參考文獻 |
1. Alexander P., Lars B., Jadex User Guide, Distributed Systems Group, University of Hamburg, Germany, p. 55, June 2007.
2. ARDUN, J. P., Ni, J. (2005), “French TGV network development,” Japan Railway & Transport Review, 40, pp. 22-28.
3. Carey, M. and Lockwood, D. (1995), “A model, algorithms and strategy for train pathing,” Journal of the Operational Research Society, Vol. 46, pp. 988-1005.
4. Carey, M. and Crawford, I. (2007), “Scheduling trains on a network of busy complex stations,” Transportation Research Part B, Vol. 4, pp. 159-178.
5. Cheng Y.H., (2011),“Railway-Controller-Perceived Competence in Incidents and Accidents,”Ergonomics,Vol.54,No.12,pp1130-1146
6. Chiu, C. K. et.all. (2002). A Constraint-Based Interactive Train Rescheduling Tool. Kluwer Journal Academic Publishers. Vol. 7, pp 167–198,2002
7. Firdausiyah, N., Lin, C.Y., Ho, T.W., Chen, T.C., and Chou, C.C. (2013), “Timetables Optimization Design Considering Train Circulation and Disturbances for Taiwan High-Speed Rail System,” 92nd Annual Meeting, TRB, Washington, D.C., USA.
8. Fornarino, C., (2009). ILOG : ottimizzazione e pianificazione. (Shown at IMPACT: smart SOA conference. Milano, June 17th 2009).
9. Higgings, A., Kozan, E. and Ferreira, L. (1996), “Heuristic techniques for single line train scheduling,” Journal of Heuristics, Vol. 3, pp. 43-62.
10. Huisman, D., Kroon, L. G., Lentink, R. M, Vromans, M. J. C. M. (2005). Operations research in passenger railway transportation. Statistical Neerlandica, 59(4), 467–497.
11. Jen-Yen Chen, “FIPA Communicative Acts (CA),” class notes for SE6007, Department of Computer Science and Information Engineering, National Central University,2011.
12. Jen-Yen Chen, “FIPA Interaction Protocol,” class notes for SE6007, Department of Computer Science and Information Engineering, National Central University, 2011.
13. Kraay, D. and Harker, P. (1995), “Real-time scheduling of freight railroads,” Transportation Research Part B, Vol. 29, No. 3, pp. 213-229.
14. Kroon, L. G., Dekker, R. and Vromans, M. J. C. M., (2007), “Cyclic railway timetabling: a stochastic optimization approach,” Lecture Notes in Computer Science, 4359, pp. 41-66.
15. Lai, Y.C. and Barkan, C.P.L. (2011). “Comprehensive Decision Support Framework for Strategic Railway Capacity Planning,” Journal of Transportation Engineering, 137(10), pp. 738-749.
16. Lai, Y.C. and Huang, P.W. (2012). “High-Speed Route Improvement Optimizer,” Transportation Research Record, No. 2289, pp. 18-23.
17. Lee, Yusin. & Chuen-Yih Chen. (2009). A heuristic for the train pathing and Timetabling problem Transportation Research Part B 43 ,pp837-861,2009
18. Mess, A.I. (1991). Railway scheduling by network optimization. Mathematical and Computer Modelling. Vol. 15, pp 33-42,1991
19. Nielsen,L.K. and Maroti,G.:”Disruption management of rolling stock in passenger railway transportation,” ERIM report Series Research in Management,Erasmus Research Institute of Management, Erasmus University Rotterdam, ERS-2009-046-LIS,2009,http://repub.cur.nl/res/pub/16657/
20. Platon, E., Mamei, M.,Sabouret, N., Honiden,S., and H. Van Dyke Parunak, “Mechanisms for Environments in Multi-agent Systems: Survey and Opportunities”, Autonomous Agents and Multi-Agent Systems, vol. 14, no. 1, pp.31-47, 2007.
