中大機構典藏-NCU Institutional Repository-提供博碩士論文、考古題、期刊論文、研究計畫等下載:Item 987654321/62190
English  |  正體中文  |  简体中文  |  Items with full text/Total items : 80990/80990 (100%)
Visitors : 41247922      Online Users : 52
RC Version 7.0 © Powered By DSPACE, MIT. Enhanced by NTU Library IR team.
Scope Tips:
  • please add "double quotation mark" for query phrases to get precise results
  • please goto advance search for comprehansive author search
  • Adv. Search
    HomeLoginUploadHelpAboutAdminister Goto mobile version


    Please use this identifier to cite or link to this item: http://ir.lib.ncu.edu.tw/handle/987654321/62190


    Title: 供應商最佳補貨水準控管策略與補貨配送排程規劃之研究;Optimal Inventory Level Control Strategies and Replenishment Delivery Schedules for Suppliers
    Authors: 顏上堯
    Contributors: 國立中央大學土木工程學系
    Keywords: 土木水利工程
    Date: 2012-12-01
    Issue Date: 2014-03-17 11:19:07 (UTC+8)
    Publisher: 行政院國家科學委員會
    Abstract: 研究期間:10108~10207;Faced with rapid changes and a competitive environment, in order for enterprises to maintain their competitiveness, they must ensure a stable supply of products to satisfy fluctuations in market demand. If a good replenishment strategy is built with the Vendor Management Inventory (VMI), it will not only lead to efficient inventory management, but will also reduce the overall system cost and increase operation efficiency. In practice, inventory management is carried out with related computer-aided inventory management software. However, the inventory level is controlled manually by experienced planning personnel. Consequently, the planning results may not reflect overall optimality. Many studies related to inventory management problems have been carried out in the past, involving a wide range of applications. VMI problems have also been discussed in literature. However, to simplify the studied problems, a suitable inventory level is generally set up in advance. Consequently, the proposed models or methods cannot use the overall resources effectively without system optimization. Besides, in the past fixed average travel times have been utilized with regard to the vehicle routing problem, meaning that stochastic disturbances arising from variations in vehicle travel times in actual operations were neglected. In the worst case scenario, where vehicle travel times fluctuate wildly during daily operations, the original planned schedule could be disturbed enough to lose its optimality. Therefore, in this study, based on the system optimization perspective, we develop a deterministic-demand upper-and-lower inventory level control model, a stochastic-demand upper-and-lower inventory level control model, and a daily vehicle delivery scheduling model under stochastic travel times, with the objective of minimizing the total cost. The models are expected to be useful tools for the planner to decide on an optimal upper-and-lower inventory level and a vehicle delivery schedule. After a preliminary evaluation, the scope of this research is expected to be large, so we propose a three-year project. In the first year, we will construct a deterministic-demand upper-and-lower inventory level control model for one supplier to many retailers, considering deterministic daily demands. In the second year, we will construct a stochastic-demand upper-and-lower inventory level control model for one supplier to many retailers, considering stochastic daily demands. In the third year, we will construct a daily vehicle delivery scheduling model under stochastic travel times for one supplier to many retailers. We will employ the mathematical programming and network flow techniques to develop all the models with suitable objective functions and constraints based on the problem characteristics to comply with real operating requirements. All the models are expected to be formulated as integer network flow problems with side constraints or integer multiple commodity network flow problems, which are characterized as NP-hard so cannot be optimally solved within a reasonable time for large-scale problems. To efficiently solve the realistically large problems that occur in practice, we will develop a solution algorithm for each model by adopting a problem decomposition strategy, coupled with the use of the CPLEX software. Finally, to evaluate the models and the solution algorithms in practice, we will perform case studies and sensitivity analyses. Conclusions and suggestions will then be given.
    Relation: 財團法人國家實驗研究院科技政策研究與資訊中心
    Appears in Collections:[Department of Civil Engineering] Research Project

    Files in This Item:

    File Description SizeFormat
    index.html0KbHTML283View/Open


    All items in NCUIR are protected by copyright, with all rights reserved.

    社群 sharing

    ::: Copyright National Central University. | 國立中央大學圖書館版權所有 | 收藏本站 | 設為首頁 | 最佳瀏覽畫面: 1024*768 | 建站日期:8-24-2009 :::
    DSpace Software Copyright © 2002-2004  MIT &  Hewlett-Packard  /   Enhanced by   NTU Library IR team Copyright ©   - 隱私權政策聲明