參考文獻 |
[1] 許振廷、許智為、黃宏銘、鄭尊仁,「光伏發電對配電系統之影響評估」,中華民國第二十九屆電力工程研討會論文集,台灣台南,2008年12月,第1834-1838頁。
[2] A. Soroudi, “Possibilistic-scenario model for DG impact assessment on distribution networks in an uncertain environment,”IEEE Trans. Power Syst., vol. 27, no. 3, pp.1283-1293, 2012.
[3] D. Zhu, R. P. Broadwater, K. Tam, R. Seguin, and H. Asgeirsson, “Impact of DG placement on reliability and efficiency with time-varying loads,” IEEE Trans. Power Syst., vol. 21, no. 1, pp. 419-427, 2006.
[4] A. Asrari, T. Wu, and S. Lotfifard, “The Impacts of distributed energy sources on distribution network reconfiguration,” IEEE Trans. Energy Convers., vol. 31, no. 2, pp. 606-613, 2016.
[5] M. Cresta, F. M. Gatta, A. Geri, M. Maccioni, A. Mantineo, and M. Paulucci, “Optimal operation of a low-voltage distribution network with renewable distributed generation by NaS battery and demand response strategy: a case study in a trial site,” IET Renew. Power Gen., vol. 9, no. 6, pp. 549-556, 2015.
[6] B. Hayes, I. Hernando-Gil, A. Collin, G. Harrison, and S. Djokić, “Optimal power flow for maximizing network benefits from demand-side management,” IEEE Trans. Power Syst., vol. 29, no. 4, pp. 1739-1747, 2014.
[7] E. Azad-Farsan, S. M. M. Agah, H. Askarian-Abyaneh, M. Abedi, and S. H. Hosseinian, “Stochastic LMP (Locational marginal price) calculation method in distribution systems to minimize loss and emission based on Shapley value and two-point estimate method,” Energy, vol. 107, pp. 396–408, 2016.
[8] D. S. Kirschen and H. P. Van Meeteren, “MW/voltage control in a linear programming based optimal power flow,” IEEE Trans. Power Syst., vol. 3, no. 2, pp. 481-489, 1988.
[9] D. I. Sun, B. B. Ashely, A. Hughes, and W. F. Tinney, “Optimal power flow by newton approach,” IEEE Power Eng. Rev., Vol. PAS-103, pp.2864-2880, 1984.
[10] 林祐諄,「考慮再生能源之最佳化快速機率潮流以求解無效電力」,碩士論文,中央大學,2012年6月。
[11] 游博升,「工廠電力系統中考量不確定性再生能源之最佳化實功發電與需量調派」,碩士論文,中原大學,2013年6月。
[12] Y. Cao, Y. Tan, C. Li, and C. Rehtanz, “Chance-constrained optimization-based unbalanced optimal power flow for radial distribution networks,” IEEE Trans. Power Deliv., vol. 28, no. 3, pp. 1855-1864, 2013.
[13] A. Rabiee and A. Soroudi, “Stochastic multiperiod OPF model of power systems with HVDC-connected intermittent wind power generation,” IEEE Trans. Power Deliv., vol. 29, no. 1, pp. 336–344, 2014.
[14] G. Mokryani and P. Siano, “Evaluating the integration of wind power into distribution networks by using Monte Carlo simulation,” Int. J. Electr. Power Energy Syst., vol. 53, pp. 244–255, 2013.
[15] C. S. Saunders, “Point estimate method addressing correlated wind power for probabilistic optimal power flow,” IEEE Trans. Power Syst., vol. 29, no. 3, pp.1045-1054, 2014.
[16] J. Usaola, “Probabilistic load flow in systems with wind generation,” IET Gener. Transm. Distrib., vol. 3, no. 12, pp. 1031–1041, 2009.
[17] 楊豐碩、張鼎煥、陳雅琴、黃君浩、丁蕙萱、施雅慧,「我國引用德國再生能源饋網電價配套措施之可行機制評析」,行政院環境保護署,EPA-99-FA11-03-A202,2012年2月。
[18] H. Poser, J. Altman, F. ab Egg, A. Granata, and R. Board, “Development and integration of renewable energy: lessons learned from germany,” Finadvice, FAA Financial Advisory AG, Switzerland, July 2014.
[19] Global Wind Energy Council(GWEC). [Online]. Available: http://www.gwec.net/global-figures/graphs/
[20] GTM Research: Global Solar PV Installations Grew 34% in 2015. [Online]. Available: http://goo.gl/81KxT4
[21] Y. Yang, P. Enjeti, F. Blaabjerg, and H. Wang, “Wide-scale adoption of photovoltaic energy: grid code modifications are explored in the distribution grid,” IEEE Ind. Appl. Mag., vol. 21, no. 5, pp.21-31, 2015.
