English  |  正體中文  |  简体中文  |  全文筆數/總筆數 : 80990/80990 (100%)
造訪人次 : 41269761      線上人數 : 340
RC Version 7.0 © Powered By DSPACE, MIT. Enhanced by NTU Library IR team.
搜尋範圍 查詢小技巧:
  • 您可在西文檢索詞彙前後加上"雙引號",以獲取較精準的檢索結果
  • 若欲以作者姓名搜尋,建議至進階搜尋限定作者欄位,可獲得較完整資料
  • 進階搜尋


    請使用永久網址來引用或連結此文件: http://ir.lib.ncu.edu.tw/handle/987654321/47446


    題名: 公園巡查人力指派最佳化之探討;An Optimization Model For Park Guard Manpower Assignment
    作者: 陳瑛琺;Ing-fa Chen
    貢獻者: 土木工程學系碩士在職專班
    關鍵詞: 公園巡查;人力指派;最佳化;整數規劃;公平;manpower assignment;optimization;integer programming;fair;park guard
    日期: 2011-06-24
    上傳時間: 2012-01-05 11:14:34 (UTC+8)
    摘要: 臺灣近年來經濟的發展、國民生活水準的提高,對於環境品質的要求不斷提升,公園早已成為民眾最重要的休憩及活動空間,因此公部門對於公園內設施及環境安全性之維持成為民眾滿意度調查指標之一。如何提供優質之休憩空間,必須仰賴巡查人員查報設施損壞、督導環境整潔及維持安全秩序,所以對於巡查勤務之排班上,應兼顧實際需求及公平性,以往公園巡查人力之安排,常以人工經驗方式為之,並非最佳化指派。因此經常令決策者花費大量時間處理及安排,其排班結果亦非最佳化指派。故如何派遣機關公園巡查人員之工作及其公平性之維持,為決策者所面臨的重要課題。 針對上述問題,本研究針對公園管理機關巡查業務,以整數線性規劃為架構,建立一套數學最佳化模式,並利用LINGO 8.0套裝軟體求解出巡查人員最小工作天數與人力指派之組合。由影響最小工作天數參數之敏感度分析,可瞭解本模式因各參數改變對最後運算結果之影響程度。經研究後發現本模式較人工經驗指派方法為優,其成果顯示本研究指派模式之效益佳且兼顧人員指派之公平性,可做為政府機關對於公園管理人力指派實務上之參考。 Economic development in Taiwan has raised the standard of living in recent years, therefore , demand for better environmental quality has rose, and local parks has become one of the most important recreational space for people . The facilities and safety of local parks has become a major indicator for government’s citizen satisfactory survey. Park guards need to patrol and report on the conditions of park facilities , supervise park sanitary and assure safety to maintain high quality of the parks. So work schedules of the park guards need to be arranged in a practical but also equal fashion. The arrangement of park guard which was not an optimistic arrangement was usually made artificially in the pastime. The front office usually takes much time to deal with in the past as well. The most important issue that front office concerns is to keep the manpower arrangement optimistic and fair. We develop an optimistic manpower assignment’s model to resolve the minimum working days of park guard and the combination of manpower assignment according to the study focusing on the sanitary auditing activities for the Park Management Office by utilizing LINGO 8.0 software. The susceptibility of the parameters act on the minimum working days help us to realize that the minimum working days change by the parameters have been setted in this model. After case studying, we find that the manpower assignment model is superior to artificial method. The results reveal that the optimistic model looks after benefit and fairness of manpower assignment. It can be the manpower assignment’s reference of park management officials in practice.
    顯示於類別:[土木工程學系碩士在職專班] 博碩士論文

    文件中的檔案:

    檔案 描述 大小格式瀏覽次數
    index.html0KbHTML731檢視/開啟


    在NCUIR中所有的資料項目都受到原著作權保護.

    社群 sharing

    ::: Copyright National Central University. | 國立中央大學圖書館版權所有 | 收藏本站 | 設為首頁 | 最佳瀏覽畫面: 1024*768 | 建站日期:8-24-2009 :::
    DSpace Software Copyright © 2002-2004  MIT &  Hewlett-Packard  /   Enhanced by   NTU Library IR team Copyright ©   - 隱私權政策聲明