English  |  正體中文  |  简体中文  |  全文筆數/總筆數 : 80990/80990 (100%)
造訪人次 : 42119740      線上人數 : 1513
RC Version 7.0 © Powered By DSPACE, MIT. Enhanced by NTU Library IR team.
搜尋範圍 查詢小技巧:
  • 您可在西文檢索詞彙前後加上"雙引號",以獲取較精準的檢索結果
  • 若欲以作者姓名搜尋,建議至進階搜尋限定作者欄位,可獲得較完整資料
  • 進階搜尋


    請使用永久網址來引用或連結此文件: http://ir.lib.ncu.edu.tw/handle/987654321/539


    題名: 精簡營建於預拌混凝土供應鏈應用之研究
    作者: 江靜芳;Jing-Fan Chuang
    貢獻者: 土木工程研究所
    關鍵詞: 精簡營建;預拌混凝土供應鏈;電腦模擬;CYCLONE;lean construction;ready-mixed concrete supply chain;computer simulation;CYCLONE
    日期: 2000-06-25
    上傳時間: 2009-09-18 17:07:20 (UTC+8)
    出版者: 國立中央大學圖書館
    摘要: 營建業及製造業生產力提升之契機皆在於去除流程中浪費、無附加價值之作業,進而提升整個生產系統之效率產能,因此製造業成功之生產管理觀念值得營建業效法以提升營建作業之效能。精簡生產(Lean Production)方式使豐田汽車工業之績效大幅提升,於1990年代成為製造業生產系統之主軸,因而於1993年營建業之專家學者成立國際精簡營建組織,並於1997年成立精簡營建協會,期能藉由應用製造業成功之管理經驗,創新營建生產管理之概念,提升營建工程之績效表現。 本研究應用精簡營建之概念於預拌混凝土供應鏈,針對預拌混凝土供應商與混凝土施工承包商間之資訊流及物料流之傳遞、材料供應流程之資源配置與工地施作流程對施作時間及材料品質之影響進行探討,經由精簡營建相關文獻之探討、工地訪查與專家訪談,確立影響預拌混凝土供應鏈效能之因子,並建立預拌混凝土供應鏈流程精簡之評估模型。案例研究部份,收集材料供應、施工等相關資料,應用電腦模擬評估並驗證精簡營建於預拌混凝土供應鏈之成效,期能將研究之成果提供材料供應商及施工承包商資源運用規劃之使用,以提升預拌廠資源運用之有效性並提升混凝土施工之效率及品質。 本研究之結論包括:(1)針對預拌混凝土供應鏈建立三種流程精簡評估模型,分別為PUSH-TRADITIONAL模型、PULL-TRADITIONAL模型、PULL-IMPROVED模型,模型之價值在於反應現況並預先規劃,本研究所建立之模型即以此為準則,於模型設計時考量使用之需求性,以使模型之功能完備;(2)於案例研究部份,應用電腦模擬肯定精簡營建於預拌混凝土供應鏈應用之成效,並探討預拌混凝土供應鏈影響因子對整體效能之影響; (3)應用電腦模擬進行精簡營建之研究,將精簡營建之概念模型化並以模擬之結果針對預拌混凝土供應鏈影響因子進行探討。 With the application of many innovative production management methods such as Total Quality Management, Just-in-time management, Vertical Integration, Lean Production, Supply-chain management, and so on, manufacturing industry has enjoyed a great success in the improvement of production efficiency in the past decades. One common ingredient among those methods is to streamline their production operation to pursuit perfection to their products. On the other hand, interest by the construction industry in the study of processes at this level has been negligible. In fact, interest in methods such as CPM has placed a great deal of planning emphasis at the project level. Process level considerations have been neglected or assumed to be covered by the "experience" of field personnel. According to several research studies, more than 30% of construction cost as well as time can be potentially saved through better planning and scheduling. "Lean construction" addresses just the issue and implies the optimization of storage and logistics. Its goal is to avoid waste of time, money, equipment, etc. and to focus on productivity improvement and cost reduction. This research employs the principles of lean construction to study the ready-mixed concrete production and placement process operation in construction. The objectives are to improve the overall operating efficiency and to reduce waste by streamlining the operating chain process. Construction job sites and their concrete supply plants will be visited to pinpoint the bottleneck of the operating process. Wastes and inefficiency will be identified. Alternative operating modes will then be evaluated using the computer simulation technique to streamline the concrete supply and placement operation in construction.
    顯示於類別:[土木工程研究所] 博碩士論文

    文件中的檔案:

    檔案 大小格式瀏覽次數


    在NCUIR中所有的資料項目都受到原著作權保護.

    社群 sharing

    ::: Copyright National Central University. | 國立中央大學圖書館版權所有 | 收藏本站 | 設為首頁 | 最佳瀏覽畫面: 1024*768 | 建站日期:8-24-2009 :::
    DSpace Software Copyright © 2002-2004  MIT &  Hewlett-Packard  /   Enhanced by   NTU Library IR team Copyright ©   - 隱私權政策聲明