中大機構典藏-NCU Institutional Repository-提供博碩士論文、考古題、期刊論文、研究計畫等下載:Item 987654321/63327
English  |  正體中文  |  简体中文  |  Items with full text/Total items : 80990/80990 (100%)
Visitors : 41268616      Online Users : 197
RC Version 7.0 © Powered By DSPACE, MIT. Enhanced by NTU Library IR team.
Scope Tips:
  • please add "double quotation mark" for query phrases to get precise results
  • please goto advance search for comprehansive author search
  • Adv. Search
    HomeLoginUploadHelpAboutAdminister Goto mobile version


    Please use this identifier to cite or link to this item: http://ir.lib.ncu.edu.tw/handle/987654321/63327


    Title: 考量浮時消耗之時程延遲分析方法之建立;Developing a Schedule Delay Analysis Method with Considering Float Consuming
    Authors: 楊智斌
    Contributors: 國立中央大學營建管理研究所
    Keywords: 土木水利工程
    Date: 2012-12-01
    Issue Date: 2014-03-17 14:27:16 (UTC+8)
    Publisher: 行政院國家科學委員會
    Abstract: 研究期間:10108~10207;Schedule delays commonly appear in construction projects and result in schedule delay claims progressively. The resolutions provided by available schedue delay analysis methods for most schedule delay claims usually cannot satisfy both of the contract parties. The main causes of above circumstances are that the responsibilities of most schedule delays are hard to identify, and the calculation results of available delay analysis methods are unacceptable to contract parties. Several studies have proposed various schedule delay analysis methods. Most of them still have rooms to improve their capabilities in solving real delay situations. This three-year research project targets to develop an innovative schedule delay analysis method based on previous research outcomes. The proposed innovative method tries to integrate the concepts of well-accepted critical path method and float consuming. Considering the practicability of the proposed method, this research project will incorporate developed methodology into commercial scheduling software to develop a schedule delay analysis system. In sum, this research project aims to develop a schedule delay analysis method with system that considers float consuming in delay analysis. In the future, the problems of schedule delays will be solved with satisfied analytical results by the proposed innovative method.
    Relation: 財團法人國家實驗研究院科技政策研究與資訊中心
    Appears in Collections:[Graduate Institute of construction engineering] Research Project

    Files in This Item:

    File Description SizeFormat
    index.html0KbHTML423View/Open


    All items in NCUIR are protected by copyright, with all rights reserved.

    社群 sharing

    ::: Copyright National Central University. | 國立中央大學圖書館版權所有 | 收藏本站 | 設為首頁 | 最佳瀏覽畫面: 1024*768 | 建站日期:8-24-2009 :::
    DSpace Software Copyright © 2002-2004  MIT &  Hewlett-Packard  /   Enhanced by   NTU Library IR team Copyright ©   - 隱私權政策聲明