1. Lee, H.-S., et al., Method for Calculating Schedule Delay Considering Lost Productivity. Journal of construction engineering and management, 2005. 131(11): p. 1147-1154.
2. González, P., et al., Analysis of Causes of Delay and Time Performance in Construction Projects. Journal of Construction Engineering and Management, 2014. 140(1): p. 04013027.
3. Yang, J.-B. and C.-K. Kao, Critical Path Effect Based Delay Analysis Method for Construction Projects. International Journal of Project Management, 2012. 30(3): p. 385-397.
4. Majid, I.A., Causes and Effect of Delays in Aceh Construction Industry. 2006, Universiti Teknologi Malaysia, Faculty of Civil Engineering.
5. Nadu, T., Study on the Quantification of Delay Factors in Construction Industry.
6. Gündüz, M., Y. Nielsen, and M. Özdemir, Quantification of Delay Factors Using the Relative Importance Index Method for Construction Projects in Turkey. Journal of Management in Engineering, 2013. 29(2): p. 133-139.
7. Pourrostam, T. and A. Ismail. Causes and Effects of Delay in Iranian Construction Projects. in International Conference on Construction and Project Management,(ICCPM 2010), Chengdu, China. 2012.
8. Indonesia Ministry of Public Work. Strategic Plan Ministry of Public Work. 2014: Indonesia.
9. Alwi, S. and K.D. Hampson, Identifying The Important Causes of Delays in Bulding Construction Projects. 2003.
10. Trigunarsyah, B., Constructability Practices Among Construction Contractors in Indonesia. Journal of Construction Engineering and Management, 2004. 130(5): p. 656-669.
11. Junaidi, M.A. and I.A. Majid, Faktor-faktor Utama Non Excusable Delays yang Berkontribusi Terhadap Waktu Pelaksanaan Proyek Konstruksi di Kabupaten Aceh Jaya.
12. Kamaruzzaman, F., Study of Delay in The Completion of Construction Projects. Jurnal Teknik Sipil UNTAN, 2012. 12(December 2012): p. 16.
13. Majid, M.A. and R. McCaffer, Factors of Non-Excusable Delays That Influence Contractors′ Performance. Journal of Management in Engineering, 1998. 14(3): p. 42-49.
14. Doloi, H., et al., Analysing Factors Affecting Delays in Indian Construction Projects. International Journal of Project Management, 2012. 30(4): p. 479-489.
15. Ibironke, O.T., et al., Analysis of Non-Excusable Delay Factors Influencing Contractors’ Performance in Lagos State, Nigeria. J Constr Dev Countries, 2013. 18(1): p. 53-72.
16. Hamidreza Afshari, S.K., Abbas Ghorbanali, Mahdi Borzabadi, Mahbod Valipour, Identification of Causes of Non-excusable Delays of Construction Projects. International Proceedings of Economics Development and Research, 2011. 3(2011): p. 42.
17. Trauner Jr, T.J., et al., Chapter 1 - Project Scheduling, in Construction Delays (Second Edition), T.J. Trauner, et al., Editors. 2009, Butterworth-Heinemann: Boston. p. 1-23.
18. Al‐Kharashi, A. and M. Skitmore, Causes of Delays in Saudi Arabian Public Sector Construction Projects. Construction Management and Economics, 2009. 27(1): p. 3-23.
19. Alaghbari, W.e., M.R.A. Kadir, and A. Salim, The Significant Factors Causing Delay of Building Construction Projects in Malaysia. Engineering, Construction and Architectural Management, 2007. 14(2): p. 192-206.
20. Trauner Jr, T.J., et al., Chapter 2 - Types of Construction Delays, in Construction Delays (Second Edition), T.J. Trauner, et al., Editors. 2009, Butterworth-Heinemann: Boston. p. 25-36.
21. James G. Zack and P. Emily R. Federico, Concurrent Delay – The Owner’s Newest Defense. 2011.
22. Linke, D.M.B., Concurrent Delay. 2013.
23. Motaleb, O. and M. Kishk, An Investigation into the Risk of Construction Projects Delays in the UAE. Int. J. Inf. Technol. Proj. Manag., 2013. 4(3): p. 50-65.
24. Gidado, G.A.N.a.K., Causes of Project Delay in the Construction Industry in Afghanistan. University of Brighton, 2012. 07 E 110(September, 2012): p. 63.
25. Owolabi James, D., et al., Causes and Effect of Delay on Project Construction Delivery Time.
26. Alavifar, A.H., et al., Identification, Evaluation and Classification of Time Delay Risks of Construction Project in Iran.
27. Pakistan, A., Causes and Effects of Delays in Large Construction Projects of Pakistan.
28. Astina, D.C.N., I.A.R. Widhiawati, and I.G.P. Joni, Analisis Faktor-faktor Penyebab Keterlambatan Pelaksanaan Pekerjaan Proyek Konstruksi di Kabupaten Tabanan. Jurnal Ilmiah Elektronik Infrastruktur Teknik Sipil, 2012. 1(1).
29. Handayani, R., A. Frederika, and A.A. Wiranata, Analisis Faktor-faktor Penyebab Keterlambatan Pelaksanaan Pekerjaan Proyek Gedung di Kabupaten Jembrana (Studi Kasus: Pembangunan Proyek Gedung di Kabupaten Jembrana). Jurnal Ilmiah Elektronik Infrastruktur Teknik Sipil, 2013. 2(1).
