The problem that the construction industry is facing is that the construction quality of engineering projects using traditional construction method is being questioned. Moreover, labor shortage problem is severe. With the development of science and technology and the trend of lower birthrate, the precast concrete method is gradually taking over the cast-in-place method, hoping to solve the labor shortage problem. Furthermore, the precast method can minimize the weather influence and this can help solve the problem of not being able to perform construction due to extreme cold and hot conditions. The precast method can improve the building quality through industrialized means. It adopts a “synchronized engineering strategy” to reach the goal of rapid construction and reduce energy consumption along with noise pollution at the same time. The main engineering project of precast concrete includes tunnel linings, precast concrete curtain walls, stadium stands, structural beams and columns and floor slabs.
The two largest companies in the precast concrete field in Taiwan are Runhorn Pretech Engineering Co., Ltd and Ya Li Precast Prestressed Concrete Industries Corp. The production and operation of a precast concrete company generates “internal cost” and “external cost”. Profit and revenue related to internal cost can be learned from a listed company’s public accounting and financial statements. The accounting and financial statements allow us to learn a company’s operating conditions in a precise sense. As for external cost, it generally means the negative effect and impact caused on society and other private sectors. Electricity is the main energy consumption for factory operation. Greenhouse gas emissions, including nitrogen oxides and carbon dioxide, produced during electricity production are an important factor that causes global warming. Sulfur dioxide is the main cause of acid rain. What’s worse, the particulate matter emitted during electricity power generation is the main root of severe respiratory syndrome. Therefore, in addition to discussing the "internal cost" of a precast concrete plant itself, this study takes the "external cost" of electricity demand generated during the manufacturing process of precast products into consideration. The study shades light on the shadow price estimation of external costs caused by electricity consumption in the concrete plant; moreover, the study discusses the monetization benefit assessment of energy conservation and carbon reduction in the precast engineering process.
Energy conservation and carbon reduction are the trend of economic development all over the world. Under the assignment for regulated quota of carbon rights, we can participate in carbon trading activity regarding spatial regions or temporal interval in order to maximize the level of whole economic development and implement social justice of user charge. However, how to foster interaction between carbon trading and economic growth is the crucial issue. There are 3 carbon trading models involved in this study such as NT model, ST model and STT model. Moreover, the operational situation of DMU’s throughput direction also defined as throughput optimization consistency is taken into consideration. With the efficiency change of Malmquist productivity index (MPI), we can measure DMU’s performance and find out the shortages to make improvement on efficiency. It’s known as “throughput optimization consistency vs. efficiency change”. This study adopts meta-DEA model to figure out marginal productivity and find out optimal throughput under different weights which is assigned. We can use the law of cosine to calculate throughput optimization consistency. Taking a look at efficiency change which is known as efficiency ratio crossing 2 years.
Under the two issues mentioned above, this study is based on 22 counties and cities in Taiwan. We take electricity consumption, labor number and fiscal expenditure as input data. Then, we collect output data of gross income and carbon dioxide. Through data envelopment analysis (DEA), we implement the efficiency analysis of 22 counties and cities in Taiwan. As for the first issue, this study establishes NT model, ST model and STT model, which are regarding DEA model. We can establish four quadrants of “increasing carbon rights (%) vs. benchmarking ratio of increasing desirable output (%)” for 22 counties and cities evaluation. The result shows that lots of agricultural counties and cities can obtain great efficiency improvements through NT model. Taking a look into ST model and STT model, we find that Tainan City acquires the most increasing carbon rights with the increase of the average gross income. Changhua County acquires the lowest increasing carbon rights under the increase of the average gross income. Finally, we use Mathematical Programming to calculate the shadow price of carbon trading models.
In terms of the second issue, this study still takes 22 counties and cities in Taiwan as DMU. We propose the two-dimensional chart divided into 4 quadrants and established by “throughput optimization consistency vs. efficiency change”. The 4 quadrants are divided into "Leader", "Throughput optimization consistency focus", "Laggard" and “Efficiency focus ". All DMUs can formulate improvement on direction when they are assigned to specific position. |
參考文獻 |
[1] 台灣電力公司,2016年至2020年,105年至109年電業年報。
[2] 台灣電力公司,歷年平均單價, https://www.taipower.com.tw/upload/43/43_04/%E6%AD%B7%E5%B9%B4%E7%B5%B1%E8%A8%88/06-%E6%AD%B7%E5%B9%B4%E5%B9%B3%E5%9D%87%E9%9B%BB%E5%83%B9.pdf 。
[3] 吳延東,『藉由元資料包絡分析進行臺灣壽險產業的邊際生產力與效率分析』,國立台灣大學碩士論文,2022。
[4] 和平電力股份有限公司,2016年至2020年,105年度至109年度年報。
[5] 林佳瑩,『Estimating Directional Shadow Prices of Air Pollutant Emissions by Road Transportation Modes』,國立中央大學碩士論文,2018。
[6] 陳惠國,2022年,研究方法-基礎與進階,課程講義(待出版)。
[7] 麥寮汽電股份有限公司,2016年至2020年,105年度至109年度發電年報。
[8] 曾銘文,『中高層建築採預鑄系統工法成本結構之研究』,國立中央大學碩士論文,1997。
[9] 經濟部能源局,109年度電力排碳係數,https://www.moeaboe.gov.tw/ECW/populace/news/Board.aspx?kind=3&menu_id=57&news_id=20933。
[10] 潤弘精密工程事業股份有限公司,2016年至2021年,105年度至110年度合併財務報告暨會計師查核報告。
[11] 潤弘精密工程事業股份有限公司,2022年,碳中和利器-與傳統外牆等厚之預鑄夾芯隔熱外牆。
[12] Afriat, S. N. (1972). Efficiency estimation of production functions. International Economic Review, 13(3), 568-598.
