中大機構典藏-NCU Institutional Repository-提供博碩士論文、考古題、期刊論文、研究計畫等下載:
English  |  正體中文  |  简体中文  |  Items with full text/Total items : 78728/78728 (100%)
Visitors : 34351696      Online Users : 516
RC Version 7.0 © Powered By DSPACE, MIT. Enhanced by NTU Library IR team.
Scope Tips:
  • please add "double quotation mark" for query phrases to get precise results
  • please goto advance search for comprehansive author search
  • Adv. Search
    HomeLoginUploadHelpAboutAdminister Goto mobile version
    retired tests [70/70]

    Collection Statistics

    Item counts issued in 3 years: 59(10.67%)
    Items With Fulltext: 553(100.00%)

    Download counts of the item
    Download times greater than 0: 553(100.00%)
    Download times greater than 100: 504(91.14%)
    Total Bitstream Download Counts: 455802(94.40%)

    Last Update: 2024-04-16 16:48


    Top Upload

    Loading...

    Top Download

    Loading...

    RSS Feed RSS Feed
    Jump to a point in the index:
    Or type in a year:
    Ordering With Most Recent First Show Oldest First

    Showing items 426-450 of 553. (23 Page(s) Totally)
    << < 13 14 15 16 17 18 19 20 21 22 > >>
    View [10|25|50] records per page

    DateTitleAuthors
    2007-05-10 惰性礦物摻料對水泥混凝土之物化性質研究; Studied the Influence of using inertia mineral changed the characteristic of cement concrete. 黃詩瀧; shih-lung huang
    2007-03-14 大漢溪上游河川魚類棲地適合度曲線之研究 李永安; Yung-An Li
    2007-02-08 國軍老舊眷村改建工程現況困難問題處置效能之研究; A Study of Problem Handle Efficiency in present of the Aged Military Family Dependant Villages’ Reconstruction 王慕舜; Mu-Shun Wang
    2007-01-16 中華電信會館訂價策略及經營改善模式之研究 蕭俊志; Jung-Jih Shiao
    2007-01-12 瀝青混凝土路面施工品質管理-以雪山隧道為例; Asphalt Concrete Quality Management-example Syueshan Tunnel 林植峰; Chih-Feng Lin
    2007-01-12 軍事工程委託專案管理執行缺失 與改善對策之研究 ;The Research On PCM's Execution Drawbacks And Improvements For The Military Construction 陸宗鑫; Zong-Sin Lu
    2007-01-12 土木工程營建測試實驗室提昇檢驗機構之可行性評估; Feasibility Assessment of Promote Inspection Bodies for Civil Construction Engineering testing Laboratories 宋鴻禧; Hung-Hsi Sung
    2007-01-12 軍事工程委託監造執行現況缺失與問題改善對策之研究; The Reserch on Current Outsourced Supervision’s Drawbacks and Improvements for The Military Construction 何宗欣; Zong-Sin He
    2006-12-21 科技廠房修繕人力派遣最佳化決策模式之研究; Study of decision-making modes for the optimization of manpower assignment in science-tech based facility maintenance 楊宗仁; Tsung-Jen Yang
    2006-11-03 公共工程委辦監造作業品質執行現況與問題改善之研究; The strategies of enhancing supervision for public works – specifically in construction stage 吳翰彰; Wu-han chang
    2006-10-27 新建工程建造執照查核缺失要項之探討--以台北市為例 陳希楷; Hsi-Kai Chen
    2006-07-13 建設公司興建住宅自辦工程採購管理機制之探討; The disscussion of the constructor's engineering procuration management 陳焜陽; Kun-Yang Chen
    2006-07-13 AC-20瀝青混合料鋪面試驗路段之成效評估; The performance evaluation to the test road using AC-20 asphalt concrete mixture as the pavement 楊富程; Fu-Cheng Yang
    2006-07-08 水庫營運效益評估之研究-以石門水庫為例; Reservoir Operational Performance at Financial Viewpoint: A Case Study of Shihmen Reservoir 李忠信; Li-Chung Hsin
    2006-07-08 工程顧問公司專案管理組織績效與型態之研究; Configuration and Performance of Projectized Organization in Engineering Consulting Companies 林正杰; CHENG1-CHIEH LIN
    2006-07-08 剛性鋪面部份深度維修現場施作之材料與工法研究; A Study of Materials and Techniques for Partial Depth Repair of Rigid Pavement 趙創慶; Chaung-Cing Chao
    2006-07-07 河岸保護石籠工法之施工與破壞; Construction and Failure Behaviors of the Gabion on River Bank 廖根遠; Ken-yuan Liao
    2006-07-07 以承包商觀點研析價值工程於鐵路地下化工程之個案研究; Contractor Viewpoint toward Value Engineering: A Case Study of Underground Railroad 黃維焄; Wei-Hsun Huang
    2006-07-06 政府採購決標滿意度評估模型之初步研究; A Preliminary Study toward Mechanism of Contractor Selection for Public Sector 郭成堯; CHENG-YAO KUO
    2006-07-06 預鑄專案成本估算策略之研究 楊坤霖; Gun-Shen Yang
    2006-07-03 電廠知識管理社群評量探討與模擬之研究(以台電北部施工處為例); The power plant knowledge management society group comments the quantity discussion and the simulation research (Take the north construction of Taiwan Telegraphic Transmission as an example ) 傅珍昌; Chen-Chang Fu
    2006-07-03 廢輪胎橡膠瀝青混合料鋪面路段之成效試驗 姜紹平; Shao-Pin Chiang
    2006-06-30 全套管基樁基礎初選模式之最佳化研究; All-casing Pile Foundation Model of Primary Optimization Study 黃志榮; Chin-Jung Huang
    2006-06-30 促進民間參與污水下水道建設(BOT)對地方政府財政影響研究; A Financial Research of District Government on Promoting Private Participation using Build-Operate-Transfer to Construct Sewerage Sewer System 魏茂銹; Mao-Hsiu Wei
    2006-06-30 高科技廠房在工期限制下最佳化排程之研究 -以中華映管無塵室工程為例 ;The research of the best procedures for Hi-tech factory on the limitation of construction time - With the exemplar of clean room construciton of Chunghwa Picture Tubes, Ltd. 戴勝鵬; Sheng-Peng Tai

    Showing items 426-450 of 553. (23 Page(s) Totally)
    << < 13 14 15 16 17 18 19 20 21 22 > >>
    View [10|25|50] records per page

    ::: Copyright National Central University. | 國立中央大學圖書館版權所有 | 收藏本站 | 設為首頁 | 最佳瀏覽畫面: 1024*768 | 建站日期:8-24-2009 :::
    DSpace Software Copyright © 2002-2004  MIT &  Hewlett-Packard  /   Enhanced by   NTU Library IR team Copyright ©   - 隱私權政策聲明