摘要(英) |
With the advancement of the times and the popularization of digital tools, the world has experienced earth-shaking influences in various industries. In the past, it was often said that "the construction industry is a leading industry that promotes economic development. It can drive the demand of upstream and downstream related industries and stimulate the country′s economic growth." However, Taiwan′s construction output value is far behind from that of the advanced country for more than 50%. From the beginning to the end of the engineering project, there are countless people, things involved, most of the views pay special attention to the relationship between the owner, the designer, and the constructor. It’s believed that the interaction between the three will directly affect the problem of delays in progress and the problem of exceeding the owner′s budget. It is also the key to the success or failure of a project. The concepts of integrated project delivery is far different from traditional contracting. Without dividing the life cycle of the project into different stages, IPD consider the project as a whole, integrating personnel, systems, business structures, profit sharing models, and resources to promote all the stakeholders to get involved in the project the sooner the better. The stakeholders may take what they need and share ideas hoping to achieve the possibility of reducing waste and maximizing benefits. At the same time, it is expected to deliver optimized results to the owner, add value to the project as much as possible, and improve efficiency of the project. This thesis intends to discuss the content of the integrated project delivery contract, and discusses its operational, commercial, and organizational aspects, also the possibility, obstacles, promotion strategies of implementing the integrated project delivery system in Taiwan. |
參考文獻 |
參考文獻
1. AIA California Council, (2007), “Integrated project delivery – A working definition.”.
2. AIA, AIA Minnesota, (2012), “School of Architecture –Universit y of Minnesota IPD CASE STUDIES”.
3. AMANDA FISH, B.S., (2011), INTEGRATED PROJECT DELI VERY: THE OBSTACLES OF IMPLEMENTATION”, Kansas St ate University.
4. Ballard, H. G., (2005), “The last planner™ system of productio n control” (PhD dissertation) School of Civil Engineering, the University of Birmingham UK.
5. BuildingsGuide Staff, (2023), “An Introduction to Lean Construc tion”, < https://www.buildingsguide.com/blog/introduction-lean-con struction/ >, last visited on Mar 21, 2023.
6. CMAA, (2023), “Managing Integrated Project Delivery”。
7. Debashis Sarkar, (2010), “The A3 Problem Solving Way: An In troduction”, < https://www.processexcellencenetwork.com/lean-six-
sigma-business-performance/columns/the-a3-problem-solving-way-a
n-introduction >, last visited on Mar 21, 2023.
8. Fallon, K. K. & Hagan, S. R., (2006), “Report on integrated pr actice”.
9. Greg Howell and Glenn Ballard, (1999), “Lean Production Theo ry: Moving Beyond”.
10. Integrated Project Delivery, (2010), Case Studies。
11. KaiNexus, (2017), “A Quick Guide to Lean Construction”, < htt
ps://blog.kainexus.com/improvement-disciplines/lean/lean-constructi on/a-quick-guide-to-lean-construction >, last visited on Mar 21, 2
023.
12. S. Keoki Sears, Glenn A. Sears, Richard H. Clough, Jerald L.
129
參考文獻
Rounds, Robert O. Segner, (2015), ”6th Edition Construction Pr oject Management”, John Wiley & Sons.
13. Sacks, R., Radosavljevic, M., & Barak, R., (2010), ”Requiremen ts for building information modeling based lean production man agement systems for construction”, Automation in Construction,
< https://www.sciencedirect.com/science/article/abs/pii/S092658051
0000373 >, last visited on Mar 21, 2023.
14. Tyler Stone, (2021), “The Pros and Cons of Five Project Delive ry Methods”, < https://neumannmonson.com/blog/pros-and-cons-fi
ve-project-delivery-methods >, last visited on Mar 21, 2023.
15. The American Institute of Architects (AIA), (2007), “Integrated Project Delivery: A Guide”, < https://www.aia.org/resources/6414 6-integrated-project-delivery-a-guide >, last visited on Mar 21, 2
023.
16. Tom Richert, (2017), What is the Last Planner System?, < https
://leanconstructionblog.com/What-is-the-Last-Planner-System.html >, last visited on Mar 21, 2023.
17. Victor E. Sanvido and Mark D. Konchar, (1999), “Selecting Pro ject Delivery Systems: Comparing Design-Build, Design-Bid-Buil d And Construction Management At Risk”.
