中大機構典藏-NCU Institutional Repository-提供博碩士論文、考古題、期刊論文、研究計畫等下載:Item 987654321/3177
English  |  正體中文  |  简体中文  |  全文笔数/总笔数 : 78728/78728 (100%)
造访人次 : 33351802      在线人数 : 438
RC Version 7.0 © Powered By DSPACE, MIT. Enhanced by NTU Library IR team.
搜寻范围 查询小技巧:
  • 您可在西文检索词汇前后加上"双引号",以获取较精准的检索结果
  • 若欲以作者姓名搜寻,建议至进阶搜寻限定作者字段,可获得较完整数据
  • 进阶搜寻


    jsp.display-item.identifier=請使用永久網址來引用或連結此文件: http://ir.lib.ncu.edu.tw/handle/987654321/3177


    题名: 工程機關辦理大型工程設計審查要項及機制研究;The Study of Major Projects Design Review Terms and Echanism by Engineering Agencies
    作者: 楊政賢;Cheng-Hsien Yang
    贡献者: 營建管理研究所碩士在職專班
    关键词: 設計審查要項;大型工程;design review terms;Major Projects
    日期: 2009-07-07
    上传时间: 2009-09-21 12:07:52 (UTC+8)
    出版者: 國立中央大學圖書館
    摘要: 設計成果之良窳,關係著採購工程之施工品質及施工期間爭議之產生,故機關對技術服務廠商設計成果審查之重要性等同於對廠商施工期間之工程監造 。 有鑒於工程機關一般設計審查人員不足,再者,一件重大工程建設之設計成果之圖說常達數百張,加上相關規範、標準、契約條款等相當繁多,故各工程機關如何運用有限之人力做重點查核之設計審查,讓機關辦理設計審查時選擇查核重點之判斷更有依據,實值建構大型工程之設計審查要項及設計審查機制,以使設計成果審查作業能事半功倍,進而提昇公共工程設計品質。 本研究經由公共工程委員會頒訂之公共工程規劃設計成果審查作業建議事項表、金質獎設計品質評審標準、各機關辦理公有建築物規劃設計成果審核重點,據以歸納整理初步之設計審查要項架構,經由第一階段專家問卷確立審查要項,進而以層級分析法建立AHP專加問卷調查,進行成對比較,計算出設計成果審查審查要項及權重,俾供各機關辦理設計審查時查核重點決策參考,並由國內各重大工程主辦機關現行設計審查制度,以及國外設計審查文獻之探討,進行後續設計審查機制之建構。 本研究所建立之工程主辦機關設計審查機制,包含設計審查時之內容、時機、時程及審查要項,可提供工程主辦機關未來辦理設計審查之參考,期能健全國內設計審查制度,以提昇公共工程設計品質。 The quality of design has major impact on procurement works related to construction quality and disputes arising during the construction period.It is relatively important for Government agencies to review outcome of design and supervision of works from technical service companies during the construction period. The design and review manpower is limited at general project agencies, In addition, a major outcome of the construction design plans which got hundreds of ordinary and relevant norms, standards, a considerable range, such as lease conditions. The use of insufficient organs manpower at design review agencies to do the design review is crucial, so that the design review authority for the selection of judge is more based on real large-scale projects to build the design review and design review to be a mechanism to enable the review operations of design outcome can be more effective to enhance the public works design quality. In this study, awarded by the Public Construction Commission of Public Works provides the review results of operations planning and design suggestions tables, gold design quality evaluation criteria, the authority to do operation planning and design of public buildings is the focus and outcome of audit, it was to collate and analyze preliminary design review of the structure through the first phase of the expert review to establish questionnaire, and analysis to establish the level of increased expertise AHP survey, conducted paired comparison, the calculated design results of check point and importance of review , so for the design review authority to check the focus of decision-making by national authorities to host the major projects designed to review the existing system and design review of the literature of foreign countries to explore mechanisms for follow-up review of construction design. The Institute sponsored the establishment of institutions of engineering design review mechanism, including design review of the content, timing, duration and review to be available to host the project design review authority for future reference, a view to improve the internal design review system to enhance quality of public engineering design.
    显示于类别:[營建管理研究所碩士在職專班] 博碩士論文

    文件中的档案:

    档案 大小格式浏览次数


    在NCUIR中所有的数据项都受到原著作权保护.

    社群 sharing

    ::: Copyright National Central University. | 國立中央大學圖書館版權所有 | 收藏本站 | 設為首頁 | 最佳瀏覽畫面: 1024*768 | 建站日期:8-24-2009 :::
    DSpace Software Copyright © 2002-2004  MIT &  Hewlett-Packard  /   Enhanced by   NTU Library IR team Copyright ©   - 隱私權政策聲明