[22] T. Ackermann, E. M. Carlini, B. Ernst, F. Groome, A. Orths, J. O′Sullivan, M. T. Rodriguez, and V. Silva, “Integrating variable renewables in Europe : current status and recent extreme events,” IEEE Power Energy Mag., vol. 13, no. 6, pp.67-77, 2015.
[23] European Network of Transmission System Operators for Electricity, “Solar eclipse impact analysis,” ENTSOE, Feb. 2015.
[24] 中國國家能源局,國家能源局關於做好三北地區可再生能源消納工作的通知,國能監管39號,2016年02月。
[25] L. Jiang, C. Wang, Y. Huang, Z. Pei, S. Xin, W. Wang, S. Ma, and T. Brown, “Growth in wind and sun : integrating variable generation in China,” IEEE Power Energy Mag., vol. 13, no. 6, pp.40-49, 2015.
[26] 中華民國-再生能源發展條例,華總一義字第 09800166471 號,2009年 7 月 8 日。
[27] 經濟部能源局-陽光屋頂百萬座計畫,[Online]. Available: http://goo.gl/RP0Ybx
[28] 經濟部能源局網站,[Online]. Available: www.moeaboe.gov.tw/
[29] 台灣電力公司-台灣電力股份有限公司再生能源發電系統併聯技術要點,[Online] Available: http://goo.gl/7XWZub
[30] 卓明遠、張文曜,「配電線路因異常電壓引起用戶器具燒損之保護研究」,台灣電力股份有限公司,台北,TPC -546-4835-0101,2014年。
[31] N. Nimpitiwan, G. T. Heydt, R. Ayyanar, and S. Suryanarayanan, “Fault current contribution from synchronous machine and inverter based distributed generators,” IEEE Trans. Power Deliv., vol. 22, no. 1, pp. 634-641, 2007.
[32] IEEE 1547 Standard for Interconnecting Distributed Resources with Electric Power Systems, 2013.
[33] 台灣電力公司-電力系統諧波管制暫行標準,1993年。[Online]. Available:
http://www.taipower.com.tw/content/UHV/UHV01-1.aspx?UType=3&sid=6
[34] P. E. Sutherland, “Ensuring stable operation with grid codes: a look at Canadian wind farm interconnections,” IEEE Ind. Appl. Mag., vol. 22, no. 1, pp. 60-67, 2016.
[35] “Guidelines for applicants connecting distributed generation,” Halton Hills Hydro, 2015. [Online]. Available: http://goo.gl/NhaRBS
[36] Grid Code: High and Extra High Voltage, E. ON Netz GmbH Tech. Rep., 2006, Status: 1.
[37] X. F. Wang, Y. Song, and M. Irving, “Modern power systems analysis,” New York: Springer, 2008.
[38] 鄧人豪,「配電系統三相解耦負載潮流之研究及其模型應用」,博士論文,國立中山大學,1996年6月。
[39] B. Venkatesh and R. Ranjan, “Data structure for radial distribution system load flow analysis,” IEE Proc. Generat. Transm. Distrib., vol. 150, no. 1, pp. 101–106, 2003.
[40] R. M. Ciric, A. P. Feltrin, and L. F. Ochoa, “Power flow in fourwire distribution networks—general approach,” IEEE Trans. Power Syst., vol. 18, no. 4, pp. 1283–1290, 2003.
[41] M. Dilek, F. de León, R. Broadwater, and S. Lee, “A robust multi-phase power flow for general distribution networks,” IEEE Trans. Power Syst., vol. 25, no. 2, pp. 760–768, 2010.
[42] R. D. Zimmerman and H. D. Chiang, “Fast decoupled power flow for unbalanced radial distribution system analysis,” IEEE Trans. Power Syst., vol. 10, no. 4, pp. 2045-2052, 1995.
[43] P. Aravindhababu, S. Ganapathy, and K. R. Nayar, “A novel technique for the analysis of radial distribution systems,” Int. J. Electr. Power Energy Syst., vol. 23, no. 3, pp. 167–171, 2001.
[44] S. N. G. Naik, D. K. Khatod, and M. P. Sharma, “Analytical approach for optimal siting and sizing of distributed generation in radial distribution networks,” IET Gener. Transm. Distrib., vol. 9, no. 3, pp.209-220, 2015.
