參考文獻 |
[1] Acutronic, Civil Engineering Centrifuge Model 665-1 Installation Manual 5941E, France (1992).
[2] Acutronic, Geotechnical Centrifuge Model 665-1 Product Description 5933H, France (1993).
[3] Atkinson, J. H., and Potts, D. M.,“Subsidence above shallow tunnels in soft ground,”Journal of Geotechnical Engineerimg, ASCE, Vool. 103,No. GT4, pp. 307-325 (1977).
[4] Attewell, P. B., Yeates, J., and Selby, A. R.,“Soil movements induced by tunneling and their effects in pipelines and structures,”Blackie and Son Ltd., London (1986).
[5] Attewell, P. B.,“Engineering contract, site investigation and surface movements in tunneling works,”Soft Ground Tunneling: Failures and Displacements, Rotterdam, pp. 5-12 (1981).
[6] Bezuijen, a., Schrier, J.V. D.,“The influence of a bored tunnel on pile foundations,”Centrifuge 94,edted by Lee and Tan, Balkema, Rottterdam, pp. 681-686 (1994).
[7] Broms, B. B.,“Lateral resistance of piles in cohesive soil,”Jounal of the Soil Mechanics and Foundations Division SM2, ASCE, Vol. 90, pp. 27-63 (1964).
[8] Chambon, P. and Corté, J.F.,“Shallow tunnels in cohesionless soil: stability of tunnel face,”Journal of Geotechnical Engineering, ASCE, Vol. 120, No. 7, pp. 1148-1165 (1994).
[9] Chambon, P., Corté, J.F., and Garnier,J.,“Face stability of shallow tunnels in granular soils,”Proceedings, International Conference Centrifuge 91, Boulder, Colorado, pp. 99-105 (1991).
[10] Chen, L. T., Poulos, H. G., and Hull, T. S.,“Model tests on pile groups subjected to lateral soil movement,”Soils and Foundations, Vol. 37, No. 1, pp. 1-12 (1997).
[11] Chen, L. T., Poulos, H. G., and Loganathan, N.,“Pile responses caused by tunneling,” Journal of Geotechnical and Geoenvironmental Engineering, ASCE, Vol. 125, No. 3, pp. 207-215 (1999).
[12] Clough, G. W., and Schmidt, B.,“Design and performance of excavations and tunnels in soft clay,”In Soft Clay Engineering, edited by Brand, E. W., and Brenner, R. P., pp. 600-634 (1981).
[13] Cording, E. J., and Hansmire, W. H.,“Displacement around soft ground tunnels,”Proc. 6th Panamerican Conf. On Soil Mech. AndFound. Eng., Buenon Aires, pp. 571-633 (1975).
[14] Deane, A. P., and Bassett, R. H.,“The Heathrow Express trial tunnel,”Proc. Institution of Civil Enginnering, Geotechnical Engineering, Vol. 113, pp. 114-156 (1995).
[15] Fang, Y. S., Pan, M. D., and Lin, G. J.,“Time and settlement in EPB shield tunneling,”Tunnels and Tunnelling, pp. 27-28 (1993).
[16] Fretti, C., Lo Presti, D. C. F., and Pedroni, S.,“A pluvial deposition method to reconstitute Well-Graded sand specimen,”Geotechnical Testing Journal, GTJODJ, Vol. 18, No. 2, pp. 292-298 (1995).
[17] Fujita, K.,“Prediction of surface settlements caused by shield tunnelling,”Proceedings, International Conference on Soil Mechanics, Mexico City, Vol. 1, pp. 239-246 (1982).
[18] Ito, T., Matsui, T., and Hong, W. P.,“Design method for stabilizing pile against landslide-one row of piles,”Soils and Foundations, Vol. 21, No. 1, pp. 21-37 (1981).
[19] Ito, T., Matsui, T., and Hong, W. P.,“Design method of stabilizing piles against landslide - one row of piles,” Soils and Foundations, Vol. 21, No. 1, pp. 21-38 (1981).
[20] Lee, C. J., Wu, B. R, and Chiou, S. Y.,“Soil movements around a tunnel in soft soils,”Proc. Natl. Sci. Counc. ROC, series A, Vol. 25, No. 2, pp. 235-247 (1999)
[21] Loganathan, N., and Poulos, H. G.,“Analytical prediction for tunneling-induced ground movements in clays.”Journal of Geotechnical and Geoenvironmental Engineering, ASCE, Vol. 120, No. 7, pp. 846-856 (1998).
[22] Loganathan, N.,Poulos, H. G., and Xu, K. J., “Ground pile-group responses due to tunnelling.” Soils and Foundations, Vol. 41, No. 1, pp. 57-67 (2001).
[23] Longanathan, N., Poulos H.G., and Stewart, D.P.,“Centrifuge model testing of tunnelling-induced ground and pile deformations,”Geotechnique, Vol. 50, No. 3, pp. 283-294 (2000).
[24] Mair, R. J., Taylor, R. N., and Bracegirdie, A.,“Subsurface settlement profiles above tunnels in clays,”Geotechnique, Vol. 43, No. 2, pp. 315-320 (1993).
