中大機構典藏-NCU Institutional Repository-提供博碩士論文、考古題、期刊論文、研究計畫等下載:Item 987654321/67927
English  |  正體中文  |  简体中文  |  Items with full text/Total items : 78818/78818 (100%)
Visitors : 34656977      Online Users : 1780
RC Version 7.0 © Powered By DSPACE, MIT. Enhanced by NTU Library IR team.
Scope Tips:
  • please add "double quotation mark" for query phrases to get precise results
  • please goto advance search for comprehansive author search
  • Adv. Search
    HomeLoginUploadHelpAboutAdminister Goto mobile version


    Please use this identifier to cite or link to this item: http://ir.lib.ncu.edu.tw/handle/987654321/67927


    Title: 鋼橋塗裝人機作業成本最佳化決策模式之研究;A Study on the Optimal Decision for Man-Machine Cooperation Costs of Coating of Steel Bridge
    Authors: 余思翰;YU,Szu-han
    Contributors: 土木工程學系在職專班
    Keywords: 鋼橋塗裝;人機作業;機具派遣;最佳化;整數規劃;coating of steel bridge;man-machine cooperation;man and machine dispatching;optimization;integer programming
    Date: 2015-07-06
    Issue Date: 2015-09-23 10:03:55 (UTC+8)
    Publisher: 國立中央大學
    Abstract: 鋼結構橋梁塗裝工程之人機派遣方式,往往是以過往施工經驗平均分配原則下安排,而無法合宜安排並導致不必要施工成本支出。本研究係依五跨連續鋼橋工程案件中,以鋼橋塗裝協力廠商之機具派遣為研究範圍,利用線性整數規劃最佳化模式,為求出人力安排及機具進場指派時機,提供分包廠商調度運籌之參考,以達最少成本為目標;依各參數之敏感度變化趨勢進行敏感度分析,藉此求得工作廠房需要之人力、機具之最少值,達成人力機具充分運用之目的。並以最佳化模式所求得之派遣結果與一般人工經驗派遣進行比較,以驗證本研究最佳化模式產生的派遣結果,相對比較人工經驗安排較具效率且控制成本。故本研究可適宜使用於鋼橋塗裝與機具派遣檢討等規劃問題,並可協助分包廠商規劃。;The man and machine dispatching for the coating project of steel bridges are often under the principle of equal distribution based on the previous experience, which may be inappropriate and cause unnecessary cost expenditure. This paper explores the dispatch of machines and tools by the third-party in the coating project for a five-span continuous rigid frame bridge. By using linear integer programming to reckon the best timing for arranging man power and machines to station in the site, it expects to offer references for decision-makers in planning and management, so as to realize the minimum costs. With the sensitivity analysis based on the changing trend of sensitivity of each parameter, it computes the minimum value of required man power and machine in the workshop, to achieve the full utilization of man power and machine. Besides, it also compares the results obtained from the optimal pattern with that from common experience, verifying that the formers can effectively control the cost. Therefore, the research results are applicable for the planning of man and machine dispatching in the coating of steel bridge and help the decision-makers in planning.
    Appears in Collections:[Executive Master of Civil Engineering] Electronic Thesis & Dissertation

    Files in This Item:

    File Description SizeFormat
    index.html0KbHTML620View/Open


    All items in NCUIR are protected by copyright, with all rights reserved.

    社群 sharing

    ::: Copyright National Central University. | 國立中央大學圖書館版權所有 | 收藏本站 | 設為首頁 | 最佳瀏覽畫面: 1024*768 | 建站日期:8-24-2009 :::
    DSpace Software Copyright © 2002-2004  MIT &  Hewlett-Packard  /   Enhanced by   NTU Library IR team Copyright ©   - 隱私權政策聲明