21. Salido, M. & Federico, B. (2009). Mathematical solutions for solving periodic railway transportation. Mathematical Problems in Engineering, Article ID 728916,Volume 2009
22. Takano, M. et al.: Computer Assisting System to Propose and Evaluate Train-Rescheduling with a Function of Passenger-Path Allocation , Proc. of J-Rail, 2003
23. Telecom Italia Lab, “Jade” [online]. Available: http://jade.tilab.com/index.html
24. W3C, “OWL 2 Web Ontology Language Primer.” [Online]. Available: http://www.w3.org/TR/owl2-primer/
25. Wikipedia, “Belief–desire–intention software model.” [Online]. Available: http://en.wikipedia.org/wiki/Belief%E2%80%93desire%E2%80%93intention_software_model.
26. Wikipedia, “Entity–relationship model.” [Online]. Available: http://en.wikipedia.org/wiki/Entity-relationship_model.
27. Zhou, X. and Zhong, M. (2005), “Bicriteria train scheduling for high-speed passenger railroad planning applications,” European Journal of Operational Research, Vol. 167, pp. 752-771.
28. 八木誠:無線通訊式ATC(SPARCS),第14回鉄道技術連合シンポジウム,2007
29. 小林里紗,家田仁:「利用者の利便性から見非常時の運転整理ダイヤの評価」,第7回鉄道連合シンポジウム,pp.379-382,2000
30. 中村達也:「軌道回路を伝送媒体とする高速デジタル情報伝送」京三サーキュラー,2007.5
31. 日本日立製作所,次世代の交通インフラを築く
32. 日本信号鉄道信号開発部 開発2G SPARCS講習会 第2回 SPARCS無線機,2008
33. 今野信三:無線通訊式列車控制の導入,電學誌,p.549-552,130卷8號,2010年<日本信号技報 VOL.36 ,No.1,2012
34. 化生順治:「鉄道技術の展開コムトラックの開発―より安全で正確な運転管理システムの實現をめさして」、鉄道車両と技術,Vol.9.No.10-12,2003
35. 化生順治:The COMTRAC computer aided traffic control system and the second Control Center for the Tokaido-Sanyo Shinkansen:International IRCA/UIC Railway Seminar July 1999
36. 北原文夫:「自律分散型列車運行管理システム」、電気学会誌、Vol.119,No.2,1999
37. 安本高典,大知史,永吉申作,中島正貴車両運用計画システムの開発―到着予想に基づくダイヤ乱れへの対応―,第46回鉄道サイバネ・シンボジウム論文集,論文番号540,2009
38. 江崎昭:「輸送の安全から見た鉄道史」、グランプリ出版,1998
39. 列車ダイヤ研究会:「列車ダイヤと運行管理」,成山堂局,Vol.5,2008
40. 列車ダイヤ研究会:「列車ダイヤと運行管理」,成山堂局,Vol.6,No.78,2008
41. 列車ダイヤ研究会:「列車ダイヤと運行管理」,成山堂書局,Vol.11,No.198,2008
42. 有澤太一:JR東日本ATOS導入のあらまし,鉄道ピクトリアル,Vol.57,No.9,pp52-57,2007
43. 阪田貞之:「列車ダイヤのはなし」,中公新書,1964
44. 呂則信,『軌道電力機車技術』,科技圖書,2006.4
45. 佐藤達広,江口俊宏,村田智洋:「GA・ヒューリスティック融合スケジューリング方式一車両転線計画の作成」,情報処理学会人工生命とその応用シンポジウム,1997
46. 林永峰 (2007) “A Study on Agent Communication over the Semantic Web” 博士論文, 國立中央大學資訊工程學系, 桃園, 台灣,2007
47. 林廷原 (2012) “使用JADEX 開發代理人系統 Using JADEX to Develop an Agent System” 碩士論文,國立中央大學資訊工程學系, 桃園, 台灣,2012
48. 岩本孝雄:「東京圈輸送管理システム「AT0S」が稼動」、JRガゼット、Vol.55.No3.,1997
49. 何庭武、陳德哲、周建成(2014), “應用智慧型代理人技術於台灣高鐵列車緊急事故調度研究,” 中華民國運輸學會103年學術論文國際研討會,南投,台灣.
