English  |  正體中文  |  简体中文  |  全文筆數/總筆數 : 80990/80990 (100%)
造訪人次 : 42768653      線上人數 : 1115
RC Version 7.0 © Powered By DSPACE, MIT. Enhanced by NTU Library IR team.
搜尋範圍 查詢小技巧:
  • 您可在西文檢索詞彙前後加上"雙引號",以獲取較精準的檢索結果
  • 若欲以作者姓名搜尋,建議至進階搜尋限定作者欄位,可獲得較完整資料
  • 進階搜尋


    請使用永久網址來引用或連結此文件: http://ir.lib.ncu.edu.tw/handle/987654321/49826


    題名: Optimal schedule adjustments for supplying ready mixed concrete following incidents
    作者: Yan,SY;Lin,HC;Liu,YC
    貢獻者: 土木工程學系
    關鍵詞: DISPATCHING RMC TRUCKS;GENETIC ALGORITHMS;MODEL;SIMULATION;DELIVERY;CYCLONE;CHAIN
    日期: 2011
    上傳時間: 2012-03-27 16:17:53 (UTC+8)
    出版者: 國立中央大學
    摘要: In this study, the authors develop a systematic network flow model designed to help RMC carriers effectively adjust schedules following RMC mixer breakdowns. A time-space network technique is employed to formulate the production of the RMC and truck fleet flows in the dimensions of time and space. A solution algorithm, incorporating a problem decomposition technique and the use of a mathematical programming solver, is developed to efficiently solve the problem. Finally, the model and solution method are evaluated by performing a case study. The test results show that, with the application of the model and the solution algorithm, mixer breakdowns do not lead to much deterioration in the system operating performance. In addition, the system operating cost is significantly improved (by 10.75%) compared to that obtained using the manual approach. As a result, the model and the solution algorithm could be useful for actual operations. (C) 2011 Elsevier B.V. All rights reserved.
    關聯: AUTOMATION IN CONSTRUCTION
    顯示於類別:[土木工程學系 ] 期刊論文

    文件中的檔案:

    檔案 描述 大小格式瀏覽次數
    index.html0KbHTML687檢視/開啟


    在NCUIR中所有的資料項目都受到原著作權保護.

    社群 sharing

    ::: Copyright National Central University. | 國立中央大學圖書館版權所有 | 收藏本站 | 設為首頁 | 最佳瀏覽畫面: 1024*768 | 建站日期:8-24-2009 :::
    DSpace Software Copyright © 2002-2004  MIT &  Hewlett-Packard  /   Enhanced by   NTU Library IR team Copyright ©   - 隱私權政策聲明