30. Messah, Y.A., T. Widodo, and M.L. Adoe, Kajian Penyebab Keterlambatan Pelaksanaan Proyek Konstuksi Gedung di Kota Kupang. Jurnal Teknik Sipil, 2013. 2(2): p. 157-168.
31. Pai, S.K. and J.R. Bharath, Analysis of Critical Causes of Delays in Indian Infrastructure Projects. International Journal of Innovative Research and Development, 2013. 2(3): p. 251-263.
32. Sambasivan, M. and Y.W. Soon, Causes and Effects of Delays in Malaysian Construction Industry. International Journal of project management, 2007. 25(5): p. 517-526.
33. Apolot, R., H. Alinaitwe, and D. Tindiwensi. An Investigation Into The Causes of Delay and Cost Overrun In Uganda’s Public Sector Construction Projects. in Second International Conference on Advances in Engineering and Technology. 2011.
34. Abd El-Razek, M., H. Bassioni, and A. Mobarak, Causes of Delay in Building Construction Projects in Egypt. Journal of Construction Engineering and Management, 2008. 134(11): p. 831-841.
35. Thomas Ng, S., Z. Tang, and E. Palaneeswaran, Factors Contributing To The Success of Equipment-Intensive Subcontractors in Construction. International Journal of Project Management, 2009. 27(7): p. 736-744.
36. Aibinu, A.A. and H.A. Odeyinka, Construction Delays and Their Causative Factors in Nigeria. Journal of Construction Engineering and Management, 2006. 132(7): p. 667-677.
37. Rahman MD. Mizanur, L.Y.D., and Ha Duy Khanh, Investigating Main Causes for Schedule Delay in Construction Project in Bangladesh. KICEM Journal of Construction Engineering and Project Management, 2014. Vol.4, No.3/Sep 2014: p. 13.
38. Mohamed, S., Safety Climate in Construction Site Environments. Journal of construction engineering and management, 2002. 128(5): p. 375-384.
39. Akogbe, R.-K.T., X. Feng, and J. Zhou, Importance and Ranking Evaluation of Delay Factors for Development Construction Projects in Benin. KSCE Journal of Civil Engineering, 2013. 17(6): p. 1213-1222.
40. Alwi, S. and K.D. Hampson, Identifying The Important Causes of Delays in Bulding Construction Projects. QUTePrints, 2003.
41. Barreiro, P.L. and J.P. Albandoz, Population and Sample. Sampling techniques. Management mathematics for European schools, 2001.
42. Field, A., Discovering Statistics Using SPSS. 2009: Sage publications.
43. Nasir, D., B. McCabe, and L. Hartono, Evaluating Risk in Construction-Schedule Model (Eric-S): Construction Schedule Risk Model. Journal of Construction Engineering and Management, 2003. 129(5): p. 518-527.
44. McCabe, B., S.M. AbouRizk, and R. Goebel, Belief Networks for Construction Performance Diagnostics. Journal of Computing in Civil Engineering, 1998. 12(2): p. 93-100.
45. Liu, J. Bayesian Network Inference on Risks of Construction Schedule-Cost. in Information Science and Management Engineering (ISME), 2010 International Conference of. 2010. IEEE.
46. Lianwen, Z. and G. Haipeng, Introduction to Bayesian Networks. Beijing: Science publication, 2006: p. 31-41.
47. De Melo, A.C. and A.J. Sanchez, Software Maintenance Project Delays Prediction Using Bayesian Networks. Expert Systems with Applications, 2008. 34(2): p. 908-919.
48. Kim, S.-Y., N. Van Tuan, and S.O. Ogunlana, Quantifying Schedule Risk in Construction Projects Using Bayesian Belief Networks. International Journal of Project Management, 2009. 27(1): p. 39-50.
49. Horvitz, C.M.K.D.H.E., MSBNx: A Component-Centric Toolkit for Modeling and Inference with Bayesian Networks Microsoft Research Microsoft Corporation One Microsoft Way Redmond, WA 98052 2001. MSR-TR-2001-67
50. Indonesia Central Bureau of Statistic. Construction Statistic 2014. 2014.
51. Kaming, P.F., et al., Regional Comparison of Indonesian Construction Productivity. Journal of Management in Engineering, 1997. 13(2): p. 33-39.
52. Adi, N., Faktor-faktor yang Berkontribusi Terhadap Keterlambatan Proyek Konstruksi di PT. Newmont Nusa Tenggara. 2014.
53. World Bank. World Bank List of Economies. 2015.
54. Aziz, R.F., Ranking of Delay Factors in Construction Projects After Egyptian Revolution. Alexandria Engineering Journal, 2013. 52(3): p. 387-406.
55. Frimpong, Y., J. Oluwoye, and L. Crawford, Causes of Delay and Cost Overruns in Construction of Groundwater Projects in A Developing Countries; Ghana As A Case Study. International Journal of project management, 2003. 21(5): p. 321-326.
56. Burton ShAw-Gunn, S.A., Risk and Financial Management in Construction. 2009: Gower Publishing, Ltd.
57. Gundecha, M., Study of Factors Affecting Labor Productivity at a Building Construction Project in the USA: Web Survey. 2012, North Dakota State University.
58. Akanni, P.O., A.E. Oke, and O.A. Akpomiemie, Impact of Environmental Factors on Building Project Performance in Delta State, Nigeria. HBRC Journal, 2015. 11(1): p. 91-97.
59. Bonneville Power Administration, Project Components and Construction, Operation, and Maintenance Activities. 2012. |