參考文獻 |
Akturk, M., S. and Yilmaz, H., 1996, “Scheduling of automated guided vehicles in a decision making hierarchy,” International Journal of Production Research, 34(2), 577-591.
Aker, A. D., 1991, Manufacturing Control with a Market-driven Contract Net, Ph.D. Dissertation, Rensselaer Polytechnic Institute.
Bartholdi, J. J., and Platzman, L. K., 1989, “Decentralized control of automated guided vehicles on a simple loop,” IIE Transactions, 21(1), 76-81.
Bond, A. H. and Gasser, L., 1988, Reading in Distributed Artificial Intelligence, Morgan Kaufmann.
Bozer, Y. A. and Srinivasan, M. M., 1989, “Tandem configurations for AGV systems offer simplicity and flexibility,” Material Handling System, 21(2), 23-27.
Bozer, Y. A. and Srinivasan, M. M., 1989, “Tandem configurations for AGV systems offer simplicity and flexibility,” Material Handling System, 21(2), 23-27.
Dilts, D. M., Boyd, N. P. and Whorms, H. H., 1991, "The Evolution of Control Architectures for Automated Manufacturing Systems," Journal of Manufacturing Systems, Vol.10, No. 1, pp. 79-93.
Davis, R. and Smith, R. G., 1983, "Negotiation as a Metaphor for Distributed Problem Solving," Artificial Intelligence, Vol. 20, No. 1, pp.63-109.
Egbelu, P. J., 1987b, “Pull versus push strategy for automated guided vehicle load movement in a batch manufacturing system,” Journal of Manufacturing Systems, 6(3), 209-221.
Egbelu, P. J., and Tanchoco, J. M. A., 1984, “Characterization of automatic guided vehicle dispatching rules,” International Journal of Production Research, 22(3), 359-374.
Egbelu P. J., and Tanchoco, J. M. A., 1986, “Potentials for bi-directional guide-path for automated guided systems,” International Journal of Production Research, 24(5), 1075-1097.
Gaskins, R. J., and Tanchoco, J. M. A., 1987, “Flow path design for automated guided vehicle systems,” International Journal of Production Research, 25(5), 667-676.
Gillet, B. E. and Miller, L. R., 1974, “A heuristic algorithm for the vehicle-dispatch problem,” Operations Research, 22(2), 340-349.
Gillet, B. E. and Miller, L. R., 1974, “A heuristic algorithm for the vehicle-dispatch problem,” Operations Research, 22(2), 340-349.
Gillet, B. E. and Miller, L. R., 1974, “A heuristic algorithm for the vehicle-dispatch problem,” Operations Research, 22(2), 340-349.
Kadar, B., Monostori, L. and Szelke, E., 1998, "An Object-oriented framework for developing distributed manufacturing architectures," Journal of Manufacturing Systems, Vol. 9, pp. 173-179.
Kim, C. W. and Tanchoco, J. M. A., 1991, “Conflict-free shortest path bi-directional AGV routing,” International Journal of Production Research, 29(12), 2377-2391.
Kim, J. and Klein, C. M., 1996, “Location of departmental pickup and delivery points for an AGV system,” International Journal of Production Research, 34(2), 407-420.
Kim, J. and Klein, C. M., 1996, “Location of departmental pickup and delivery points for an AGV system,” International Journal of Production Research, 34(2), 407-420.
Lin , G. Y., 1993, “A Distributed Production Control For an Intelligent Manufacturing Systems,” Ph. D. Thesis, Prudue University.
Lin , G. Y., 1993, “A Distributed Production Control For an Intelligent Manufacturing Systems,” Ph. D. Thesis, Prudue University.
Maxwell, M. 1983, “Distribute vs. centralized control for profit.” Proc. of 5:th IFAC Workshopon Distributed Computer Control System, Sabi-Sabi, South Africa.
Maxwell, M. 1983, “Distribute vs. centralized control for profit.” Proc. of 5:th IFAC Workshopon Distributed Computer Control System, Sabi-Sabi, South Africa.
Occena, L. G., and Yokota, T., 1993, “Analysis of the AGV loading capacity in a JIT environment,” Journal of Manufacturing system, 12(1), 24-35.
Pels, H. J., Wortmann, J.C. and Zwegers, A.J.R., 1997, "Flexibility in manufacturing: An architectural point of view," Computer in Industry, Vol. 33, pp. 271-283.
Smith, R. G., 1980, "The Contract Net Protocol: High-Level Communication and Control in a Distributed Solver," IEEE Transactions on Computers, Vol. C-29, No. 12, pp.1104-1113.
Smith, R. G., and Davis, R., 1981, "Frameworks for Cooperation in Distributed Problem Solving," IEEE Transactions on System, Man and Cybernetics, Vol. SMC-11, No. 1, pp.61-70.
Sinriech, D. and Tanchoco, J. M. A., 1991, “Intersection graph method for AGV flow path design,” International Journal of Production Research, 29(9), 1725-1732.
Sinriech, D. and Tanchoco, J. M. A., 1991, “Intersection graph method for AGV flow path design,” International Journal of Production Research, 29(9), 1725-1732.
Tompkins .J.A. and White,J.A, 1984, Facility Planning , Wiley, New York.
Tompkins .J.A. and White,J.A, 1984, Facility Planning , Wiley, New York.
何應欽、張世昌,1998, “多載量無人搬運車系統在及時生產環境下之即時控制策略,” 中國工業工程學會八十七年年會,台灣彰化(大業大學).
黎士賢,1999, “網路式移動區域控制無法搬運車系統,” 國立中央大學工業管理研究所碩士論文。 |