18. WIKIPEDIA, (2023), Lean construction, < https://en.wikipedia.or
g/wiki/Lean_construction >, last visited on Mar 21, 2023.
19. bittermelon,(2023),審計的九種技巧(7):Reconciliation,< ht
tp://bittermelon2009.blogspot.com/2012/03/7reconciliation.html >, 最後瀏覽日期:2023年3月21日。
20. Leadership,(2016),5S/6S 工作環境現場管理 5S/6S Workplace Methodology,< https://www.isoleader.com.tw/home/iso-coaching-d
etail/5S >,最後瀏覽日期:2023年3 月21日。
21. MBA智庫百科,(2023),備抵法,< https://wiki.mbalib.com/zh-tw
/%E5%A4%87%E6%8A%B5%E6%B3%95 >,最後瀏覽日期:20
130
參考文獻
23年3月21日。
22. MBA智庫百科,(2023),端到端的流程,< https://wiki.mbalib.co
m/zh-tw/%E7%AB%AF%E5%88%B0%E7%AB%AF%E7%9A%84
%E6%B5%81%E7%A8%8B >,最後瀏覽日期:2023年3月21日
。
23. 中華民國內政部營建署,(2020),營造業經濟概況調查報告。
24. 五南書局,(2023),債編。
25. 郭岱希,(2020),重振台灣火車頭產業地位,營建業如何用數位 轉型邁向建築4.0?,天下雜誌。
26. 王伯儉,(2020),專案工程契約管理。
27. 李嘉慶、蕭偉松,(2009),統包契約相關法律問題之探討,土木 水利,第36卷,第3期,頁28。
28. 牧也和夫,(2011),英文契約書一點也不難!閱讀與撰寫範例實 務。
29. 邱聰志,(2003),新訂民法債編通則。
30. 范素玲,(2021),IPD應用議題探討-以首次應用IPD之業主為例
,土木水利,第48卷,第1期,頁47。
31. 財團法人營建研究院,(2011),台灣地區房地產年鑑。
32. 陳怡如,(2013),以精實管理及模擬最佳化求解高科技廠建廠施 工人力數量問題,國立成功大學,碩士論文。
33. 陳韋均,(2016),以價值溪流圖改善製藥廠流程,逢甲大學,碩 士論文。
34. 陳彩稚,(2012),企業風險管理。
35. 陳櫻琴、陳希佳、黃仲宜,(2010),工程與法律。
36. 萬國法律事務所,(2009),工程法律探索。
37. 監察院,(2017),106教調033號糾正調查報告。
38. 維基百科,(2023),5S (管理),< https://zh.wikipedia.org/
131
參考文獻
zh-tw/5S_(%E7%AE%A1%E7%90%86) >,最後瀏覽日期:2023 年 3 月21日。
39. 維基百科,(2023),A3報告,< https://zh.wikipedia.org/wi ki/A3%E5%A0%B1%E5%91%8A >,最後瀏覽日期:2023年3月21日
。
40. 維基百科,(2023),金融監理沙盒,< https://zh.m.wikipedia
.org/zh-hant/%E9%87%91%E8%9E%8D%E7%9B%A3%E7%90%86%E6%B2 %99%E7%9B%92 >,最後瀏覽日期:2023 年3月21日。
41. 維基百科,(2023),損失規避,< https://zh.wikipedia.org/z h-tw/%E6%8D%9F%E5%A4%B1%E8%A7%84%E9%81%BF >,最後瀏覽日
期:2023年3月21日。
42. 維基百科,(2023),對價,< https://zh.m.wikipedia.org/wik i/%E5%AF%B9%E4%BB%B7 >,最後瀏覽日期:2023年3月21日。
43. 維基百科,(2023),衛武營國家藝術文化中心,< https://zh.m
.wikipedia.org/zh-tw/%E8%A1%9B%E6%AD%A6%E7%87%9F%E5%9C%
8B%E5%AE%B6%E8%97%9D%E8%A1%93%E6%96%87%E5%8C%96%E4%B8%A D%E5%BF%83 >,最後瀏覽日期:2023年 3月21日。
44. 寰瀛法律事務所,(2009),工程法律實務研析(五)-營建工程 契約條款之比較分析。
45. 豐田生產方式研究會,(2013),圖解豐田生產方式。
|