中大機構典藏-NCU Institutional Repository-提供博碩士論文、考古題、期刊論文、研究計畫等下載:Item 987654321/59275
English  |  正體中文  |  简体中文  |  全文筆數/總筆數 : 80990/80990 (100%)
造訪人次 : 41683549      線上人數 : 2600
RC Version 7.0 © Powered By DSPACE, MIT. Enhanced by NTU Library IR team.
搜尋範圍 查詢小技巧:
  • 您可在西文檢索詞彙前後加上"雙引號",以獲取較精準的檢索結果
  • 若欲以作者姓名搜尋,建議至進階搜尋限定作者欄位,可獲得較完整資料
  • 進階搜尋


    請使用永久網址來引用或連結此文件: http://ir.lib.ncu.edu.tw/handle/987654321/59275


    題名: 以供應鏈管理提升統包工程專案採購績效之研究
    作者: 劉子豪;Liu-,Tzu-Hao
    貢獻者: 營建管理研究所在職專班
    關鍵詞: 供應鏈;統包;EPC;PDCA;supply chain management
    日期: 2013-01-24
    上傳時間: 2013-03-25 16:23:01 (UTC+8)
    出版者: 國立中央大學
    摘要:  統包工程(Engineering, Procurement and Construction,EPC)已是國際性工程之工程承攬方式的主流,相較以往由於競爭模式的轉變,所以統包工程承攬廠商所需要的,是更全球化、更專業、更嚴苛的競爭力。由於統包工程龐大,所以統包總包商與次包商和供應商之間的供應鏈管理,相形重要。供應鏈的本質是從競爭轉移到合作,並強調相互依存的程度,所以統包廠商間需要實施供應鏈管理,以提高競爭優勢和應對市場動態。截至2011年,國內有關採購發包作業的研究文獻,乃以一般營造業工程為主要探討對象,鮮少針對EPC工程,探討如何透過供應鏈管理的改進,以提升採購部發包作業之績效。根據學者Cooper和Ellram研究,傳統營造業的管理方式,著重於產品的改變,每個生產階段被獨立的控制著,而統包工程之供應鏈管理則是對於整個生產過程的流程管理,再以國內中油的EPC石化工程為例,通常超過60%以上的資源必須透過工程採購發包作業取得,而採購作業的績效,直接影響工程的進度、利潤和品質,所以採購發包作業的執行過程,對於專案績效確實是具有決定性的影響。本研究以文獻回顧及實際案例,試圖從公司實際執行運作的需求及角度來觀看,深入的探討如何透過供應鏈管理的改進,以提升工程採購作業之績效。 Since the turnkey projects are usually huge, the supply chain management between the general contractor and sub-contractors and suppliers is very important. The essence of the supply chain is transferred from competition to cooperation and enhances the degree of interdependence. Therefore general contractors shall implement the supply chain management to improve their competitive capability and react properly to the market conditions.So far, the domestic research literatures about sub-contracting operations focus mainly on the general construction works. It is rare to discuss how the procurement performance of EPC projects can be elevated through effective supply chain management.According to the research by Cooper and Ellram, the conventional construction management emphasizes on the product changes and each stage of production is controlled independently. Instead, the supply chain management of turnkey projects emphasizes on the process management of the entire production flow. Taking the example of CPC’s petrochemical construction projects, more than 60% of the resources are acquired through procurement, and the performance of the procurement activities leads to direct impact on the progress, quality and profits of the projects. Thus effective control over procurement execution is absolutely crucial to the overall performance of projects.In this study, by review of the literature and real cases of practice, endeavor has been made to explore how the procurement performance can be elevated through improvement of the supply chain management from the point of view of corporate operations.
    顯示於類別:[營建管理研究所碩士在職專班] 博碩士論文

    文件中的檔案:

    檔案 描述 大小格式瀏覽次數
    index.html0KbHTML1083檢視/開啟


    在NCUIR中所有的資料項目都受到原著作權保護.

    社群 sharing

    ::: Copyright National Central University. | 國立中央大學圖書館版權所有 | 收藏本站 | 設為首頁 | 最佳瀏覽畫面: 1024*768 | 建站日期:8-24-2009 :::
    DSpace Software Copyright © 2002-2004  MIT &  Hewlett-Packard  /   Enhanced by   NTU Library IR team Copyright ©   - 隱私權政策聲明