中大機構典藏-NCU Institutional Repository-提供博碩士論文、考古題、期刊論文、研究計畫等下載:Item 987654321/60372
English  |  正體中文  |  简体中文  |  全文笔数/总笔数 : 80990/80990 (100%)
造访人次 : 41649479      在线人数 : 1374
RC Version 7.0 © Powered By DSPACE, MIT. Enhanced by NTU Library IR team.
搜寻范围 查询小技巧:
  • 您可在西文检索词汇前后加上"双引号",以获取较精准的检索结果
  • 若欲以作者姓名搜寻,建议至进阶搜寻限定作者字段,可获得较完整数据
  • 进阶搜寻


    jsp.display-item.identifier=請使用永久網址來引用或連結此文件: http://ir.lib.ncu.edu.tw/handle/987654321/60372


    题名: BIM應用在構築智慧型公共建築物規劃階段之整合架構流程研析-以桃園國際機場航廈規劃為例
    作者: 鄭緯仁;Cheng-wei-jen
    贡献者: 土木工程學系在職專班
    关键词: 專案關係者;建築資訊塑模;專案交付方法;建築/工程/結構;stakeholder;BIM;IDP;AEC
    日期: 2013-07-30
    上传时间: 2013-08-22 11:35:31 (UTC+8)
    出版者: 國立中央大學
    摘要: 國際機場航廈規劃時,須考慮之內容涵蓋建築、景觀、機電、航務、商務、安全系統…等多重面向,以國家門面而言,其實最需要且適合推廣智慧型建築模式。且於相關專業間互相保留著複雜而緊密之專業範疇,除委託國內外專業機場設計專家做專業規劃外,更需考量其他如文化、商業營運等等非工程專業之重要關係要素;故在初始規劃階段之討論中,如何有效整合及塑造適切而概略性之規劃模型,以供專案關係者(stakeholder)參與,如本研究案例,國際機場航廈大規模跨領域之協同規劃中,係屬重要課題。
    本研究係針對的是大型公共建築物及其設施智慧化,在其規劃階段,如何有效率的彙整各相關資訊系統,以提供BIM技術在設計等後續階段,可發揮其最大效能。在後續章節將提出一種專案交付方法(IDP)概念,充分整合所有專案參與者,使參與者盡其所能發揮自己的智慧和經驗,在設計、製造和施工等所有階段,優化各項成效,為業主增加價值,減少浪費,並大幅提高執行效率;本研究爰擇其最典型案例(集大型規模、設施複雜化以及講求智慧化以滿足服務品質等於一身)之桃園機場航廈為規畫案例,配合實際業者及相關專案關係人之訪談,廣泛收集使用者需求,嘗試做一個實體案例之整合架構流程。
    About the planning of the International airport boat tall building, the content that must consider contains the building, view, electromechanics, navigational matters, commercial affair, security system ,etc. face again more,by International airport, shop front but speeches national, need and suitable for popularizing most by building ways intelligent in fact. And is keeping the complicated and close professional category among the relevant specialities each other, besides trusting the domestic and foreign professional airport designing expert to make professional planning, need to consider even more to be other such as not a specialized important relation key element of a project that the culture, commerce operate waiting a moment
    So in discussion during the course of planning initially, how to combine and mould appropriately effectively and outline person who fors special project relation of planning model (stakeholder) Participate in, such as the case of this research, ones that stepped the field on a large scale in the boat tall building of International airport are in planning, it is the important subject.
    It was large-scale public building and facility intelligence that department directed this research against, what a stage in its planning, the efficient one gathers together every whole relevant information system, in order to subsequent stage of offering BIM technology to design etc., can give play to its greatest efficiency. Integrated project delivery (IDP) in a special project in the subsequent chapter The concept, fully combine all special project participants, make participants try its best to give play to one's own intelligence and experience, designing, making and constructing and waiting for all stages, optimize every effect, add value for the owner, reduce the waste, and raise and carry out efficiency by a wide margin
    This research then selects its most typical case (collect large-scale scale, facility and complicate and stress intelligence in order to meets service quality and equals one suit) Taoyuan International Airport Termianl building last case to rule, be lasted family property and special project relation the interviews of peoples relevants actual, collect the intersection of user and demand extensively, try to run the structural procedure of integration of the case of an entity.
    显示于类别:[Executive Master of Civil Engineering] Electronic Thesis & Dissertation

    文件中的档案:

    档案 描述 大小格式浏览次数
    index.html0KbHTML1706检视/开启


    在NCUIR中所有的数据项都受到原著作权保护.

    社群 sharing

    ::: Copyright National Central University. | 國立中央大學圖書館版權所有 | 收藏本站 | 設為首頁 | 最佳瀏覽畫面: 1024*768 | 建站日期:8-24-2009 :::
    DSpace Software Copyright © 2002-2004  MIT &  Hewlett-Packard  /   Enhanced by   NTU Library IR team Copyright ©   - 隱私權政策聲明