義」,中央大學營建管理研究所,2003。
【10】 王玨,「建築工程估價投標(修訂版)」,詹氏書局,2003。
【11】 謝定亞,「施工承攬契約不可抗力風險分配之法律經濟分析」,東吳大學法律學研究所碩士論文,2004。
【12】 許世明,「營建工程契約中變更設計之研究」,東吳大學法律學系法律專業碩士班碩士論文,2005。
【13】 S.L. McGreevy, When you see a claim coming, prepare, Contractor Magazine,5(11),29-34,2004.
【14】 成虎,「建設工程合同管理與索賠」第四版,東南大學出版社,2008。
【15】 鐘亦梅 「工程契約變更與求償之研究」,國立高雄第一科技大學營建工程系碩士論文,2005。
【16】 R.F. Cushman & S.D. Butler,Construction change order claims 2-4,Aspen publishers online,1994.
【17】 王祥騮,「營建工程之特性及管理原則」,商務仲裁,第42 期,22-27頁,1996。
【18】 王義雲、各業會計制度(修訂版),五南圖書出版公司,台北,1995。
【19】 梁鑑,「國際工程施工索賠」,初版,淑馨出版社,1999。
【20】 李宗德,「大型公共工程合約中衍生性損害賠償之適用及其應有之限制」,營建管理季刊,第25卷,52-60頁,1995。
【21】 黃泰鋒,「工期展延之合理補償」,營造天下,第35/36期,47-52頁,1998。
【22】 J. Zack,Calculation and recovery of home office overhead,International cost engineering council,Australia,2002.
【23】 D.N. Kaplan,and K.A. Jarek, Calculation Construction Damage Claims, 2002.
http://www.alpern.com/resources/publications/damage%20claims.htm,2008。
【24】 王伯儉,「工程契約中「時間」問題之探討」,營建管理季刊,第27期,45-53頁,1996。
【25】 W. Coombs and W.J. Palmer, Construction accounting & Financial management, McGraw-Hill, N.Y.,1989.
【26】 E. Flessland, Unabsorbed Home Office Overhead and Eicheay Formula,2002.
【27】 S. Mccaleb, Federal circuit expands contractor recovery of unabsorbed overhead, Procurement Law Advisor,6(6)2-12,2003.
【28】 M.J. Lankenau, Owner caused delay-field overhead damages, Cost engineering,45(9),13-17,2003.
【29】 陳玉潔,「工程契約變更之爭議問題」,國立政治大學法律學研究所碩士論文,2005。
【30】 鄭錦榮,「重大公共工程合約變更管理之問題探討:以北部區域第二高速公路工程為例,交通大學管理科學研究所碩士論文」,58頁,1996。
【31】 J.W. Creswell, Research design: Qualitative, Quantitative, and mixed methods approaches. 2nd Ed. Thousand oaks, CA: Sage publications,2003.
【32】 陳景堂,「統計分析SPSS FOR WINDOWS 入門與應用」,儒林圖書,2003。
|