中大機構典藏-NCU Institutional Repository-提供博碩士論文、考古題、期刊論文、研究計畫等下載:Item 987654321/825
English  |  正體中文  |  简体中文  |  全文笔数/总笔数 : 78818/78818 (100%)
造访人次 : 34694415      在线人数 : 1367
RC Version 7.0 © Powered By DSPACE, MIT. Enhanced by NTU Library IR team.
搜寻范围 查询小技巧:
  • 您可在西文检索词汇前后加上"双引号",以获取较精准的检索结果
  • 若欲以作者姓名搜寻,建议至进阶搜寻限定作者字段,可获得较完整数据
  • 进阶搜寻


    jsp.display-item.identifier=請使用永久網址來引用或連結此文件: http://ir.lib.ncu.edu.tw/handle/987654321/825


    题名: 既存隧道襯砌彎矩受鄰近水平新挖隧道的影響;Bending moment of lining on existing tunnel caused by new tunneling nearby
    作者: 陳安邦;An-Ben Chen
    贡献者: 土木工程研究所
    关键词: 潛盾隧道;shield tunnel
    日期: 2004-06-28
    上传时间: 2009-09-18 17:13:18 (UTC+8)
    出版者: 國立中央大學圖書館
    摘要: 擁擠的都市地下空間中,進行軟弱土層隧道開挖及近接隧道施工的案例日益增多。潛盾隧道施工過程中,由於地盤應力的變化,造成鄰近周邊地盤的變形,也造成既存隧道鄰近及結構物產生下陷、傾斜甚至結構體破壞。鄰近既存隧道旁挖新隧道時,可能造成營運中的既存隧道受損,因此如何對既存隧道的保護或新挖隧道的施工掘進管理成為相當重要的工作。 本研究分為二大主題:第一部份探討單隧道盾尾間隙閉合後,地盤應力釋放所造成的隧道襯砌彎矩大小;第二部分則探討新挖隧道的潛盾機掘進推力、盾尾間隙閉合及背填灌漿壓力等施工過程,對既存隧道局部襯砌彎矩變化之關係。 試驗結果顯示鄰近新挖隧道推進時的推力及背填灌漿壓力不會對既存隧道襯砌彎矩造成太大的影響;但是新挖隧道盾尾間隙閉合時,對襯砌彎矩影響甚鉅,且較大值會發生於既存隧道頂拱、仰拱及靠近新挖隧道的側壁。 In order to reduce the environmental impacts on traffic in crowded cities, new shield tunneling nearby an exiting tunnel is increasing recently. The change of ground stresses due to tunneling process would cause the displacement of soil around a tunnel. It is a key issue to take appropriate measures to protect an existing tunnel not to be in danger during new tunneling nearby it. In the study, a series of three-dimensional parallel tunnel model with two different cover-to-diameter ratios (C/D = 2 and 3, d/D = 1.5) tested in an acceleration of 100 g was first used to investigate the bending moments on the tunnel lining during the tail voids closure. Secondly, the bending moment on an existing tunnel caused by the jacking force of shield machine, the tail voids closure and the pressure of back grouting due to new tunneling nearby were investigated. The test results in this study show that the bending moments of lining on a existing tunnel caused by the jacking force and back grouting pressure resulted from new tunneling have no significant changes compared to those already developed on the existing tunnel. However, the tail voids closure resulted from new tunneling will increase a large amount of bending moment at the crown, the invert and the side wall near the new driven tunnel on the lining of existing tunnel.
    显示于类别:[土木工程研究所] 博碩士論文

    文件中的档案:

    档案 大小格式浏览次数


    在NCUIR中所有的数据项都受到原著作权保护.

    社群 sharing

    ::: Copyright National Central University. | 國立中央大學圖書館版權所有 | 收藏本站 | 設為首頁 | 最佳瀏覽畫面: 1024*768 | 建站日期:8-24-2009 :::
    DSpace Software Copyright © 2002-2004  MIT &  Hewlett-Packard  /   Enhanced by   NTU Library IR team Copyright ©   - 隱私權政策聲明