參考文獻 |
1.陳瑞鈴、楊智斌等,「國內外推動BIM之策略與成效比較研究」,內政部建築研究所協同研究計畫,2016。
2.楊智斌等,「機關辦理公共工程導入建築資訊建模(BIM)技術」,行政院公共工程委員會委託專業服務案,2017。
3.楊智斌等,「鐵道工程BIM作業指引研訂」,交通部鐵道局委託計術服務案,2018。
4.Tsai, M.H., Mom, M. and Hsieh, S.H.," Developing critical success factors for the assessment of BIM technology adoption: part I. Methodology and survey", Journal of the Chinese Institute of Engineers, 37(7): pp. 845-858, 2014.
5.陳瑞鈴、楊智斌,「我國建築工程BIM應用分類之評估選用方法研究」,內政部建築研究所協同研究計畫,2017。
6.Ruwini Edirisinghe, K.L.,"Comparative Analysis of International and National Level BIM Standardization Efforts and BIM adoption", CIB W78 Conference, 2015.
7.Shijing Liu, B.X., Linda Tivendal,Chunlu Liu,"The Driving Force of Government in Promoting BIM Implementation", Journal of Management and Sustainability. Journal of Management and Sustainability, Vol. 5, No. 4, pp. 157-164, 2015
8.Jack C.P. Cheng, Q.L., M.Phil, "A Review of the efforts and roles of the public sector for BIM adoption world-wide", ITcon, Vol. 20, Cheng & Lu, pp. 442-478, 2015.
9.Robert Eadie, H.O., Mike Browne, Clare McKeown, Michael Yo-hanis,"An Analysis of the Drivers for Adopting Building Information Modeling", ITcon,Vol. 18, pp. 338-352, 2013.
10.Smith, P.,"BIM implementation – global strategies. Procedia Engineering", 85: pp. 482-492, 2014.
11.鄭孟昌,「數位時代的審照模式」,中國工程師學會工程雙月刊,第87卷05期: 第39-45頁,2014。
12.黃毓舜,「新北市政府BIM執行計畫與成果-建築與工程管理的新挑戰」,中國工程師學會工程雙月刊,第87卷05期:第30-38頁,2014。
13.丁育群,「內政部營建署於營建工程導入建築資訊模型之推動與應用」,中國工程師學會工程雙月刊,第85卷05期:第10-17頁,2014。
14.鄭泰昇等,「國內BIM元件通用格式與建置規範研究」,內政部建築研究所委託研究報告,2015。
15.邱垂德等,「我國BIM協同作業指南之研訂-設計與施工階段資訊交換」內政部建築研究所委託研究報告,2015。
16.余文德等,「我國BIM協同作業指南執行要項研擬」內政部建築研究所委託研究報告,2016。
17.許俊逸、徐景文、林傑、李文欽,「BIM 帶來的變革與政府的前瞻作為」,中國工程師學會工程雙月刊,第87卷:第2-9頁,2014。
18.許坤榮,「建築資訊模型發展道路圖(BIM ROADMAP)」,臺灣建築學會會刊雜誌,第12-18頁,2016。
19."BIM Project Execution Planning Guide V 2.1", The Pennsylvania State University, University Park, PA, USA., Penn State University, 2011.
20.Ralph G. Kreider, a.J.I.M., "The uses of BIM - Classifying and Selecting BIM Uses V0.9", The Pennsylvania State University, University Park, PA, USA, 2013.
21.John Messner, C.A., "BIM planning guide for facility owner V2.0", The Pennsylvania State University, University Park, PA, USA, 2013.
22.臺大BIM研究中心,「業主BIM 實施方針之擬定指引 (2017版)」,臺大土木工程資訊模擬與管理研究中心,2017。
23.謝尚賢、柳儒錚,「給業主的BIM導入指引」,土木水利第四十四卷:第39-44頁,2017。
24.Edirisinghe, R., K. London, and T.N.-O, "Comparative analysis of international and national level BIM standardization efforts and BIM adoption", CIB W78 conference Eindhoven, pp.149-158 , 2015.
25.劉青峰,「英國政府運用BIM於公有建築使用階段之策略」,內政部建築研究所自行研究報告,2015。
26.Building and Construction Authority, "BIM e-Submission Guideline for Architectural Displine v3.5", Building and Construction Authority: Sigapore, 2010.
27.Building and Construction Authority, "BIM e-Submission Guideline for Architectural Displine v3.5", Singapore, 2010.
28.Building and Construction Authority, "Singapore BIM Guide Version 1.0", Singapore, 2012.
29.Building and Construction Authority, "Singapore BIM Guide Version 2.0", Singapore, 2013.
30.王明德,「我國BIM的發展策略與實施藍圖推動架構之芻議」,中國工程師學會工程雙月刊,第87卷05期:第46-58頁,2014。
31.Khosrowshahi, F.a.Y.A., Roadmap for implementation of BIM in the UK construction industry. Engineering. Construction and Architectural Management, 19(6), pp. 610-635, 2012.
32.Cabinet Office and Infrastructure and Projects Authority, U., Government Construction Strategy: 2016-2020, 2016.
33.張長桂,「標竿學習法應用於地方政府之個案探」,國立中山大學公共事務管理研究所碩士論文,2002。
34.Succar, B.,"The Five Components of BIM Performance Measurement", Proceedings of the CIB World Congress 2010,Salford Quays, United Kingdom., pp.157-171, 2010.
