中大機構典藏-NCU Institutional Repository-提供博碩士論文、考古題、期刊論文、研究計畫等下載:Item 987654321/9619
English  |  正體中文  |  简体中文  |  全文笔数/总笔数 : 80990/80990 (100%)
造访人次 : 41690209      在线人数 : 1514
RC Version 7.0 © Powered By DSPACE, MIT. Enhanced by NTU Library IR team.
搜寻范围 查询小技巧:
  • 您可在西文检索词汇前后加上"双引号",以获取较精准的检索结果
  • 若欲以作者姓名搜寻,建议至进阶搜寻限定作者字段,可获得较完整数据
  • 进阶搜寻


    jsp.display-item.identifier=請使用永久網址來引用或連結此文件: http://ir.lib.ncu.edu.tw/handle/987654321/9619


    题名: 基於結構矩陣之流程與專案轉換系統;A DSM-based Process and Project Transformation System
    作者: 劉紀甫;Ji-fu Liu
    贡献者: 資訊工程研究所
    关键词: 專案計劃;組織流程;分工結構圖;專案定義流程;project plan;organizational process;WBS;project defined process
    日期: 2008-07-10
    上传时间: 2009-09-22 11:51:55 (UTC+8)
    出版者: 國立中央大學圖書館
    摘要: 在軟體開發流程裡,專案計劃(project plan)扮演著不可或缺的角色,專案計劃不僅可以幫助專案開發人員訂定專案範圍(scope)、預估費用成本(cost and effort)以及時程(schedule),更可以在專案執行時協助專案監控與控制(project monitor and control)。而軟體開發專案的開發可以參考組織流程(organizational process),由於組織流程中整合了組織文化(organizational culture),參考組織文化來開發專案可以避免同樣的錯誤不斷發生,因此參考組織流程能讓各軟體開發專案得到較穩定的流程效能。 本研究提供專案計劃導入組織流程之方法並實作流程與專案轉換系統,整合了組織流程與專案計劃之雙向轉換: ? Process2WBS 專案管理員可以透過此轉換功能導入組織流程,並根據分工結構圖類型(WBS Type)產生分工結構圖。 ? WBS2Process 專案管理員可以透過此轉換功能將分工結構圖轉換成可執行的專案定義流程(Project Defined Process),即XPDL檔案。 In the software development process, the primary uses of the project plan are not only to document approved scope, cost, effort and schedule, but also guide both project monitor and control when project execution. In order to gain more stable process performance and to benefit organizational cultures, the organizational process can be utilized when build a project plan. Organizational processes enable consistent process performance across the organization and provide a basis for cumulative, long-term benefits to the organization. This research propose a methodology to transform the organizational process to project plan (WBS) and transform the project plan to executable process(XPDL). The PPTS (Process and Project Transformation System) is also implemented to assist project managers in developing project plan and project defined process. The primary functionalities of the PPTS are list below: ? Process2WBS The project manager can import organizational process and transform to WBS based on the WBS type. ? WBS2Process The project manager can transform the WBS to executable process (XPDL).
    显示于类别:[資訊工程研究所] 博碩士論文

    文件中的档案:

    档案 大小格式浏览次数


    在NCUIR中所有的数据项都受到原著作权保护.

    社群 sharing

    ::: Copyright National Central University. | 國立中央大學圖書館版權所有 | 收藏本站 | 設為首頁 | 最佳瀏覽畫面: 1024*768 | 建站日期:8-24-2009 :::
    DSpace Software Copyright © 2002-2004  MIT &  Hewlett-Packard  /   Enhanced by   NTU Library IR team Copyright ©   - 隱私權政策聲明