English
| 正體中文 |
简体中文
|
Items with full text/Total items : 69937/69937 (100%)
Visitors : 23023663 Online Users : 519
RC Version 7.0 © Powered By DSPACE, MIT. Enhanced by
NTU Library IR team.
Scope
All of NCUIR
地球科學學院
客家學院
工學院
文學院
理學院
生醫理工學院
研究中心
管理學院
總教學中心委員會
行政單位
資訊電機學院
Tips:
please add "double quotation mark" for query phrases to get precise results
please goto advance search for comprehansive author search
Adv. Search
Home
‧
Login
‧
Upload
‧
Help
‧
About
‧
Administer
NCU Institutional Repository
>
Items for Author
Loading...
Category
Loading community tree, please wait....
Year
Loading year class tree, please wait....
Items for Author "Sheen,Gwo-Ji"
Return to Browse by Author
Showing 10 items.
Collection
Date
Title
Authors
Bitstream
[工業管理研究所 ] 期刊論文
2008
Dynamic pricing, promotion and replenishment policies for a deteriorating item under permissible delay in payments
Tsao,Yu-Chung
;
Sheen,Gwo-Ji
[工業管理研究所 ] 期刊論文
2008
Optimal parallel machines scheduling with machine availability and eligibility constraints
Sheen,Gwo-Ji
;
Liao,Lu-Wen
;
Lin,Cheng-Feng
[工業管理研究所 ] 期刊論文
2008
Parallel machine scheduling with machine availability and eligibility constraints
Liao,Lu-Wen
;
Sheen,Gwo-Ji
[工業管理研究所 ] 期刊論文
2008
Simultaneous determination of view selection and update policy with stochastic query and response time constraints
Liu,Yu-Chin
;
Hsu,Ping-Yu
;
Sheen,Gwo-Ji
;
Ku,Steve
;
Chang,Kai-Wen
[工業管理研究所 ] 期刊論文
2007
A branch and bound algorithm for the one-machine scheduling problem,with minimum and maximum time lags
Sheen,Gwo-Ji
;
Liao,Lu-Wen
[工業管理研究所 ] 期刊論文
2007
A fuzzy-based decision-making procedure for data warehouse system selection
Lin,Hua-Yang
;
Hsu,Ping-Yu
;
Sheen,Gwo-Ji
[工業管理研究所 ] 期刊論文
2007
Channel coordination, trade credit and quantity discounts for freight cost
Sheen,Gwo-Ji
;
Tsao,Yu-Chung
[工業管理研究所 ] 期刊論文
2007
Joint pricing and replenishment decisions for deteriorating items with lot-size and time-dependent purchasing cost under credit period
Tsao,Yu-Chung
;
Sheen,Gwo-Ji
[工業管理研究所 ] 期刊論文
2007
Scheduling machine-dependent jobs to minimize lateness on machines with identical speed under availability constraints
Sheen,Gwo-Ji
;
Liao,Lu-Wen
[工業管理研究所 ] 期刊論文
2007
Single-machine scheduling with multiple performance measures: Minimizing job-dependent earliness and tardiness subject to the number of tardy jobs
Chen,Wei-Yang
;
Sheen,Gwo-Ji
::: Copyright National Central University. | 國立中央大學圖書館版權所有 |
收藏本站
|
設為首頁
| 最佳瀏覽畫面: 1024*768 | 建站日期:8-24-2009 :::
DSpace Software
Copyright © 2002-2004
MIT
&
Hewlett-Packard
/
Enhanced by
NTU Library IR team
Copyright ©
-
Feedback
-
隱私權政策聲明