[13] Aigner, D., Lovell, C. K., & Schmidt, P. (1977). Formulation and estimation of stochastic frontier production function models. Journal of Econometrics, 6(1), 21-37.
[14] Banker, R. D., Charnes, A., & Cooper, W. W. (1984). Some models for estimating technical and scale inefficiencies in data envelopment analysis. Management Science, 30(9), 1078-1092.
[15] Boyd, G., Molburg, J., Prince, R. (1996). Alternative methods of marginal abatement cost estimation: Non-parametric distance function. Proceedings of the USA EE/IAEE 17th Conference, 86-95.
[16] Chen, H. K., Lin, Y. H., & Lee, C. Y. (2021). Convex nonparametric least squares and stochastic semi-nonparametric frontier to estimate the shadow prices of PM2.5 and NOx for Taiwan’s transportation modes. International Journal of Sustainable Transportation, 15(9), 659-677.
[17] Dineshkumar, N., & Kathirvel, P. (2015). Comparative study on prefabrication construction with cast in-situ construction of residential buildings. International Journal of Innovative Science Engineering and Technology, 2(4), 527-532.
[18] Holla, B. R., Anant, S., Mohammad, M. A., Periwal, A., & Kapoor, A. (2016). Time , cost , productivity and quality analysis of precast concrete system. International Journal of Innovative Science, Engineering and Technology, 3(5), 252-257.
[19] Johnson, A., & Kuosmanen, T. (2014). An introduction to CNLS and StoNED methods for efficiency analysis: Economic insights and computational aspects. Benchmarking for Performance Evalutation, 117-186.
[20] Jondrow, J., Lovell, C. K., Materov, I. S., & Schmidt, P. (1982). On the estimation of technical inefficiency in the stochastic frontier production function model. Journal of Econometrics, 19(2), 233-238.
[21] Lanke, A., & Dumpa, V. (2016). Design, cost & time analysis of precast & RCC building. International Research Journal of Engineering and Technology, 3(6), 343-350.
[22] Lee, C.Y. (2017). Directional marginal productivity: a foundation of meta-data envelopment analysis. Journal of the Operational Research Society, 68(5), 544-555.
[23] Lee, C.Y. (2018). Mixed-strategy Nash equilibrium in data envelopment analysis.
European Journal of Operational Research, 266(3), 1013-1024.
[24] Lee, C.Y., & Zhou, P. (2015). Directional shadow price estimation of CO2, SO2 and NOx in the United States coal power industry 1990–2010. Energy Economics, 51(C), 493-502.
[25] Nurjaman, H. N., Hariandja, B. H., & Sidjabat, H. R. (2008). The use of precast concrete systems in the construction of low cost apartments in Indonesia. 14th World Conference of Earthquake Engineering, 1-2.
[26] Priya, P. K., & Neamitha, M. (2018). A review on precast concrete. International Research Journal of Engineering and Technology, 5(1), 967-971.
[27] Patel, R., & Sharma, N. (2016). Study of prefabrication in India. International Journal of Advanced Research in Engineering, Science and Management, 1-6.
[28] Podinovski, V. V., & Førsund, F. R. (2010). Differential characteristics of efficient frontiers in data envelopment analysis. Operations Research, 58(6), 1743-1754.
[29] Sivapriya, C., & Senthamilkumar, S. (2016). Building cost comparison of precast concrete construction with conventional construction. International Journal of Innovative Research in Science, Engineering and Technology, 5(5), 8037-8044.
[30] Tuner, J., (1995). Measuring the cost of pollution abatement in the US electric utility industry: A production frontier approach. Ph.D. Dissertation, University of North Carolina, Chapel Hill.
[31] Wang, K., Wei, Y. M., & Huang, Z. (2015). Potential gains from carbon emissions trading in China: A DEA based estimation on abatement cost savings. OMEGA, 63(C), 48-59. |