中大機構典藏-NCU Institutional Repository-提供博碩士論文、考古題、期刊論文、研究計畫等下載:Item 987654321/90246
English  |  正體中文  |  简体中文  |  全文筆數/總筆數 : 80990/80990 (100%)
造訪人次 : 41655002      線上人數 : 2280
RC Version 7.0 © Powered By DSPACE, MIT. Enhanced by NTU Library IR team.
搜尋範圍 查詢小技巧:
  • 您可在西文檢索詞彙前後加上"雙引號",以獲取較精準的檢索結果
  • 若欲以作者姓名搜尋,建議至進階搜尋限定作者欄位,可獲得較完整資料
  • 進階搜尋


    請使用永久網址來引用或連結此文件: http://ir.lib.ncu.edu.tw/handle/987654321/90246


    題名: 公共工程展延時選擇工期關聯成本計算模式之研究;Selecting Time-related Costs Calculation Approaches for Extension of Time in Public Construction Works
    作者: 張宜庭;Chang, Yi-Ting
    貢獻者: 土木系營建管理碩士在職專班
    關鍵詞: 展延工期;工程延遲;展延工期管理費;時間關聯成本;工程管理費;Extension of Time;Schedule Delay;EOT Management Fees;Time-related Costs;Project Overhead
    日期: 2022-08-27
    上傳時間: 2022-10-04 12:23:08 (UTC+8)
    出版者: 國立中央大學
    摘要: 當承包商提出展延工期索賠時,大多數情況下,業主不會同意承包商的索賠金額,導致承包商和業主之間發生爭議。不同原因引起的展延工期,其補償費用的內容會有所不同,部分的費用可以列入補償範圍,部分則無法列入補償範圍,必須針對問題通過具體分析來決定。而實務上,承包商大多為不熟悉工程索賠的程序和方法,缺乏索賠必須的有關資料、數據和記錄等。本研究採歸納分析方式,收集國內外工期遲延或展延工期相關研究報告及重要文獻,比較國內各機關契約範本中的計算公式,及國外能夠收集到的計算方式。此外,透過案例分析,針對影響展延工期因素、展延補償處理依據、管理費補償計算方式及所得到之補償金額比率進行試算分析,整理出工期展延相關之爭議事件時索賠金額計算作為參考,進而提出「時間關聯成本求償方法之選用流程圖」,透過此一流程圖,承包商執行工期展延與相關費用請求時,可以參考該流程圖,逐一檢視本身工作的完整性,以及該如何選擇最合適時間關聯費用的計算方式,以利獲得對本身最有利的求償結果。;In most cases, a contractor claims on Extension of Time (EOT), but the owner won’t agree with the compensation the contractor claimed. That’s why disputes usually occur between contractors and owners. There will be different costs caused by different EOT situations. Some of them can get paid, and some don’t, depending on the outcomes of comprehensive analyses for each situation. In practice, because of the lack of understanding on claim procedure and time-related costs calculation approaches, contractors usually fail on necessary collection of data, evidence and records for successful claims. Based on an intensive literature review, this study then adopted an inductive analysis to collect available time-related costs calculation approaches for EOT. Furthermore, this study performed time-related costs calculations for two real cases based on collected delay factors, compensation regulations in contracts, and other evidence. This study has developed a selection procedure of time-related costs calculation approaches for EOT. The contractor can use the procedure to check the completeness of claim preparation and how to select suitable time-related costs calculation approach for best claim outcomes.
    顯示於類別:[營建管理研究所碩士在職專班] 博碩士論文

    文件中的檔案:

    檔案 描述 大小格式瀏覽次數
    index.html0KbHTML68檢視/開啟


    在NCUIR中所有的資料項目都受到原著作權保護.

    社群 sharing

    ::: Copyright National Central University. | 國立中央大學圖書館版權所有 | 收藏本站 | 設為首頁 | 最佳瀏覽畫面: 1024*768 | 建站日期:8-24-2009 :::
    DSpace Software Copyright © 2002-2004  MIT &  Hewlett-Packard  /   Enhanced by   NTU Library IR team Copyright ©   - 隱私權政策聲明