中大機構典藏-NCU Institutional Repository-提供博碩士論文、考古題、期刊論文、研究計畫等下載:Item 987654321/1514
English  |  正體中文  |  简体中文  |  全文筆數/總筆數 : 80990/80990 (100%)
造訪人次 : 41657766      線上人數 : 1611
RC Version 7.0 © Powered By DSPACE, MIT. Enhanced by NTU Library IR team.
搜尋範圍 查詢小技巧:
  • 您可在西文檢索詞彙前後加上"雙引號",以獲取較精準的檢索結果
  • 若欲以作者姓名搜尋,建議至進階搜尋限定作者欄位,可獲得較完整資料
  • 進階搜尋


    請使用永久網址來引用或連結此文件: http://ir.lib.ncu.edu.tw/handle/987654321/1514


    題名: 國軍新建工程施工階段運用PCM管理最合理作業模式之研究-以率真工程為例
    作者: 邴建辰;CHIEN-CHEN PENG
    貢獻者: 土木工程學系碩士在職專班
    關鍵詞: 專業營建管理;限制性理論;模糊德菲法;層級分析法;軍事工程;Analytic Hierarchy Process;Professional Construction Management;Fuzzy Delphi Method;Theory of Constraints;Military Engineering
    日期: 2007-12-22
    上傳時間: 2009-09-21 09:30:46 (UTC+8)
    出版者: 國立中央大學圖書館
    摘要: 專業營建管理(Professional Construction Management, PCM)目前已成為國外執行營建工程管理之主流,國內近年來亦積極推動專業營建管理制度,而國軍新建工程目前運用PCM管理之個案並不多見,尚屬於萌芽階段,又因國軍組織文化特殊且運用PCM之角色定位尚未確定,故相關個案運用PCM之績效均不顯著。本研究將採用限制性理論方法,就目前已採用PCM管理之國軍工程個案相關缺失,找出關鍵之限制性因素,再透過專家訪談及文獻探討方式彙整採用PCM管理之作業模式,接著再運用模糊德菲法及層級分析法建立專業營建管理服務績效評估模式,最後以此評估模式分別採用SAW及TOPSIS計算方式,評選出國軍新建工程施工階段運用PCM管理之最合理作業模式,以提供國軍後續委託專案管理工程之參考。 Professional Construction Management(PCM) from abroad have already become the mainstream of carried out which builds engineering management at present. In our country, we also activelying promoting the Professional Construction Management system domestically in recent years. Our country's army's newly-built project uses the system of PCM management at present actually rare, it is still embryonic stage, because country's army organizes culture to be special and not confirms yet that adopt the role of PCM , so relevant cases use the performance of PCM not to be apparent. This research will adopt the Theory of Constraints(TOC)method about the relevant imperfection of army's project case which has already adopted PCM system at present, finding out the key restricted factor. Then we collect the operation approach of adopt PCM management at present by the interviewing expert method and investigating literature method, and we use investigating literature, expert's interview, the Fuzzy Delphi Method and the Analytic Hierarchy Process method to set up the model of evaluating PCM service performance. Finally , we use the model that appling SAW and TOPSIS to find the rightest operation approach of Military newly-built engineering at project construction stage using PCM to manage. And we can offer an opinion to follow-up country's army's newly-built project uses the system of PCM.
    顯示於類別:[土木工程學系碩士在職專班] 博碩士論文

    文件中的檔案:

    檔案 大小格式瀏覽次數


    在NCUIR中所有的資料項目都受到原著作權保護.

    社群 sharing

    ::: Copyright National Central University. | 國立中央大學圖書館版權所有 | 收藏本站 | 設為首頁 | 最佳瀏覽畫面: 1024*768 | 建站日期:8-24-2009 :::
    DSpace Software Copyright © 2002-2004  MIT &  Hewlett-Packard  /   Enhanced by   NTU Library IR team Copyright ©   - 隱私權政策聲明