English  |  正體中文  |  简体中文  |  全文筆數/總筆數 : 80990/80990 (100%)
造訪人次 : 41632835      線上人數 : 3794
RC Version 7.0 © Powered By DSPACE, MIT. Enhanced by NTU Library IR team.
搜尋範圍 查詢小技巧:
  • 您可在西文檢索詞彙前後加上"雙引號",以獲取較精準的檢索結果
  • 若欲以作者姓名搜尋,建議至進階搜尋限定作者欄位,可獲得較完整資料
  • 進階搜尋


    請使用永久網址來引用或連結此文件: http://ir.lib.ncu.edu.tw/handle/987654321/676


    題名: 公共工程監造成本控制最佳化研究
    作者: 何正吉;Zhin-Jin He
    貢獻者: 土木工程研究所
    關鍵詞: 程效益;力資源;公共工程;0-1整數規劃;監造總成本;human resource;public project;0-1 intger programming;scheduling efficiency
    日期: 2002-01-21
    上傳時間: 2009-09-18 17:10:05 (UTC+8)
    出版者: 國立中央大學圖書館
    摘要: 近年來國內為促進經濟成長加強各項基礎建設,尤其交通建設列為首要,故大型公共工程在過去幾年蓬勃發展,各項施工技術、管理知識皆有長足進步,對工程監造方面亦大力推動各項品質管理有關訓練,使公共工程品質大為提昇。唯過去大部份著眼於技術層面發展,少有成本效益方面考量,最近政府財政短缺各項經費皆須做最有效安排,故在工程監造工作中,過去較少探討之人員使用成本效益及工作效益問題變的重要。蓋充分且有效的使用人力,除可符合成本經濟原則外,並有助於工程管理品質之提昇,同時可使政府預算使用分配具最佳之效果。以往,營建工程界對監造人力使用需求規劃皆採用經驗法則作為人力資源之安排,唯此方式無法產生良好成本控制效益。 緣此,本文針對工程監造不同人力資源(政府工程部門內部人力與外聘專業機構人力)之需求、供給及工作作業之關係條件等問題,構建數學規劃模式與求解方法,並以求得單一專案工程監造工作總成本最小化為目標,所得成果可供實務界在工作排程與人力資源規劃及成本控制等之專案管理工作式正確性,並進行敏感度分析,最後對研究結果及心得提出結論及建議。 In the recent years, Taiwan has been enforcing its infrastructure to speed economic growth. Transportation has been emphasized, with large scale public projects on —going. Construction and management have all improved, due to the government enforcing training of quality control. As a result, construction quality has greatly risen. In the past, much attention was given to the technology, therefore cost efficiency was rarely considered and lowly prioritized. Recently the government budget has shrunk, forcing costs to be spent most efficiently. Now human resources are optimized, giving much improved cost efficiency. In the past, human resources had been allocated by sheer experience, leading to poor cost control. This essay provides a different technique for labor allocation (between government and external/private organizations), using mathematical formulas and computerized calculations. Mathematical models are constructed and solutions are found given constrains such as costs minimization. This should enhance the management of human resources, tasks, and cost control. This research uses 0-1 integer programme for the mathematical model to attain a solution that is optimized, given the constraints that are inputted by the user. This research uses a mathematical programming software —lingo ,to solve the problem. Finally, a case study is performed using the actual data of a large public project in Taiwan.
    顯示於類別:[土木工程研究所] 博碩士論文

    文件中的檔案:

    檔案 大小格式瀏覽次數


    在NCUIR中所有的資料項目都受到原著作權保護.

    社群 sharing

    ::: Copyright National Central University. | 國立中央大學圖書館版權所有 | 收藏本站 | 設為首頁 | 最佳瀏覽畫面: 1024*768 | 建站日期:8-24-2009 :::
    DSpace Software Copyright © 2002-2004  MIT &  Hewlett-Packard  /   Enhanced by   NTU Library IR team Copyright ©   - 隱私權政策聲明