English  |  正體中文  |  简体中文  |  Items with full text/Total items : 80990/80990 (100%)
Visitors : 40252719      Online Users : 376
RC Version 7.0 © Powered By DSPACE, MIT. Enhanced by NTU Library IR team.
Scope Tips:
  • please add "double quotation mark" for query phrases to get precise results
  • please goto advance search for comprehansive author search
  • Adv. Search
    HomeLoginUploadHelpAboutAdminister Goto mobile version
    Research Project [96/96]
    journal & Dissertation [77/77]
    retired tests [176/176]

    Collection Statistics

    Item counts issued in 3 years: 89(11.71%)
    Items With Fulltext: 760(100.00%)

    Download counts of the item
    Download times greater than 0: 760(100.00%)
    Download times greater than 100: 651(85.66%)
    Total Bitstream Download Counts: 424072(73.25%)

    Last Update: 2024-10-20 08:14


    Top Upload

    Loading...

    Top Download

    Loading...

    RSS Feed RSS Feed
    Jump to a point in the index:
    Or type in a year:
    Ordering With Most Recent First Show Oldest First

    Showing items 191-200 of 760. (76 Page(s) Totally)
    << < 15 16 17 18 19 20 21 22 23 24 > >>
    View [10|25|50] records per page

    DateTitleAuthors
    2018-08-22 批量機台具合適度限制及等候時間限制求最小化總完工時間之生產排程問題;The Parallel Batch Machine Scheduling with Machine Eligibility and Waiting Time Constraints to Minimize Total Completion Time 黃逸華; Huang, Yi-Hua
    2018-08-15 產品替代性與互補性下之Category Captainship;Category Captainship under product substitution and complementarity 邱歆茹; Chiu, Hsin-Ju
    2018-08-10 近似求解平行機台具機器預防性維修、機器合適度及與工作相關之設置時間限制求最小化總完工時間的排程問題;Approximation of a Parallel Machine Scheduling Problem with the Consideration of Preventive Maintenance, Machine Eligibility and Sequence-Dependent Setup Times to Minimize the Total Completion Time 黃覺慧; Huang, Chueh-Hui
    2018-08-10 近似求解機台可用區間限制求最小化總完工時間之平行機台排程問題;Approximation of Identical Parallel Machine Scheduling with Machine Availability Constraint to Minimize Total Completion Time 林志佳; Lin, Chih-Chia
    2018-07-25 TFT-LCD廠之自動化搬運系統的多屬性派送控制方法 張軒銘; Chang, Hsuan-Ming
    2018-07-25 以電動車電氣化運籌產業;ELECTRIFICATION OF LOGISTIC INDUSTRIES WITH ELECTRIC VEHICLES 陳氏姮妮; Ni, Tran Thi Hang
    2018-07-25 以模糊理論為基礎之TFT-LCD廠的AMHS派送控制研究 許智翔; Hsu, Chih-Hsiang
    2018-07-25 彈性製造系統之具雙向路徑軌道的梯形機器佈置 許云瑄; Hsu, Yun Hsuan
    2018-07-25 整合魚菜共生與太陽能光電系統;Integration of Aquaponics and Solar Photovoltaic Systems 郭珮禎; Guo, Pei-Zhen
    2018-07-24 光電埤塘提供民生用電之最佳規劃;Optimal Planning of Floating Photovoltaic Systems on the Pond for Household Electricity Demand 徐佳玉; Chia-Yu, Hsu

    Showing items 191-200 of 760. (76 Page(s) Totally)
    << < 15 16 17 18 19 20 21 22 23 24 > >>
    View [10|25|50] records per page

    ::: Copyright National Central University. | 國立中央大學圖書館版權所有 | 收藏本站 | 設為首頁 | 最佳瀏覽畫面: 1024*768 | 建站日期:8-24-2009 :::
    DSpace Software Copyright © 2002-2004  MIT &  Hewlett-Packard  /   Enhanced by   NTU Library IR team Copyright ©   - 隱私權政策聲明