中大機構典藏-NCU Institutional Repository-提供博碩士論文、考古題、期刊論文、研究計畫等下載:Item 987654321/49400
English  |  正體中文  |  简体中文  |  全文筆數/總筆數 : 80990/80990 (100%)
造訪人次 : 41684867      線上人數 : 2639
RC Version 7.0 © Powered By DSPACE, MIT. Enhanced by NTU Library IR team.
搜尋範圍 查詢小技巧:
  • 您可在西文檢索詞彙前後加上"雙引號",以獲取較精準的檢索結果
  • 若欲以作者姓名搜尋,建議至進階搜尋限定作者欄位,可獲得較完整資料
  • 進階搜尋


    請使用永久網址來引用或連結此文件: http://ir.lib.ncu.edu.tw/handle/987654321/49400


    題名: 極端氣候下可能產生之坡地崩塌潛勢評估與預警全天候高效能遙測資源平台構建-總計畫暨子計畫:遙測於崩塌成災機率及災害程度範圍估計之數據分析(I);Remote Sensing Analysis for Landslide Probability and Damage Estimation
    作者: 任玄
    貢獻者: 太空及遙測研究中心
    關鍵詞: Landslide;Shadow Removal;Relative Calibration;Remote Sensing Data;Evaluation and EarlyWarning System;研究領域:環保工程
    日期: 2011-08-01
    上傳時間: 2012-01-17 18:49:58 (UTC+8)
    出版者: 行政院國家科學委員會
    摘要: 臺灣的地震活動頻繁、造山速度快、地形陡峭、地質岩體破碎及颱風豪雨的亞熱帶氣候,都是造成坡地崩塌的重要原因。極端快速且大量的降雨將造成平地低窪地區大規模的淹水,大量的降水也會造成山區土壤含水量快速飽合而發生山崩、甚至引發毀滅性的地滑及土石流。本計畫是在總計畫建構坡地崩塌潛勢評估與預警高效能全天候遙測資源共享平台下的子計畫之一,主要是利用衛星及地面遙測資料對崩塌成災機率及災害範圍程度估計之數據分析,配合其他計畫的地質、地形及土壤含水等資訊,建立評估與預警通報系統,並支撐學術研究與防災減災決策支援。本計畫分三年執行,第一年以高屏地區為主,利用衛星影像偵測坡地崩塌,並以陰影消除及相對大氣校正技術降低誤判的機率;第二年針對地面固定攝影影片,利用崩塌時影像特性,即時判斷土石流的發生,以利預警;最後第三年我們將配合高速運算系統,結合各計畫成果建構潛勢評估與預警平台 In Taiwan, landslides occur very often because the rapid seismic activities, mountain building fast, steep terrain, geological rock crushing and the subtropical climate with typhoons and heavy rains. Especially the highly saturated soil moisture after heavy rains causes destructive landslides and debris flows. This proposal is one of the four subproposals to construct a system to analyze the potential of the landslide and high-performance all-weather assessment and early-warning with remote sensing data sharing platform. It combines information of geology, topography and soil moisture content to establish the system for academic research and disaster management supports. This is a three-year project. In the first year, the Kaohsiung-Pingtung area is selected to be the test site and classify the landslide areas from satellite images. The shadow removal and relative calibration are also discussed to reduce the false alarm rate. In the second year, fixed camera is set in the potential landslide area for monitoring and design real-time process for landslide detection. Finally, in the third year, we will work with high-speed computing systems to establish the evaluation and early-warning system. 研究期間:10008 ~ 10107
    關聯: 財團法人國家實驗研究院科技政策研究與資訊中心
    顯示於類別:[太空及遙測研究中心] 研究計畫

    文件中的檔案:

    檔案 描述 大小格式瀏覽次數
    index.html0KbHTML465檢視/開啟


    在NCUIR中所有的資料項目都受到原著作權保護.

    社群 sharing

    ::: Copyright National Central University. | 國立中央大學圖書館版權所有 | 收藏本站 | 設為首頁 | 最佳瀏覽畫面: 1024*768 | 建站日期:8-24-2009 :::
    DSpace Software Copyright © 2002-2004  MIT &  Hewlett-Packard  /   Enhanced by   NTU Library IR team Copyright ©   - 隱私權政策聲明