中大機構典藏-NCU Institutional Repository-提供博碩士論文、考古題、期刊論文、研究計畫等下載:Item 987654321/1460
English  |  正體中文  |  简体中文  |  Items with full text/Total items : 78818/78818 (100%)
Visitors : 34700800      Online Users : 1350
RC Version 7.0 © Powered By DSPACE, MIT. Enhanced by NTU Library IR team.
Scope Tips:
  • please add "double quotation mark" for query phrases to get precise results
  • please goto advance search for comprehansive author search
  • Adv. Search
    HomeLoginUploadHelpAboutAdminister Goto mobile version


    Please use this identifier to cite or link to this item: http://ir.lib.ncu.edu.tw/handle/987654321/1460


    Title: 公共工程以統包方式辦理採購所衍生問題與對策研究;Study of Turnkey Procurement for Public Construction Projects Development and Remedies
    Authors: 林建志;Chen-Chih Lin
    Contributors: 土木工程學系碩士在職專班
    Keywords: 公共工程;統包工程;最有利標;採購策略;Procurement Strategy;The Most Advantageous Tender;Public Construction Project;Design/Build Project
    Date: 2005-04-09
    Issue Date: 2009-09-21 09:29:39 (UTC+8)
    Publisher: 國立中央大學圖書館
    Abstract: 公共工程以統包方式辦理採購,雖可改善傳統發包方式之設計期程長、 施工界面複雜、低價搶標、施工品質低落等缺點,惟目前全國各機關以統包 方式辦理招標,以非工程專責機關辦理之統包案件最多。因非工程專責機 關,其編制內並無工程專業人員,或專業人員編制不足,致無法勝任統包採 購之備標與評選、設計圖說審查、施工監造及驗收等工作,造成執行過程諸 多缺失,影響公共工程執行效率。 本研究結果提出公務部門辦理統包案件於客觀條件分析、招標及 決標方式之前置作業選擇、備標文件準備、招標及決標辦理過程及履 約管理等五個階段執行缺失之各項矯正意見,並以審計人員之觀點, 提出公務部門執行統包工程應行改進事項供各機關執行統包工程參 考。 Use of the turnkey procurement for public construction works can improve the defects caused by traditional procurement methods, such as overly long design periods, complex working interfaces, and awards resulting in unreasonably low price bids and poor quality work, etc. Currently, most national entities that conduct turnkey procurement have a shortage of personnel with engineering and other required backgrounds. Under such circumstances, the entities do not have the capability to perform turnkey procurement in areas such as bid preparation, design and drawing review, supervising and inspecting the supplier’s performance, etc. Eventually, such a lack of qualified personnel within the procuring entity may lead to inefficiency and faulty construction. In our research, from the auditor’s standpoint, we found that there are five phases of turnkey procurement, including: pre-solicitation phase, which includes analysis of circumstances, tendering procedures and award principles; tender documentation preparation phase; tender phase; award phase; and performance management phase, as well as providing recommendations to all entities conducting turnkey procurement.
    Appears in Collections:[Executive Master of Civil Engineering] Electronic Thesis & Dissertation

    Files in This Item:

    File SizeFormat


    All items in NCUIR are protected by copyright, with all rights reserved.

    社群 sharing

    ::: Copyright National Central University. | 國立中央大學圖書館版權所有 | 收藏本站 | 設為首頁 | 最佳瀏覽畫面: 1024*768 | 建站日期:8-24-2009 :::
    DSpace Software Copyright © 2002-2004  MIT &  Hewlett-Packard  /   Enhanced by   NTU Library IR team Copyright ©   - 隱私權政策聲明