English  |  正體中文  |  简体中文  |  全文筆數/總筆數 : 80990/80990 (100%)
造訪人次 : 41265876      線上人數 : 858
RC Version 7.0 © Powered By DSPACE, MIT. Enhanced by NTU Library IR team.
搜尋範圍 查詢小技巧:
  • 您可在西文檢索詞彙前後加上"雙引號",以獲取較精準的檢索結果
  • 若欲以作者姓名搜尋,建議至進階搜尋限定作者欄位,可獲得較完整資料
  • 進階搜尋


    請使用永久網址來引用或連結此文件: http://ir.lib.ncu.edu.tw/handle/987654321/43589


    題名: 運用資料探勘之關聯法則探討專案執行績效與專案特性之關聯性研究;Exploring relationship between project performance and feature using data mining
    作者: 范銘雄;Ming-Hsiung Fann
    貢獻者: 營建管理研究所碩士在職專班
    關鍵詞: 資料探勘;關聯規則;專案執行績效;工程案例;project performance;project feature;data mining;association
    日期: 2010-07-26
    上傳時間: 2010-12-08 13:49:21 (UTC+8)
    出版者: 國立中央大學
    摘要: 研究論文有以專案成本來探討專案的績效,或是探討人力資源或人力派遣在專案上的最佳化運用,也有專門探討專案總成本的預測等;但少有研究論文直接以工時成本、毛利及總成本來探討專案執行績效;也鮮少有研究論文是以此方式得出的專案執行績效來探討專案特性之間的關聯性。 利用資料探勘技術的概念,並根據所處理問題之特性,選用適當的演算技術,進行智慧型資料分析,尋找大量資料內隱含之邏輯規則與資訊,挖掘出有價值的知識;利用Mircosoft資料採礦軟體之關聯分析演算法作為研究方法。本研究以歷史工程案例作為研究的目標,將每個案例中所預設的欄位名稱如已花工時、預算工時、合約金額、總成本、預算毛利設定為專案輸入參數,結案毛利設定為可預測項目,另以專案代號做為索引條件,將所有的參數的區間分佈情形做一統計,從其中找出有關聯的規則並探討之。 藉由關聯規則輸出,嘗試找出參數間的規則,並與工程案例的毛利值做一分析比較,進而歸類出專案毛利在14%是個明顯的參考指標,也會有因不同性質的專案工程,而會有不同的評價標準;利用此規則來深入探討公共工程類、石化工程類及高科技產業等的專案執行績效分布情形。 In a recessional market, small sized projects become one of main incomes for construction related companies. As known from literature,project feature involving complexity and uniqueness certainly affects project performance. In the view of project profit earned, man-hour spent,and cost accruals, this thesis examines the relationship between project performance and feature using data mining, generating association rules that can be used for practitioners to improve their performance results.Data collection aims at relatively small sized construction projects. A total of 202 projects are collected and as such 81% of their project size is less than NT$10 million. Two-third of the total spent less than 1000 man-hours.Using the Apriori algorithm, numerous association rules are discovered. The major findings conclude that (1) budgeting a small project with less than 14% profit margin has relatively high chances to win a bid; (2) performing relatively small construction projects has 55% chance of experiencing cost overrun; and (3) projects are more controllable if their contract prices are less than NT$8 million.
    顯示於類別:[營建管理研究所碩士在職專班] 博碩士論文

    文件中的檔案:

    檔案 描述 大小格式瀏覽次數
    index.html0KbHTML1216檢視/開啟


    在NCUIR中所有的資料項目都受到原著作權保護.

    社群 sharing

    ::: Copyright National Central University. | 國立中央大學圖書館版權所有 | 收藏本站 | 設為首頁 | 最佳瀏覽畫面: 1024*768 | 建站日期:8-24-2009 :::
    DSpace Software Copyright © 2002-2004  MIT &  Hewlett-Packard  /   Enhanced by   NTU Library IR team Copyright ©   - 隱私權政策聲明