中大機構典藏-NCU Institutional Repository-提供博碩士論文、考古題、期刊論文、研究計畫等下載:Item 987654321/82687
English  |  正體中文  |  简体中文  |  全文筆數/總筆數 : 80990/80990 (100%)
造訪人次 : 41270405      線上人數 : 429
RC Version 7.0 © Powered By DSPACE, MIT. Enhanced by NTU Library IR team.
搜尋範圍 查詢小技巧:
  • 您可在西文檢索詞彙前後加上"雙引號",以獲取較精準的檢索結果
  • 若欲以作者姓名搜尋,建議至進階搜尋限定作者欄位,可獲得較完整資料
  • 進階搜尋


    請使用永久網址來引用或連結此文件: http://ir.lib.ncu.edu.tw/handle/987654321/82687


    題名: 數位視訊錄影軟體開發專案排程最佳化之研究
    作者: 謝宗勳;HSIEH, TSUNG-HSUN
    貢獻者: 土木工程學系在職專班
    關鍵詞: 專案排程;資源配置;最佳化;整數規劃;project scheduling;resource allocation;optimization;integer programing
    日期: 2020-01-06
    上傳時間: 2020-06-05 16:29:09 (UTC+8)
    出版者: 國立中央大學
    摘要: 專案在推動之初,除了明確的工作範疇外,專案管理人員與利害關係人最在意的不外乎是專案執行所需的工期、資源與成本。然而在眾多變因交叉影響下,使用傳統方法進行專案排程與資源配置時,常遭遇花費大量時間規劃,卻總難面面俱到的窘境。
    本研究係考量專案排程中工期限制、工作項目、資源配置與薪資成本等要素,建構出相應的整數規劃模型,再導入專業電腦軟體並搭配一般個人電腦進行運算,即可在短時間獲得比一般專案排程方法更精確的成果。為確認本研究數學規劃模式的有效性與運行效能,本研究以某科技公司規劃數位視訊錄影(DVR - Digital Video Recorder)軟體開發專案為測試範例並導入前述數學模式進行兩階段求解,並與人工經驗排程方式進行比較,無論是求解時間與最終求解結果,本研究範例測試求解方式皆較人工經驗排程方式為佳。另外,本研究亦因應專案利害關係人所重視的成本、時間、與專案投入人力等進行敏感度與方案分析,其結果除可協助決策過程進行外,亦有利於專案排程之進行。
    ;In the initial stages of a project, apart from defining a clear project scope, project managers and stakeholders care most about the project duration, resources, and costs. However, conventional methods of project scheduling and resource allocation often fail to consider the cross impact of numerous variables, despite considerable amounts of time being spent on planning.
    This study created an integer programming model that considers duration limits, work items, resource allocation, remuneration and costs, and other complex factors. This model was then run on general PCs using professional computer software programs to achieve more accurate results in less time than ordinary project scheduling. To validate the feasibility of the proposed mathematical programming model, the digital video recording software development project of a technology company was used as a test case and a two-stage solution was deployed using a proposed model. The results were then compared with those for manual experience–based scheduling. In terms of solution effectiveness and efficiency, this study demonstrated that the solution of test case outperformed that of manual experience–based scheduling. In addition, sensitivity and solution analyses were conducted for project costs, time, and labor resources—factors that are crucial to project stakeholders. The analysis results can assist in the planning process and can facilitate project scheduling.
    顯示於類別:[土木工程學系碩士在職專班] 博碩士論文

    文件中的檔案:

    檔案 描述 大小格式瀏覽次數
    index.html0KbHTML122檢視/開啟


    在NCUIR中所有的資料項目都受到原著作權保護.

    社群 sharing

    ::: Copyright National Central University. | 國立中央大學圖書館版權所有 | 收藏本站 | 設為首頁 | 最佳瀏覽畫面: 1024*768 | 建站日期:8-24-2009 :::
    DSpace Software Copyright © 2002-2004  MIT &  Hewlett-Packard  /   Enhanced by   NTU Library IR team Copyright ©   - 隱私權政策聲明