[45] V. H. M. Quezada, J. R. Abbad, and T. G. S. Roman, “Assessment of energy distribution losses for increasing penetration of distributed generation,” IEEE Trans. Power Syst., vol. 21, no. 2, pp.533–540, 2006.
[46] N. Rajaei and M. M. A. Salama, “Management of fault current contribution of synchronous DGs using inverter-based DGs,” IEEE Trans. Smart Grid, vol. 6, no. 6, pp.3073–308, 2015.
[47] J. T. Carson, “Wave propagation in overhead wires with ground return”, Bell System Technical Journal, vol. 5, no. 4, pp. 539-554, 1926.
[48] W. H. Kersting, “Distribution system modeling and analysis”, CRC Press, 2012.
[49] J. H. Teng, “A direct approach for distribution system load flow solutions,” IEEE Trans. Power Deliv., vol. 18, no. 3, pp. 882–887, 2003.
[50] 陳朝順、許振廷、林嘉宏,「微電網系統暫態減緩之智慧型控制技術建立」,行政院原子能委員會,2012年 12 月。
[51] IEEE Standard for Interconnecting Distributed Resources with Electric Power Systems, Standard 1547-2003, 2014.
[52] R. Carnieletto, D.I. Brandão, S Suryanarayanan, F.A. Farret, and M.G. Simões, “Smart grid initiative,” IEEE Ind. Appl. Mag., vol. 17, no. 5, pp. 27-35, 2011.
[53] M. S. Phadke著,黎正中譯,「穩健設計之品質工程」,第一版,台北市:台北圖書有限公司,1993年1月。
[54] 李輝煌,「田口方法 : 品質設計的原理與實務」,第四版,高力圖書,2011年5月。
[55] 清華大學品質研究中心-田口式品質工程,專訪世界品質大師田口玄一博士,[Online]. Available: http://goo.gl/I2CfUa
[56] D.C. Montgomery, “Design and analysis of experiments”, 8th ed, John Wiley& Sons, 2012.
[57] Y. Y. Hong, F. J. Lin, and T. H. Yu, "Taguchi method-based probabilistic load flow studies considering uncertain renewables and loads," IET Renew. Power Gen., vol. 10, no. 2, pp. 221-227, 2016.
[58] M. V. M. Nguyen, “Some new constructions of strength 3 mixed orthogonal arrays,” J. Stat. Plan. Infer., vol. 138, no. 1, pp. 220-233, 2008.
[59] C.Y. Suen, A. Das, and A. Dey, “On the construction of asymmetric orthogonal arrays,” Statistica Sinica 11, pp.241-260, 2011.
[60] T. F. Zhang, Y. Y. Zong, and A. Dey, “On the construction of asymmetric orthogonal arrays,” J. Stat. Plan. Infer., vol. 170, pp. 77–82, 2016.
[61] K.Y. Chan, C.K. Kwong, H. Jiang, M.E. Aydin, and T.C. Fogarty, “A new orthogonal array based crossover, with analysis of gene interactions, for evolutionary algorithms and its application to car door design,” Expert Syst. Appl., vol. 37, no. 5, pp.3853-3862, 2010.
[62] A. M. Omekanda, “Robust torque and torque-per-inertia optimization of a switched reluctance motor using the Taguchi methods,” IEEE Trans. Ind. Appl., vol. 42, no. 2, pp. 473–478, 2006.
[63] A. Klein, A. Awada, B. Wegmann, and I. Viering, “Optimizing the radio network parameters of the long term evolution system using Taguchi′s method,” IEEE Trans. Veh. Technol., vol. 60, no. 8, pp. 3825–3839, 2011.
[64] 羅錦興,「田口品質工程指引」,第一版,中國生產力中心,1999年5月。
[65] 徐世輝,「品質管理」,第一版,前程文化,2007年9月。
[66] 林雲德,「應用田口方法改善接觸式三次元測量儀量測品質」,碩士論文,國立交通大學,2008年7月。
[67] R. N. Kacker, E. S. Lagergren, and J. J. Filliben, “Taguchi’s orthogonal arrays are classical designs of experiments,” J. Res. Natl. Inst. Stand. Technol., vol. 96, no. 5, 1991.
[68] S. Conti and S. Raiti, “Probabilistic load flow using Monte Carlo techniques for distribution networks with photovoltaic generators,” Sol. Energy, vol.81, no. 12, pp. 1473–1481, 2007.
[69] P. Chen, Z. Chen, and B. Bak-Jensen, “Probabilistic load flow: A review” Third International Conference on Electric Utility Deregulation and Restructuring and Power Technologies, Nanjuing, 2008, pp. 1586-1591.
