摘要(英) |
Recently, Building Information Modeling (BIM) technology continues its quick development. The client makes the decision about whether to adopt BIM or not, and takes the key position of how to use BIM. However, most of the client adopts BIM technology blindly and usually decides to implement unsuitable BIM uses. In Taiwan, the government has clearly started to adopt BIM in public construction works. It is necessary to have a definite approach for the potential user to select suitable BIM uses for each public construction project with BIM applications. Although there are a lot of BIM uses for adoption, there is no systematical approach that contains essential evaluation structure and criteria. For solving the problem of selecting suitable BIM uses for adoption, this study determines tangible BIM uses for public construction works in Taiwan based on certain of BIM guides and a survey on domain experts, analyzes available evaluation approaches and then develops a systematical approach that contains a framework and necessary procedures. The proposed procedures consist of determining implementation stage in a project’s life cycle, determining BIM application objective(s), selecting application deliverables and confirming necessary BIM software/resources and the capability of BIM implementation team. Based on a preliminary test using three real cases, the workability of proposed approach has been proved. |
參考文獻 |
1.Chuck Eastman, Paul Teicholz, Rafael Sacks, Kathleen Liston, (2011),“BIM Handbook: A Guide to Building Information Modeling for Owners, Managers, Designers, Engineers and Contractors,”Second Edition, Wiley.
2.Deke Smith, (2007),“An Introduction to Building Information Modeling (BIM) ,”Journal of Building Information Modeling, 2007(Fall), pp.12-15.
3.National Institute of Building Sciences, (2017),“National BIM Guide for Owners,” National Institute of Building Sciences.
4.Computer Integrated Construction Research Program, (2013),“BIM planning guide for facility owners V2.0,”The Pennsylvania State University, University Park, PA, USA.
5.Ralph G. Kreider, and John I. Messner, (2013),“The uses of BIM - Classifying and Selecting BIM Uses V0.9,”The Pennsylvania State University, University Park, PA, USA..
6.Penn State University, (2011), “BIM Project Execution Planning Guide V2.1,” The Pennsylvania State University, University Park, PA, USA.
7.Wenchi Shou, Jun Wang, Xiangyu Wang, Heap Yih Chong, (2014),“A Comparative Review of Building Information Modelling Implementation in Building and Infrastructure Industries,” Archives of Computational Methods in Engineering, Vol 22, pp. 291-308.
8.UK, (2012),“AEC (UK) BIM Protocol Project BIM Execution Plan.”
9.丁育群,(2014),內政部營建署於營建工程導入建築資訊模型之推動與應用,中國工程師學會 工程雙月刊,第87卷,05期,第10-17頁。
10.上海市城鄉建設和管理委員會,(2015),上海市建築資訊模型技術應用指南(2015版)。
11.王明德,(2012),建築資訊模型(BIM)如何運作與導入之效益(上),公共工程電子報,第52期。
12.王茂興,(2010),建築物資訊模擬,水利土木科技資訊季刊,第47期,第16-19頁。
13.交通部,(2015),交通部所屬各機關(構)工程建置建築資訊模型(BIM)作業推動原則。
14.何明錦、劉青峰,(2014),借鏡國際作法、構思台灣BIM策略,中國工程師學會 工程雙月刊,第87卷,05期,第18-25頁。
15.余文德、鄭紹材、賴朝俊,(2016),我國BIM協同作業指南執行要項研擬,內政部建築研究所委託研究計畫。
16.邱垂德、余文德、鄭紹材,(2015),我國BIM協同作業指南之研訂-設計與施工階段資訊交換,內政部建築研究所委託研究計畫。
17.楊智斌,(2017),機關辦理公共工程導入建築資訊建模(BIM)技術,行政院公共工程委員會委託專業服務案。
18.康思敏、葛翊凡,(2016),BIM在設施管理上之應用,臺灣建築學會會刊雜誌,第81期,第48-53頁。
19.許俊逸、徐景文、林傑、李文欽,(2014),BIM帶來的變革與政府的前瞻作為,中國工程師學會 工程雙月刊,第87卷,05期,第2-9頁。
20.郭榮欽、謝尚賢,(2011),BIM技術與公共工程,公共工程電子報,第38期。
21.陳瑞鈴、楊智斌,(2016),國內外推動BIM之策略與成效比較研究,內政部建築研究所協同研究計畫。
22.臺大BIM研究中心,(2015),業主BIM 實施方針之擬定指引 (2015版),臺大土木工程資訊模擬與管理研究中心。
23.謝定亞,(2012),BIM作業模式,法律爭議停看聽,營建資訊,第353期,第28-37頁。
24.謝尚賢,(2015),BIM發展應用 業主角色關鍵,營建知訊,第389期,第59-62頁。
25.謝尚賢、劉朝翔,(2014),給業主的BIM導入指引,營建知訊,第372期,第59-62頁。 |