English  |  正體中文  |  简体中文  |  全文筆數/總筆數 : 80990/80990 (100%)
造訪人次 : 41635379      線上人數 : 1378
RC Version 7.0 © Powered By DSPACE, MIT. Enhanced by NTU Library IR team.
搜尋範圍 查詢小技巧:
  • 您可在西文檢索詞彙前後加上"雙引號",以獲取較精準的檢索結果
  • 若欲以作者姓名搜尋,建議至進階搜尋限定作者欄位,可獲得較完整資料
  • 進階搜尋


    請使用永久網址來引用或連結此文件: http://ir.lib.ncu.edu.tw/handle/987654321/1443


    題名: 國軍新興工程作業流程與管理機制之研究-以陸軍作業模式為例;Astudy in the military cinstruction processes management mechanism-example of the Army construction
    作者: 許澤民;Tes-Min Hsu
    貢獻者: 土木工程學系碩士在職專班
    關鍵詞: 軍事工程;生命週期;作業流程與要領;管理機制;Construction processes and;Life-cycle;Military construction
    日期: 2004-11-20
    上傳時間: 2009-09-21 09:29:19 (UTC+8)
    出版者: 國立中央大學圖書館
    摘要: 國軍自88 年「精實案」採聯合後勤體制後,三軍軍事投資工程大多委由 前聯合後勤司令部營產工程署負責辦理;配合「國防二法」後國防體制及權 責之劃分,國軍工程由軍備體系負責督導與執行,前聯合後勤司令部營產工 程署亦於93.1.1 改隸國防部軍備局,編成「工程營產中心」。因「精實案」後 工程人力精簡,原以國軍單位自辦工程設計、監造為主之執行方式,改採委 外為主,自辦為輔。由於工作經驗、專業能力不足及業務協調機制不健全, 三軍委託該中心辦理之委外技術服務工程,常肇生疏失及窒礙,影響整體工 程執行效能。 本研究按國軍組織及分工權責,從陸軍委託工程營產中心代辦工程之立 場,依工程生命週期區分「工程規劃」、「工程設計」及「工程施工及完工」 等階段,分別檢討近年工程執行之缺失及疏漏,並在實務執行層面上研擬改 進之作業流程及作業要領,以建立軍事工程之管理機制,提供相關承辦人員 參考運用。 Since the “Troop-reduction program” adopting combined logistic system in 1999, the Office of the Deputy Chief of Construction & Facilities(ODCCf), Combined Logistic Command is responsible for the supervision and execution of most of the construction projects invested by the armed forces. After the announcement and enforcement of “The National Defense Law” and “The MND organization Law”, the ODCCf has been reorganized and was under the command of the Armaments Bureau on January 1st, which is responsible for the supervision of the military construction. As a result of the inadequate manpower, outsourcing has been the principal method of military construction projects instead of doing them by itself in the past. In addition, due to insufficient work experience, profession, and imperfect coordination mechanism, military construction by ODCCF has aroused obstruction and mistakes, which accordingly affects the overall project performance. Based on the defense organizations and authorities, this research, from ODCCF’s standpoint, thoroughly examines the flaws and oversights over the past few years so as to draw up improved process and important points in practice and management mechanism according to the stages of construction lifecycle: planning, designing, constructing and completing. Results of this research are expected to provide references for those who undertake construction projects in the military.
    顯示於類別:[土木工程學系碩士在職專班] 博碩士論文

    文件中的檔案:

    檔案 大小格式瀏覽次數


    在NCUIR中所有的資料項目都受到原著作權保護.

    社群 sharing

    ::: Copyright National Central University. | 國立中央大學圖書館版權所有 | 收藏本站 | 設為首頁 | 最佳瀏覽畫面: 1024*768 | 建站日期:8-24-2009 :::
    DSpace Software Copyright © 2002-2004  MIT &  Hewlett-Packard  /   Enhanced by   NTU Library IR team Copyright ©   - 隱私權政策聲明