35.Kreider, R.G. and J.I. Messner, "The uses of BIM - Classifying and Selecting BIM Uses V0.9", The Pennsylvania State University, University Park, PA, USA, 2013.
36.Program, C.I.C.R., "BIM planning guide for facility owners V2.0". The Pennsylvania State University, 2013.
37.余文德、鄭紹材、賴朝俊,「我國BIM協同作業指南執行要項研擬」,內政部建築研究所委託研究報告,2016。
38.邱垂德、余文德、鄭紹材,「我國BIM協同作業指南之研訂-設計與施工階段資訊交換」,內政部建築研究所委託研究報告,2015。
39.Khosrowshahi, F. and Y. Arayici, "Roadmap for implementation of BIM in the UK construction industry", Engineering, Construction and Architectural Management, 19(6): pp. 610-635, 2012.
40.UK, "AEC (UK) BIM Protocol Project BIM Execution Plan", 2012.
41.Shou, W., J. Wang, X. Wang and H. Y. Chong, "A Comparative Review of Building Information Modelling Implementation in Building and Infrastructure Industries, "Archives of Computational Methods in Engineering, pp.291-308, 2014.
42.上海市城鄉建設和管理委員會,「上海市建築資訊模型技術應用指南」,2015。
43.Henry L. Green, Hon , "National BIM Guide for Owners", National Institute of Building Sciences, 2017.
44.交通部,「交通部所屬各機關(構)工程建置建築資訊模型(BIM)作業推動原則」,2015。
45.Barlish, K. and Sullivan, K., “How to measure the benefits of BIM- A case study approach”, Automation in Construction, Vol. 24, pp. 149-159, 2012.
46.Hoffer, E.R., Autodesk, Inc, “Measuring the Value of BIM: Achieving Strategic ROI”, Autodesk, Inc, 2014.
47.Peter E.D. Love, Ian Simpson, Andrew Hill, Craig Standing ,” From justification to evaluation: Building information modeling for asset owners”, Automation in Construction, Volume 35, November, pp. 208-216, 2013.
48.Brittany K. Giel and Raja R. A. Issa, “Return on Investment Analysis of Using BuildingInformation Modeling in Construction”, UNIVERSITY OF FLORIDA, 2009.
49.Adriana X. Sanchez, Keith D. Hampson and Simon Vaux, " Delivery Value with BIM, "Sustainable Built Environment National Research Centre, 2016.
50.Chuck Eastman, P. T., R. Sacks, and K. Liston, "BIM Handbook: A Guide to Building Information Modeling for Owners, Managers, Designers, Engineers and Contractors, "Second Edition,Wiley, 2011.
51.Deke Smith, "An Introduction to Building Information Modeling (BIM) ", Jour-nal of Building Information Modeling, pp.12-15, 2007.
52.王明德,「建築資訊模型(BIM)如何運作與導入之效益(上)」,公共工程電子報,第52期,2012。
53.王茂興,「建築物資訊模擬」,水利土木科技資訊季刊,第47期,第16-19頁,2010。
54.康思敏、葛翊凡,「BIM在設施管理上之應用」,臺灣建築學會會刊雜誌,第81期,第48-53頁,2016。
55.謝尚賢、黃建勳、郭瀚嶸,「側記英國BIM之發展與應用」,營建知訊,2013。
56.楊智斌、周慧瑜、王維志、曾惠斌,「公共工程合適專案執行方式評估與執行策略之研究」,財團法人中華顧問工程司研究報告,2015。
57.財團法人台灣建築中心,「國內BIM技術應用及國際推動情形分析」,內政部建築研究所委託研究報告,2015。
58.建築資訊整合分享與應用研發推廣計畫,內政部建築研究所,(http://www.abri.gov.tw/tw/tech_planing/25),2015 。
59.劉青峰,「美國建築資訊建模標準NBIMS-US研究」,內政部建築研究所自行研究成果報告,2013。
60.李云贵,「國內外BIM標準與技術政策」,中國建設信息,第20期,第14-17頁,2012。
61.鲁班软件有限公司,「住建部《推進建築資訊模型指導意見》:六大關鍵資訊解讀」,2015。
62.中華人民共和國住房和城鄉建設部:http://www.mohurd.gov.cn/zxydt/201605/t20160516_227459.html。(瀏覽日期:2018年5月)
63.魯班軟體有限公司,http://www.lubansoft.com/index.php?_c=dongtai&_a=dongtai_front&dongtai_id=1565,2015。
64.中國建築科學研究院,「建研院成功申報國家十三五重點專項《基於BIM的預製裝配建築體系應用技術》項目」,http://www.pkpm.cn/html/2016-06/5739.html,2016。
65.中國BIM發展聯盟,http://www.bimunion.org/。(瀏覽日期:2018年3月)
66.中國BIM發展聯盟-中國工程建設標準化協會建築信息模型專業委員會,http://www.bimunion.org/html/zgbimfzlm/index.html。
67.中國BIM發展聯盟-中國工程建設標準化協會建築信息模型專業委員會,http://www.bimunion.org/html/cycxzllm/index.html。
68.重慶市城鄉建設委員會,http://www.ccc.gov.cn/。(瀏覽日期:2018年7月)
69.重慶市勘察設計協會,http://www.cksx.org/。(瀏覽日期:2018年7月) |