參考文獻 |
[1] 國立中央大學橋梁與軌道工程研究中心,臺灣桃園國際機場聯外捷運系統建設計畫「軌道及橋梁監測作業」委託技術服務案第一季監測季報告(2017),交通部高速鐵路工程局。
[2] 陳恩加,「鋼軌扣件組破壞模擬分析」,碩士論文,國立臺北科技大學,台北(2019)。
[3] 黃民仁,張欽亮,新世紀鐵路工程學基礎篇,文笙書局,臺北(2013)。
[4] 黃民仁,新世紀鐵路工程學,文笙書局,臺北(2005)。
[5] 交通部,1067公厘軌距軌道橋隧檢查養護規範,臺北(2014)。
[6] Union Internationale des Chemins de fer. UIC Code 774–3R. Track/bridge interaction. Recommendations for calculations. Paris: International Union of Railways(2001).
[7] DIN. DIN-fachbericht 101. Einwirkungen auf Brücken. Berlin(2003).
[8] Chinese national standards. TB10015-2012. Code for design of railway continuous welded rail. Beijing(2012).
[9] Luo, Jun., Zeng, Zhiping., “A novel algorithm for longitudinal track-bridge interactions considering loading history and using a verified mechanical model of fasteners”, Engineering Structures, Vol 183, pp.52-68(2019).
[10] Ramosa, Ó.R., Schanackb, F., Ortega Carrerasc, G., Vena Retuertoc de , J., “Bridge length limits due to track-structure interaction in continuous girder prestressed concrete bridges”, Engineering Structures, Vol 196(2019).
[11] Yun, Kyung-Min., Bae, Hyun-Ung., Jiho Moon, Kim, Jung-Joong., Park, Jong-Chan., Lim, Nam-Hyoung., “Quantification of ballasted track-bridge interaction behavior due to the temperature variation through field measurements”, NDT and E International, Vol 103, pp.84–97(2019).
[12] Sung, Deokyong.,and Chang, Seongkyu., “Nonlinear behavior of rail fastening system on slab track at railway bridge ends: FEA and experimental study”, Engineering Structures, Vol 195, pp.84–95(2019).
[13] Zhang, J., Wu, D.J., Li, Q., “Loading-history-based track–bridge interaction analysis with experimental fastener resistance”, Engineering Structures ,Vol 83, pp.62–73(2015).
[14] 宋照清,「多跨簡支梁橋上無縫線路縱向力研究」,碩士論文,北京交通大學,中國(2011)。
[15] Ruge, P., and Birk, C., “Longitudinal forces in continuously welded rails on bridgedecks due to nonlinear track–bridge interaction”, Computers and Structures, Vol.85, pp.458-475(2007).
[16] Xu, Qing-yuan., Zhou, Xiao-lin., Zeng, Zhi-ping., and Yang, Xiao-li., “Mechanics model of additional longitudinal force transmission between bridges and continuously welded rails with small resistance fasteners” Journal of Central South University of Technology,Vol. 11, pp.336–339(2004).
[17] 王維銘,「螺栓/螺絲/螺帽扣件之旋緊鎖固」,螺絲世界雙月刊,第98-102頁(2020)。
[18] 許維倫,陳則銘,許書銘,「鐵路橋橋軌互制案例分析及規範探討」,中興工程,第118期,第49-55頁(2013)。
[19] Xu, Lei., and Zhai, Wanming., “A three-dimensional model for train-track-bridge dynamic interactions with hypothesis of wheel-rail rigid contact”, Mechanical Systems and Signal Processing , Vol. 132, pp.471-489(2019).
[20] Rakesh Kumar, and Akhil Upadhyay, “Effect of temperature gradient on track-bridge interaction”, Interaction and Multiscale Mechanics, Vol. 5, No. 1, pp.1-12(2012).
[21] Kjell, G., and Johnson, E., “Measuring axial forces in rail by forced vibrations:experiences from a full-scale laboratory experiment” SP Technical Research Institute of Sweden, Borås, Sweden, Vol. 223, pp.241-254(2009).
[22] Fedorova, M., and Sivaselvan, M.V., “An algorithm for dynamic vehicle-track-structure interaction analysis for high-speed trains”, Eng. Struct. Vol. 148, pp.857–877(2017).
[23] Lou, P., Yu, Z.W., Au, F.T.K., “Rail-bridge coupling element of unequal lengths for analysing train-track-bridge interaction systems”, Appl. Math. Model. 36, pp.1395–1414(2012).
[24] Rajamani, R., “Long welded rails on girder bridges”, P-Way Bulletin(1987).
[25] Ferdinand P.Beer, E.Russeell Johnston.Jr, David F.Mazurek, “Vector Mechanics for Engineers: Statics”,Eleventh Edition in SI Units, pp. 430-451(2016).
[26] LI, Q.T., LUO,Y., LIU, Y., “ Estimating clamping force of rail fastener system by experimental and numerical methods ”, Institute of Rail Transit, Tongji University, No. 4800 Cao’an Road, Shanghai, China(2018).
[27] Kaewunruen, S., Remennikov, AM. “Field trials for dynamic characteristics of railway track and its components using impact excitation technique”, NDT E International, Vol. 40, Issue 7, pp. 510-519(2007).
[28] Gallagher, GP., Leiper, Q., Williamson, R., Clark, MR., Forde, MC. “The application of time domain ground penetrating radar to evaluate railway track ballast”, NDT E International, Vol. 32, Issue 8, pp. 463-468(1999).
[29] RYJAČEK, P., VOKAČ, M. “Long-term monitoring of steel railway bridge interaction with continuous welded rail”, J Constr Steel Res, Vol. 99, pp. 176-186(2014).
[30] Strauss, A., Karimi, S., Kopf, F., Capraru, C., Bergmeister, K. “Monitoring‐based performance assessment of rail‐bridge interaction based on structural reliability”, Structural Concrete , Vol. 16, Issue 3, pp. 342-355(2015).
[31] Papp, H., Liegner, N., “Investigation of internal forces in the rail due to the interaction of CWR tracks and steel railway bridges with ballasted track superstructure”, Pollack Period , Vol. 11, Issue 2, pp. 65–74(2016).
[32] 尚紅霞,「地鐵扣件系統靜動力分析研究」,碩士論文,西南交通大學,中國(2011).
[33] 孫大新,高亮,劉衍峰,「橋上無碴軌道無縫道岔力學特性分析」,北京交通大學學報,第31卷第1期,第89-92頁(2007)。
[34] 張文城,蘇宗寶,彭仁忠,「桃園機場聯外捷運軌道系統工程施工探討」,中華技術,第94期,第56-75頁(2012)。
[35] 楊漢生,張正欣,「鐵路橋梁與無道碴軌道設計」,中華技術,第72期(2006)。
[36] 楊漢生、張正欣,「長銲鋼軌與鐵路橋梁」,中華技術,第64期(2004)。
[37] 陳韋凱,「嵌埋式軌道跨橋段有限元素分析」,碩士論文,國立成功大學,台南(2015)。
[38] 韓宗豪,「軌溫之無限監測與預測模型」,碩士論文,國立成功大學,台南(2015)。
[39] 施柔依,「向量式有限元運用於車軌橋互制數值模擬分析」,碩士論文,國立中央大學,桃園(2010)。
[40] 邱宇彰,張正欣,歐文爵,「彈性 PC 軌枕防振直結軌道與橋上長軌設計案例」,中華技術,第67期(2005)。 |