50. 周建成,陳德哲,”台灣南北高速鐵路BOT案與資產管理整合之探討,” 中華道路季刊,vol49,No.1,pp19-30,2010.04
51. 松本雅行:無線利用の列車控制システム(JRTC)の規格化,鐵道と電氣技術Vol.18,No.7,pp.46-50,2007
52. 青柳宗之:デジタル列車無線を使用した代用保安用のATCの開發,JREA, Vol.48,No.5,pp.12-16,2005
53. 高鐵的營運事故—以茂林地震為例, 科學發展 2011年12月,468期 鄭永祥
54. 高鐵售票通路及營收管理之應用, 專題演講 at 中央大學土木學系(2013) 鄭永祥
55. 長崎祐作,古関隆章: 都市近郊鉄道における運転整理案の作成と評価・電気鉄道研究会,TER-02-63,2002
56. 畑崎直紀:北京地下鉄15号線CBTC開業,日本信号技報 VOL.36 No.1, 2012
57. 宮脇俊三(編): 「時刻表でたどる鉄道史」,JTBキャンブックス,JTB,1998
58. 宮下創:「電光石火のダイヤ改正」,運転協会誌,45巻1号,pp.39-43,2003.1日本鉄道運転協会
59. 栗田晃,八木誠:無線通訊式ATC(SPARCS),第14回鉄道技術連合シンポジウム,2007
60. 荻原浩史,栗田晃,畑崎直紀:北京地下鉄15号線CBTC開業,日本信号技報 VOL.36 No.1 ,2012
61. 新井衛:無線測距式CBTCシステム 車上裝置の開發,第42回鐵道サイバネ・シンポジウム,論文523,2005
62. 電気学会・鉄道における運行計画・運行管理業務高度化に関する調查專門委員會(編):鉄道ダイヤ回復の技術,オーム社,pp.41,2010
63. 富井規雄,周利剣,福村直登:「確率的局所探索とPERTを組み合わせた駅構内入換計画作成アルゴリズム」,電学論,Vol.119-C,No.3,1999.
64. 富井規雄: ダイヤの乱れを克服するー鉄道の運行管理システムの現狀と今後, 情報処理,Vol.44,No.8,2003
65. 富井規雄,田代善昭,田部典之,平井 力,村木国滿:利用者の不滿を最小にする列車運転整理案作成アルゴリズム, 情報処理学会第46回数理モデル化と問題解決研究發表會,2003-MPS-46(11),2003
66. 富井規雄(編):「鉄道ダイヤのひみつ」,Vol.3,No.15,成山堂,2006
67. 富井規雄(編):「鉄道ダイヤのひみつ」,Vol.5,No.137,成山堂,2006
68. 富井規雄(編):「鉄道ダイヤ回復の技術」,Vol.1,No.8,オーム社,2010
69. 富井規雄(編):「鉄道ダイヤ回復の技術」,Vol.7,No.113,オ-ム社,2010
70. 富井規雄(編): 「 鉄道ダイヤのつくりかた」,Vol.2,No.34,オーム社,2012
71. 富井規雄(編): 「 鉄道ダイヤのつくりかた」,Vol.2,No.38,オーム社,2012
72. 富井規雄(編): 「 鉄道ダイヤのつくりかた」,Vol.3,No.43,オーム社,2012
73. 富井規雄:「定時運行の科学」,成山堂書店,近刊,2013
74. 鉄道図書刊会 鉄道 57卷9号,pp18-24,2007.9
75. 鉄道図書刊行会,鉄道ビクトリアル57巻9号,pp.18-24.2007.9
76. 葛西隆也:RS-ATC(東北、上越新幹線の無線ATC),鐵道電氣技術Vol.22,No.01,pp.19-24,2011 |