Repetitive scheduling methods are more effective than traditional critical path methods in the planning and scheduling of repetitive construction projects. Nevertheless, almost all the repetitive scheduling methods developed so far have been based oil the
關聯:
JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT-ASCE