中大機構典藏-NCU Institutional Repository-提供博碩士論文、考古題、期刊論文、研究計畫等下載:Item 987654321/66127
English  |  正體中文  |  简体中文  |  Items with full text/Total items : 80990/80990 (100%)
Visitors : 41267944      Online Users : 207
RC Version 7.0 © Powered By DSPACE, MIT. Enhanced by NTU Library IR team.
Scope Tips:
  • please add "double quotation mark" for query phrases to get precise results
  • please goto advance search for comprehansive author search
  • Adv. Search
    HomeLoginUploadHelpAboutAdminister Goto mobile version


    Please use this identifier to cite or link to this item: http://ir.lib.ncu.edu.tw/handle/987654321/66127


    Title: 以BIM模型為基礎之專案排程項次分析;Analyzing scheduling activities based on BIM models
    Authors: 李鎧帆;Li,Kai-Fan
    Contributors: 營建管理研究所
    Keywords: 建築資訊模型;BIM;4D模擬;時程項次;Building Information Modeling;BIM;4D Simulation;Schedulind Activities
    Date: 2014-10-22
    Issue Date: 2014-11-24 15:47:26 (UTC+8)
    Publisher: 國立中央大學
    Abstract: 近年來建築資訊模型(BIM)在營建產業中日漸受到重視,而除了傳統3D模型交付外,以3D模型搭配完整時程交付並不普遍。國內應用BIM技術時,4D應用之現況通常僅以3D模型及簡易時程項次連結產生,但對於時程項次與內容之要求並無任何規則及說明。本研究主要目的為,透過國內目前在BIM模型建立上普遍採用的LOD發展程度為基礎,分析當專案需進行4D模擬時,時程應有之工作項目、項目分類、項目連結元件等內容,並利用一建築案例測試其合適性。研究結果顯示,若要以BIM模型為基礎進行完整的4D模擬,國內傳統的排程項次之安排需要進行大幅度的調整。;Recently Building Information Modeling (BIM) technology has been recognized as an essential tool for improving construction productivity in the construction industry. Excluding delivering pure 3D models, there is a few projects to delivery 3D models with complete project schedules. In Taiwan, to implement BIM for constructing 4D models, the practionner usually integrates 3D models with simple scheduling activities. Notably, there are no clear rules and specifications for scheduling activities for constructing 4D models. Based on general accepted Level of Development (LOD) concept, this study proposes an approach to analyze the necessary activities, activity types and linking models for constructing 4D models, and then examines the approach by developing 4D models for a house. This study concludes that it is necessary to modify existed schedule activities for constructing 4D models.
    Appears in Collections:[Graduate Institute of construction engineering] Electronic Thesis & Dissertation

    Files in This Item:

    File Description SizeFormat
    index.html0KbHTML593View/Open


    All items in NCUIR are protected by copyright, with all rights reserved.

    社群 sharing

    ::: Copyright National Central University. | 國立中央大學圖書館版權所有 | 收藏本站 | 設為首頁 | 最佳瀏覽畫面: 1024*768 | 建站日期:8-24-2009 :::
    DSpace Software Copyright © 2002-2004  MIT &  Hewlett-Packard  /   Enhanced by   NTU Library IR team Copyright ©   - 隱私權政策聲明