中大機構典藏-NCU Institutional Repository-提供博碩士論文、考古題、期刊論文、研究計畫等下載:Item 987654321/26285
English  |  正體中文  |  简体中文  |  Items with full text/Total items : 78937/78937 (100%)
Visitors : 39613574      Online Users : 283
RC Version 7.0 © Powered By DSPACE, MIT. Enhanced by NTU Library IR team.
Scope Tips:
  • please add "double quotation mark" for query phrases to get precise results
  • please goto advance search for comprehansive author search
  • Adv. Search
    HomeLoginUploadHelpAboutAdminister Goto mobile version


    Please use this identifier to cite or link to this item: http://ir.lib.ncu.edu.tw/handle/987654321/26285


    Title: Short-term work team scheduling models for effective road repair and management
    Authors: Tang,CH;Yan,SY;Chang,CW
    Contributors: 土木工程研究所
    Keywords: ROBUST OPTIMIZATION;STOCHASTIC DEMANDS;UNCERTAINTY;NETWORKS;LOCATION
    Date: 2009
    Issue Date: 2010-06-29 17:09:57 (UTC+8)
    Publisher: 中央大學
    Abstract: In this study, we focus on the development of work team routing/scheduling models incorporating stochastic travel and repair times. Robust and expected optimization concepts, combined with a time-space network technique, are used to develop the models. We perform numerical tests based on operational data for Taoyuan County in Taiwan. The test results show the good performance of the models.
    Relation: TRANSPORTATION PLANNING AND TECHNOLOGY
    Appears in Collections:[Graduate Institute of Civil Engineering] journal & Dissertation

    Files in This Item:

    File Description SizeFormat
    index.html0KbHTML521View/Open


    All items in NCUIR are protected by copyright, with all rights reserved.

    社群 sharing

    ::: Copyright National Central University. | 國立中央大學圖書館版權所有 | 收藏本站 | 設為首頁 | 最佳瀏覽畫面: 1024*768 | 建站日期:8-24-2009 :::
    DSpace Software Copyright © 2002-2004  MIT &  Hewlett-Packard  /   Enhanced by   NTU Library IR team Copyright ©   - 隱私權政策聲明