中大機構典藏-NCU Institutional Repository-提供博碩士論文、考古題、期刊論文、研究計畫等下載:Item 987654321/26285
English  |  正體中文  |  简体中文  |  全文笔数/总笔数 : 80990/80990 (100%)
造访人次 : 41662951      在线人数 : 1950
RC Version 7.0 © Powered By DSPACE, MIT. Enhanced by NTU Library IR team.
搜寻范围 查询小技巧:
  • 您可在西文检索词汇前后加上"双引号",以获取较精准的检索结果
  • 若欲以作者姓名搜寻,建议至进阶搜寻限定作者字段,可获得较完整数据
  • 进阶搜寻


    jsp.display-item.identifier=請使用永久網址來引用或連結此文件: http://ir.lib.ncu.edu.tw/handle/987654321/26285


    题名: Short-term work team scheduling models for effective road repair and management
    作者: Tang,CH;Yan,SY;Chang,CW
    贡献者: 土木工程研究所
    关键词: ROBUST OPTIMIZATION;STOCHASTIC DEMANDS;UNCERTAINTY;NETWORKS;LOCATION
    日期: 2009
    上传时间: 2010-06-29 17:09:57 (UTC+8)
    出版者: 中央大學
    摘要: In this study, we focus on the development of work team routing/scheduling models incorporating stochastic travel and repair times. Robust and expected optimization concepts, combined with a time-space network technique, are used to develop the models. We perform numerical tests based on operational data for Taoyuan County in Taiwan. The test results show the good performance of the models.
    關聯: TRANSPORTATION PLANNING AND TECHNOLOGY
    显示于类别:[土木工程研究所] 期刊論文

    文件中的档案:

    档案 描述 大小格式浏览次数
    index.html0KbHTML459检视/开启


    在NCUIR中所有的数据项都受到原著作权保护.

    社群 sharing

    ::: Copyright National Central University. | 國立中央大學圖書館版權所有 | 收藏本站 | 設為首頁 | 最佳瀏覽畫面: 1024*768 | 建站日期:8-24-2009 :::
    DSpace Software Copyright © 2002-2004  MIT &  Hewlett-Packard  /   Enhanced by   NTU Library IR team Copyright ©   - 隱私權政策聲明