[25] Matsui, T., Hong, W. P., and Ito, T.,“Earth pressures on piles in a row due to lateral soil movements,”Soils and Foundations, Vol. 22, No. 1, pp. 71-81 (1982).
[26] Mezazigh, J., Favraud, C. and Levacher, D., “Effect of Slope and Soil Density on P-Y Curves for Piles in Sand,” Centrifuge 94, pp. 503~508 (1994).
[27] Nomoto, T., Imamura, S., Hagiwara, T., Kusakabe, O., and Fujii, N.,“Shield tunnel construction in centrifuge,”Journal of Geotechnical and Geoenvironmental Engineering, ASCE, Vol. 125, No. 4, pp. 289-300 (1999).
[28] O’Reilly, M. P., and New, B. M.,“Settlements above tunnels in the United Kingdom – their magnitude and prediction,”Tunnelling’82, pp. 173-240 (1982).
[29] Peck, R. B.,“Deep Excavation and tunneling in soft ground,” State of Art, Proc. 7th Int. Conf. On Soil Mech. Found. Eng., State of Art Volume, pp. 225-290 (1969).
[30] Poulos, H. G., and Chen, L. T.,“Pile response due to excavation–induced lateral soil movement,”Journal of Geotechnical and Geoenvironmental Engineering, ASCE, Vol. 123, No. 2, pp. 94-99 (1997).
[31] Poulos, H. G., and Davis, E. H., Pile foundation analysis and design, Wiley, New York, pp. 311-322 (1980).
[32] Poulos, H. G., Chen, L. T., and Hull, T. S.,“Model tests on pile groups subjected to lateral soil movement,”Soils and Foundations, Vol. 37, No. 1, pp. 1-12 (1997).
[33] Poulos, H. G., Chen, L. T., and Hull, T. S.,“Model tests on single piles subjected to lateral soil movement,”Soils and Foundations, Vol. 35, No. 4, pp. 85-92 (1995).
[34] Poulos, H. G.,“Analysis of piles in soils undergoing laternal movements,” Jounal of the Soil Mechanics and Foundations Division SM5, ASCE, Vol. 99, pp. 391-406 (1973).
[35] Rowe, R.K. and Kack, G.J.,“A theoretical examination of the settlements induced by tunnelling: four case histories,”Canadian Geotechnical Journal, Vol. 20, pp. 299-314 (1983)
[36] Springman, S. M., and Bolton, M. D.,“Modeling the behavior of piles subjected to surcharge loading,”Centrifuge 91,edted by Ko., Balkema, Rottterdam, pp. 253-260 (1991).
[37] Stewart, D. P., Jewwll, R. J., and Randolph, M. F.,“Numerical modeling of piled bridge abutments on soft ground,”Computers and Geotechnics, Vol. 15, pp. 21-46 (1993).
[38] Taylor, R.N.,“Tunnelling in soft ground in the UK,”Proceedings, International Symposium on Underground Construction in Soft Ground, Balkema, Rotterdam, pp. 123-126 (1995).
[39] Verruijt, A. and Booker, J.R.,“Surface settlements due to deformation of a tunnel in an elastic half plane,”Geotechnique, Vol. 46, No. 4, pp. 753-756 (1996).
[40] Wang, J.J. and Chang, C.T.,“Subsurface subsidence due to tunnelling by EPB shield,”Proceedings, South East Asian Symposium on Tunnelling and Underground Space Development, Japan Tunnelling Association, Bangkok, pp. 217-222 (1995).
[41] 王繼勝等人,「潛盾工法與地表沉陷」,地工技術雜誌,第二十三期,第72-83頁(1988)。
[42] 李崇正,林志棟,林俊雄,「大地工程研究者知新工具:離心模型試驗」,岩盤工程研討會論文集,中壢,第649-669頁(1994)。
[43] 周小文,「盾构隧道土压力离心模型试验及理论研究」,博士论文,清华大学水利水电工程系,北京 (1999)。
[44] 林俊雄,「離心模型黏土試體之準備與強度標定」,碩士論文,國立中央大學土木工程學系,中壢(1995)。
[45] 邱顯堯,「並行雙隧道變形之互制行為」,碩士論文,國立中央大學土木工程學系,中壢(1997)。
[46] 莊孟翰,「未襯砌隧道壁變形引致地盤下限分布形態分析」,碩士論文,國立中央大學土木工程學系,中壢(1996)。
[47] 陳秋宗,「台北市潛盾隧道施工對地盤沉陷之影響」,碩士論文,國立交通大學土木工程系,新竹 (1988)。
[48] 黃南輝、黃奕洋、黃姿連、楊鵬飛,「潛盾隧道施工所導致之沉陷槽分析」,捷運施工及托底工程研討會,財團法人地工技術研究發展基金會,高雄,第37-48頁 (1997)。
[49] 歐晉德,「基樁受填土影響之側向力問題」,地工技術雜誌,第十八期,第8-13頁(1987)。 |