摘要(英) |
Failure mode and effect analysis is one of the well-known important management concepts and risk control technologies. It is centered on the improvement demand of the process or
supply chain. The implementation focus is to find the real cause of the failure of target expectation. Taking this study as an example, it is to explore the causes of poor products,process errors and design errors, analyze the use Cause & Effect Analysis, implement corrective,preventive and tracking measures with PDCA, and strive to confirm the improvement effect to meet or even exceed the expected benchmark of their own products.FMEA also emphasizes the establishment of a project team to actually understand the
entire process sequence and current situation to conduct a comprehensive analysis. A successful FMEA action focuses on being able to control the situation in time before the incident, rather than focusing on handling and placement after the event. This research takes the process orientation as the key research area to analyze the severity of failures, the frequency of occurrence, and the difficulty of detection, such as machine parts, feeding materials, and
production methods, so as to improve product yield and satisfy customers.During the research process, we understand that analyzing process data through team operation mode can optimize operations and communication between departments, and representative case (Enterprise) operations can become more efficient, such as analyzing parts,raw materials, and man-made failure modes under potential failure modes. May affect the results. FMEA also brings a more active and effective process experience, which can optimize product quality and improve company performance and reputation. |
參考文獻 |
[1] 劉昱廷,最新圖解失效模式分析(FMEA)與實務運用(AIAG FMEA:2008 與
新版AIAG VDA FMEA:2019 解說),初版,元神館,新北市,2021。
[2] 趙承琛,界面科學基礎,十九版,復文圖書,台南市,2007。
[3] 廖明隆,界面化學與界面活性劑,初版,鼎文書局,台北市,2008。
[4] 陳紹興,失效模式及效應分析作業手冊,初版,工業局中心衛星工廠制度推動小
組,台北市,1988。
[5] 李建華,新成本與管理會計制度,三版,超越企管顧問公司,台北市,1995。
[6] 小野寺勝重,實踐FMEA 手法,初版,張書文譯,財團法人中衛發展中心,台北
市,2001。
[7] 戴久永,「由活用PDCA 循環談起」,品質管制月刊,36(4),29-31 頁,2000。
[8] 林兆明,「如何靈活運用FMEA 表並建構在管理體制」,品質月刊,43(2),47-
48 頁,2007。
[9] 鄭瑋弘,黃興祝,「製造系統之經濟改善-由失效模式與系統動力觀點」,明新
學報,42(2),37-56 頁,2016。
[10]翁紹仁、龍義琳、陳秉群、蔡柏祥和陳勇泉,「應用FMEA 在太陽能庭園燈電池
儲能系統品質改善」,品質月刊,47(5),20-23 頁,2011。
[11]Almannai, B., Greenough, R., Kay, J.,”A decision support tool based on QFD and
FMEA for the selection of manufacturing automation technologies”, Robotic and
Computer-Integrated Manufacturing,Vol 24, pp. 501–507,2008.
[12]Doggett and A.M.,”Root cause analysis: a framework for tool selection”, Quality
Management,12(4),pp. 34-45, Journal, 2005.
[13]H.C., Liu, L., Liu, N. and Mao, L. X. “Risk evaluation in failure mode and effects
analysis with extended VIKOR method under fuzzy environment”, Expert Systems with
55
Applications,39(17),pp. 12926-12934,2012.
[14]Hellendoorn, H. and Thomas, C.,Fuzzy Logic and Its Applications to Engineering,
Information Sciences, and Intelligent Systems,pp. 167-176,1995.
[15]MindTools, Cause and effect analysis: identifying the likely causes of problems. <http://
www.mindtools.com/pages/article/newTMC_03.htm> (December 7th, 2021),2016.
[16]Seung J. R. and Kosuke I., “Using cost based FMEA to enhance reliability and
Serviceability”, Journal of Advanced Engineering Informatics,Vol 17,3(4),
pp.179-188,2003.
[17]Stamatis, D. H.,Failure mode and effect analysis: FMEA from theory to execution.
Milwaukee : ASQ Quality Press.,2ed,2003.
[18]Kiyoshi S., The New Shop Floor Management : Empowering People for
Continuous Improvement,New York: The Free Press,1993.
[19]World Bank Institute, Fishbone diagrams. Needs assessment knowledge base: tools of
the trade<http://siteresources.worldbank.org/WBI/Resources/2137981194538727144/
9Final-Fishbone.pdf> (December 10th,2021),2007.
[20]Yang, Z. and Wang, J., “Use of fuzzy risk assessment in FMEA of offshore
engineering systems”, Ocean Engineering,Vol 95,pp. 195-204,2015. |