[70] M Hajian, W. D. Rosehart, and H. Zareipour, “Probabilistic power flow by Monte Carlo simulation with latin supercube sampling,” IEEE Trans. Power Syst., vol. 28, no. 2, pp. 1550-1559, 2013.
[71] R. N. Allan, A. M. L. da Silva, and R. C. Burchett, “Evaluation methods and accuracy in probabilistic load flow solutions,” IEEE Trans. Power Appar. Syst., vol. PAS-100, no. 5, pp. 2539-2546, 1981.
[72] P. Zhang and S. T. Lee, “Probabilistic load flow computation using the method of combined cumulants and Gram-Charlier expansion,” IEEE Trans. Power Syst., vol. 19, no. 1, pp. 676–682, Feb. 2004.
[73] C. L. Su, “Probabilistic load-flow computation using point estimate method,” IEEE Trans. Power Syst., vol. 20, no. 4, pp. 1843–1851, 2005.
[74] X. Ai, J. Wen, T. Wu, and W. J. Lee, “A discrete point estimate method for probabilistic load flow based on the measured data of wind power’, IEEE Trans. Ind., vol. 49, no. 5, pp. 2244–2252, 2013.
[75] R. K. Roy, “Design of experiments using the Taguchi approach,” 1st ed, John Wiley & Sons Inc., 2001.
[76] H.Yu and W. D. Rosehart, “An optimal power flow algorithm to achieve robust operation considering load and renewable generation uncertainties,” IEEE Trans. Power Syst., vol. 27, no. 4, pp. 1808–1817, 2012.
[77] S. H. Low, “Convex relaxation of optimal power flow—Part I: formulations and equivalence, IEEE Trans. Control of Netw. Syst., vol.1, no.1, pp. 15-27, 2014.
[78] J. Carpentier, “Contribution to the economic dispatch problem,” Bull. Soc. Francoise Electr., vol. 3, no. 8, pp. 431–447, 1962.
[79] K. Y. Lee, J. L. Ortiz, M. A. Mohtadi, and Y. M. Park, “Optimal operation of large-scale power systems”, IEEE Trans. Power Syst., vol. 3, no. 2, pp. 413–420, 1988.
[80] F. Zhuang and F.D. Galiana, "Towards a more rigorous and practical unit commitment by Lagrangian relaxation," IEEE Trans. Power Syst., vol. 3, no. 2, pp. 763-773, 1988.
[81] 黃琮暉,「應用最佳化電力潮流於電力系統復電策略之研究」,博士論文,國立中山大學,2008年6月。
[82] N. Mo, Z. Y. Zou, K. W. Chan, and T. Y. G. Pong, “Transient stability constrained optimal power flow using particle swarm optimisation”, IET Gener. Transm. Distrib., vol. 1, No. 3, pp. 476-483, 2007.
[83] V. J. Gutierrez-Martinez, C. A. Canizares, C. R. Fuerte-Esquivel, A. Pizano-Martinez, and X. Gu, “Neural-network security-boundary constrained optimal power flow”, IEEE Trans. Power Syst., vol. 26, no. 1, pp. 63-72, 2011.
[84] 李炯頤,「利用潮流分配因子計算電力損失及節點電價」,碩士論文,國立清華大學,2009年6月。
[85] T. J. Overbye, X. Cheng, and Y. Sun, “A comparison of the AC, and DC power flow models for LMP calculations,” in Proc. 37th Hawaii Int. Conf. Syst. Sci., 2004, pp. 5–8.
[86] B. Stott, J. Jardim, and O. Alsaç, “DC power flow revisited,” IEEE Trans. Power Syst., vol. 24, no. 3, pp. 1290–1300, 2009.
[87] K. S. Pandya and S. K. Joshi, "A survey of optimal power flow methods", Journal of Theoretical and Applied Information Technology, vol. 4, no. 5, pp. 450-458, 2008.
[88] J. A. Momoh, “Electric power system allications of optimization”, Marcel Dekker Inc.,2001.
[89] 林士鈞,「考慮澎湖離岸式風力發電與台澎海底電纜之特殊保護系統」,碩士論文,中原大學,2006年7月。
[90] 吳天明,「台電在台灣本島及離島推動風力發電概況報導」,源雜誌,第九十一期,第4-13頁,2012年1月。
[91] 余勝雄,「我國風力發電現況及展望」,永續產業發展雙月刊,第三十五期,第16-21頁,2007年。
[92] 台灣電力公司負載特性與機型配比,[Online]. Available: http://goo.gl/c2ggCx |