中大機構典藏-NCU Institutional Repository-提供博碩士論文、考古題、期刊論文、研究計畫等下載:Item 987654321/1507
English  |  正體中文  |  简体中文  |  Items with full text/Total items : 78818/78818 (100%)
Visitors : 34704337      Online Users : 1033
RC Version 7.0 © Powered By DSPACE, MIT. Enhanced by NTU Library IR team.
Scope Tips:
  • please add "double quotation mark" for query phrases to get precise results
  • please goto advance search for comprehansive author search
  • Adv. Search
    HomeLoginUploadHelpAboutAdminister Goto mobile version


    Please use this identifier to cite or link to this item: http://ir.lib.ncu.edu.tw/handle/987654321/1507


    Title: 預鑄專案成本估算策略之研究
    Authors: 楊坤霖;Gun-Shen Yang
    Contributors: 土木工程學系碩士在職專班
    Keywords: 估算策略;預鑄專案;專案管理;project management;cost estimate;strategy;precast project
    Date: 2006-07-06
    Issue Date: 2009-09-21 09:30:37 (UTC+8)
    Publisher: 國立中央大學圖書館
    Abstract: 預鑄產業身為營建自動化之先驅企業,營運任務上亦與一般傳統營建業類似,皆以專案管理為主體;但其經營管理活動方面,因為有工廠製造攤提之管銷,且為多專案並行,故更需憑藉良好之專案成本管理、進度管理、以及品質管理等,以確保與提昇工程專案執行之績效,其中尤以專案成本管理影響專案執行之營利結果最鉅。 一般專案成本管理及估算方法,所提供單純之成本控制或期間報表等作業活動,因產業差異,無法滿足預鑄專案成本管理與估算效益之需求與功能,而對企業盈虧預測之掌握及改善管理會造成影響。 本研究藉由文獻回顧描述專案成本管理之理論基礎,同時發現需要提高預鑄專案成本估算之效益;而估算策略之建立,在本研究中則以估算策略發展之程序來發展。藉此程序建立估算策略之結果,再經過實際蒐集180個估算案例之應用以進一步驗證其適用性。利用符合此策略之估算模式,可以有效達成有效供預鑄專案適用之目的。此外本研究建立之預鑄專案成本估算模式,在過程中結合了文獻理論及產業實務,由於善用架構及流程標準化,所以在成本估算本身對專案成本管理之貢獻,在功能性及策略性意義等方面,皆有可供相關研究者參考之處。 It is complicate that cost estimate toward precast projects integrates features from both manufacture and construction. This paper develops a strategy to solve conflicts and difficulty for estimating costs of precast projects. A theoretical strategy is built involving ten sub-modules to match related departments’ intentions, product features, customer desires, and manufacture processes. The data collection conducted in the study spends for months and consists of 180 precast projects. Appropriateness criteria of using the strategy to cases are developed before the evaluation. The contributions to both practice and research are to (1) standardize the processes of cost estimate, (2) integrate common software that is easy use and experience transferable as the tool to establish the modules, (3) construct a conceptual model benefiting cost estimate toward precast projects.
    Appears in Collections:[Executive Master of Civil Engineering] Electronic Thesis & Dissertation

    Files in This Item:

    File SizeFormat


    All items in NCUIR are protected by copyright, with all rights reserved.

    社群 sharing

    ::: Copyright National Central University. | 國立中央大學圖書館版權所有 | 收藏本站 | 設為首頁 | 最佳瀏覽畫面: 1024*768 | 建站日期:8-24-2009 :::
    DSpace Software Copyright © 2002-2004  MIT &  Hewlett-Packard  /   Enhanced by   NTU Library IR team Copyright ©   - 隱私權政策聲明