中大機構典藏-NCU Institutional Repository-提供博碩士論文、考古題、期刊論文、研究計畫等下載:Item 987654321/50073
English  |  正體中文  |  简体中文  |  Items with full text/Total items : 78818/78818 (100%)
Visitors : 34728104      Online Users : 1741
RC Version 7.0 © Powered By DSPACE, MIT. Enhanced by NTU Library IR team.
Scope Tips:
  • please add "double quotation mark" for query phrases to get precise results
  • please goto advance search for comprehansive author search
  • Adv. Search
    HomeLoginUploadHelpAboutAdminister Goto mobile version


    Please use this identifier to cite or link to this item: http://ir.lib.ncu.edu.tw/handle/987654321/50073


    Title: Application of a SOM-Based Optimization Algorithm in Minimizing Construction Time for Secant Pile Wall
    Authors: Chen,JH;Su,MC;Huang,DY
    Contributors: 營建管理研究所
    Keywords: PARTICLE SWARM OPTIMIZATION;TRAVELING SALESMAN PROBLEM
    Date: 2010
    Issue Date: 2012-03-27 17:02:52 (UTC+8)
    Publisher: 國立中央大學
    Abstract: Construction time matters for activities where rental equipment must be used. The building of a secant pile wall requires the rental of equipment and finding the optimal sequence to minimize the construction time is one way to lower construction costs. In this study we develop an effective and efficient optimization algorithm, which we call self-organizing feature map (SOM)-based optimization (SOMO), to minimize the construction time. The algorithm is applied to a case study to obtain the optimal sequences for both primary and secondary bored piles for a secant pile wall. The new SOMO algorithm is developed based on the ability of the human brain to produce topologically ordered mapping, so as to exploit better solutions via updating the weighting vectors of the neurons in a self-organizing topological way that occurs in the evolution of the feature map for optimization. Given detailed building time of the 16 activities of each bored pile, we find that 143.92 h or 27.21% of the original construction can be saved. The optimal sequences for both primary and secondary bored piles are also determined. The practicability of the SOMO algorithm is substantiated.
    Relation: JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT-ASCE
    Appears in Collections:[Graduate Institute of construction engineering] journal & Dissertation

    Files in This Item:

    File Description SizeFormat
    index.html0KbHTML720View/Open


    All items in NCUIR are protected by copyright, with all rights reserved.

    社群 sharing

    ::: Copyright National Central University. | 國立中央大學圖書館版權所有 | 收藏本站 | 設為首頁 | 最佳瀏覽畫面: 1024*768 | 建站日期:8-24-2009 :::
    DSpace Software Copyright © 2002-2004  MIT &  Hewlett-Packard  /   Enhanced by   NTU Library IR team Copyright ©   - 隱私權政策聲明