參考文獻 |
【1】George E. Baram (2000), “Concurrent Delays-What Are They and How to Deal With Them?” AACE International Transactions.
【2】Eric L. Nelson (2005), “Concurrent Delay: It's Not as Easy to Prove as You Thought,” http://www.lorman.com/newsletter.
【3】顧美春 (2002),「工程契約風險分配與常見爭議問題之研究」,國立交通大學科技法律研究所碩士論文。
【4】行政院公共工程委員會 (2003),「政府採購履約爭議處理案例彙編」。
【5】中華民國仲裁協會 (2000),「工程仲裁案例選輯(I)」。
【6】中華民國仲裁協會 (2001),「工程仲裁案例選輯(II)」。
【7】鄭明龍 (2003),「營建工程遲延分析」,國立高雄第一科技大學營建工程系碩士論文。
【8】尹碧娟 (2004),「工程時程遲延分析方法之研究」,中華大學營建管理研究所碩士論文。
【9】姚乃嘉 (2005),「回歸仲裁制度,與國際接軌」,營建知訊,第二百七十四期,pp.44-51。
【10】Theodore J. Trauner, Jr. (1990), “Construction Delays,” R.S. Means Company, INC.
【11】FIDIC (2005), “The New Red Book,” Fédération Internationale des Ingénieurs Conseils.
【12】Zaki M. Kraiem and James E. Diekmann (1987), “Concurrent Delays in Construction Projects,” Journal of Construction Engineering and Management, Vol. 113, No. 4, pp. 591-602.
【13】Anania Mbabazi, Tarek Hegazy, Frank Saccomanno (2005), “Modified But-For Method for Delay Analysis,” Journal of Construction Engineering and Management, Vol. 131, No. 10, pp. 1142-1144.
【14】Victor M. Ostrowski and Michael T. Midgette (2006), “Concurrent Delay Analysis in Litigation,” Cost Engineering, Vol. 48, No. 1, pp. 30-37.
【15】Satish B. Mohan and Khalid S. Al-Gahtani (2006), “Concurrent Delay Analysis Techniques and Improvements,” Cost Engineering, Vol. 48, No. 9, pp. 12-21.
【16】David Arditi and Thanat Pattanakitchamroon (2006), “Selecting a Delay Analysis Method in Resolving Construction Claims,” International Journal of Project Management, Vol. 24, pp. 145-155.
【17】Vera A Lovejoy (2004), “Claims Schedule Development and Analysis: Collapsed As-Built Scheduling for Beginners,” Cost Engineering, Vol. 46, No. 1, pp. 27-30.
【18】The Society of Construction Law (2002), “Delay and Disruption Protocol,” http://www.scl.org.uk.
【19】Mallesons Stephen Jaques (2003), “Concurrent Delay,” http://www. Mallesons.com.
【20】David Arditi and Mark A. Robinson (1995), “Concurrent Delays in Construction Litigation,” Cost Engineering, Vol. 37, No. 7, pp. 20-30.
【21】Business Publishiers (1993), Construction Claims Monthly Vol.15, No.10.
【22】Barry B. Bramble and Michael T. Callahan (1987), “Construction Delay Claims,” Wiley Law Publication.
【23】Rober A. Rubin, Sammie D. Guy, Alfred C. Maevis, Virginia Fairweather (1983), “Construction Claims Analysis, Presentation, Defense,” Van Nostrand Reinhold Company, INC.
【24】Khalid S. Al-Gahtani and Dr. Satish B. Mohan (2007), “Total Float Management for Delay Analysis,” Cost Engineering, Vol. 49, No. 2, pp. 32-37.
【25】Tarek Hegazy and Kehui Zhang (2005), “Daily Windows Delay Analysis,” Journal of Construction Engineering and Management, Vol.131, No. 5, pp. 505-512.
【26】Abdulaziz A. Bubshait and Michael J. Cunningham (2004), “Management of Concurrent Delay in Construction,” Cost Engineering, Vol. 46, No. 6, pp. 22-28.
【27】Mark Boe (2004), “Identifying Concurrent Delay,” http://www.cpmiteam. com.
【28】John R. Spittler (2003), “Analyzing Concurrent Delay when Using the Lean Approach to Scheduling,” AACE International Transactions.
【29】William Ibbs and Long D. Nguyen (2007), “Schedule Analysis under the Effect of Resource Allocation,” Journal of Construction Engineering and Management, Vol. 133, No. 2, pp. 131-138.
【30】Thomas F. Peters, (2003), “Dissecting the Doctrine of Concurrent Delay,” AACE International Transactions.
【31】Ponce de Leon (1987) , “ Theories of concurrent delays, ” AACE International Transaction.
【32】Mireille Battikha and Sabah Alkass (1994), “A Cost-Effective Delay Analysis Technique,” AACE International Transaction.
【33】Robert J.Lane (1994), “Cause-Effect Analysis for Delay and Disruption Claims,” Construction Briefings.
【34】Hamed A. Al-Saggaf (1998), “The Five Commandments of Construction Project Delay Analysis,” Cost Engineering, Vol. 40, No. 4, pp. 37-41.
【35】Reynolds, R.B. and Revay, S.G. (2001), “Concurrent Delay: A Modest Proposal,” The Revay Report, Vol.20, No1.
【36】Business Publishiers (2002), Construction Claims Monthly, Vol. 24, No. 3.
【37】王伯儉(1999),「延長工期之費用求償」,營造天下,第四十一期,pp54-59。
【38】Always Associates (2005), “Concurrent Delay Reviewed,” Legal Article of Always Associates, http://www.alway-associates.co.uk.
【39】謝哲勝、李金松(2005),「工程契約理論與求償實務」,翰蘆出版社。
【40】Barry B. Bramble, Michael F. Donofrio, PE, John B. Stetson, IV, RA (1990), “Avoiding and Resolving Construction Claims,” R.S. Means Company, INC.
【41】The Society of Construction Law (2002), “Concurrent Delay” http:// www.scl org uk.
【42】Sabah Alkass , Mark Mazerolle, and Frank Harris (1996), “Construction Delay Analysis Techniques,” Journal of Construction Engineering and Management, Vol.14, pp. 375-394.
【43】John W. Melin and Barry Whiteaker (1981), “Fencing a Bar Chart,” Journal of the Construction Division, Vol. 107.
【44】George R. Stumpf (2000), “Schedule delay analysis,” Cost Engineering, Vol.42, No,7, pp.32-43.
【45】Youngjae Kim, Kyungrai Kim, and Dongwoo Shin (2005), “ Delay Analysis Method Using Delay Section,” Journal of Construction Engineering and Management, Vol. 131, No. 11, pp. 1155-1164.
【46】Kirk D. Gothand (2003), “Schedule Delay Analysis: Modified Windows Approach,” Cost Engineering, Vol.45, No9, pp.18-23.
【47】James G. Zack Jr. (2001), “But-For Schedules-Analysis and Defense,” Cost Engineering, Vol.43, No. 8, pp.18-23.
【48】Jesus M. De La Garza, Michael C. Vorsler, and Cordell M. Parvin (1991), “Total Float Traded as Commodity,” Journal of Construction Engineering and Management,” Vol. 117, No. 4.
【49】盧仲昱 (1994),「營建工程契約遲延問題之研究」,東吳大學法律研究所碩士論文。 |