中大機構典藏-NCU Institutional Repository-提供博碩士論文、考古題、期刊論文、研究計畫等下載:Item 987654321/55565
English  |  正體中文  |  简体中文  |  Items with full text/Total items : 80990/80990 (100%)
Visitors : 41268975      Online Users : 288
RC Version 7.0 © Powered By DSPACE, MIT. Enhanced by NTU Library IR team.
Scope Tips:
  • please add "double quotation mark" for query phrases to get precise results
  • please goto advance search for comprehansive author search
  • Adv. Search
    HomeLoginUploadHelpAboutAdminister Goto mobile version


    Please use this identifier to cite or link to this item: http://ir.lib.ncu.edu.tw/handle/987654321/55565


    Title: 橋梁定期檢測路徑規畫之研究;A Study on Route Planning for Regular Bridge Inspection
    Authors: 姚乃嘉
    Contributors: 中央大學營建管理研究所
    Keywords: 土木水利工程類;橋梁定期檢測;路徑規劃;演算模式;檢測期程;檢測時間影響因子;Regular Bridge Inspection;Vehicle Routing;Route Algorithms;Duration ofInspection;Inspection Time Factor
    Date: 2009-09-01
    Issue Date: 2012-10-01 11:25:56 (UTC+8)
    Publisher: 行政院國家科學委員會
    Abstract: 橋梁在其生命週期中,無可避免地會產生結構性或是經常性的損壞,為預防此類問題擴大,橋梁檢測已成為橋梁維護重要之一環。對一橋梁管理單位而言,其轄區內各橋梁之定期檢測須在相關法規限制之期程內完成。為防止檢測期程延遲並提升檢測效率,並考量人力以及成本的限制下,如何在有限之檢測期間內妥善規劃檢測之行程為橋梁維護之重要課題。本研究期望建構一套橋梁定期檢測路徑規劃演算模式,除考量每座橋梁不同之檢測時間外,同時採用多路線(多組檢測人員)、多出發點(不同之夜間休息點)之設計,以符合定期檢測實務之情況,並達成定期檢測時間最短之目標。本研究預期完成之成果包含(1)篩選影響檢測橋梁時間之因子,(2)正確評估各座橋梁之檢測時間,(3)建構橋梁定期檢測路徑規劃演算模式,以及(4)建立『臺灣地區橋梁管理系統』中橋梁定期檢測路徑規劃功能。藉由此橋梁定期檢測路徑規劃演算模式之建立,橋梁檢測單位可縮短檢測期程,提升定期檢測之效率,並可依本模式建立之檢測路徑規劃結果,進行檢測進度之控管。 ; Bridges are aging and inevitably subject to structural or periodical damages in their service life. Inspection of bridge to prevent severe damages in advance is an important task in bridge maintenance. For a bridge management agency, there are regulations that limit the agency, within certain amount of time, to complete the inspection for all of its bridges. Thus, it has become a crucial issue to produce a satisfactory bridge inspection plan within limited budget and time. This research aims at establishing a model for generating an optimal inspection plan based on multi-route (crews) and multi-starting-points (rest-area for the nights). The expected results of this research are (1) identification of factors that affect a bridge’s inspection time; (2) evaluation of the reasonable inspection time of a bridge; (3) establishment of the model; and (4) incorporation of the model into the “Taiwan Bridge Management System.” The established model is expected to improve the efficiency as well as the performance of bridge inspection. ; 研究期間 9808 ~ 9907
    Relation: 財團法人國家實驗研究院科技政策研究與資訊中心
    Appears in Collections:[Graduate Institute of construction engineering] Research Project

    Files in This Item:

    File Description SizeFormat
    index.html0KbHTML397View/Open


    All items in NCUIR are protected by copyright, with all rights reserved.

    社群 sharing

    ::: Copyright National Central University. | 國立中央大學圖書館版權所有 | 收藏本站 | 設為首頁 | 最佳瀏覽畫面: 1024*768 | 建站日期:8-24-2009 :::
    DSpace Software Copyright © 2002-2004  MIT &  Hewlett-Packard  /   Enhanced by   NTU Library IR team Copyright ©   - 隱私權政策聲明