The quality of the Construction Planning and Designing affects the effectiveness of the complete life cycle, the currently implemented quality control system of public works and engineering, the quality management during the construction phase is under the inspection of Construction Quality Management and Construction three-level Quality Management mechanism. The work of Planning and Designing has significant influence and profound impact on the follow-up operation and maintenance of the Construction, thus, a complete procedure must be present in the planning and designing phase. This will not only provide a better proposal, but also avoid irrelevant planning and designing of the construction.
This study collected relevant literature review from both domestic and international papers as well as the current data analysis, The discussion and compilation of the study of the related performance evaluation system was conducted in accordance with the performance evaluation system of the domestic public sector construction agency, public works and engineering golden triad award, recent relevant researches, as well as thesis and international performance evaluation methods and reference documents, and work in co-operation with the recent practice of sustainable public works target set by the government. With the help of questionnaire, cooperation with sustainable public works - carbon reduction strategy white paper, relevant laws and regulations, ecological engineering, the concept of the complete life cycle of quality management, and through interview with professionals, attempt to establish an evaluation index of technical service planning and designing phase. The weight was set by applying the AHP level analysis method, and together with the Delphi expert interviews, the items of evaluation index were determined, a total of 23 items. Finally, four public works were selected to make a trial evaluation comparative analysis to verify, the evaluation results are consistent with the firm’s actual execution, thus verifying the accuracy of this study’s result.
The evaluation index established in this study can evaluate the service quality of the planning and designing phase of technical service, and at the same time, can implement sustainable public work index, reduce unnecessary change in design and disputes during the construction phase, and moreover, with consideration of quality, progress and cost, successfully complete the construction of public works.
|
參考文獻 |
【1】 孫千惠,「工程主辦機關對設計服務廠商之評鑑機制-以臺北捷運工程局為例」,國立中央大學土木工程研究所碩士論文,2008。
【2】 永續公共工程入口網,網址:http://eem.pcc.gov.tw/eem/。
【3】 黃于玻,「立基於生命週期分析之永續工程全觀視野」,永續公共工程入口網入門篇,2008。
【4】 徐貞益,「政府採購法規概要簡介」,2009年工地主任班課程教材簡報,2009。
【5】 楊政賢,「工程機關辦理大型工程設計審查要項及機制研究」,國立中央大學營建管理研究所碩士論文,2009。
【6】 黃瑞忠,「應用模糊層級分析法建構醫院醫療合作外包廠商評選模式」,朝陽科技大學工業工程與管理系碩士論文,2009。
【7】 林佳瑩,「設計中工程與人文等議題整合機制之建立」,國立成功大學土木工程研究所論文,2009。
【8】 蔡坤龍,「建築工程設計品質管理之研究」,國立臺灣科技大學營建工程研究所碩士論文,2008。
【9】 張裕滿,「公共工程規劃設計品質管理缺失分析與改善策略之研究」,中華大學/營建管理研究所碩士論文,2008。
【10】 楊博宇,「農水路生態工程效益評估及規劃設計之研究」,臺灣大學生物環境系統工程學研究所碩士論文,2007。
【11】 楊宗哲,「營造廠商經營體質提昇策略-以營造業評鑑為例」,國立中央大學土木工程研究所碩士論文,2007 。
【12】 詹紹華,「公共工程規劃設計階段成本及進度管理問題之研究」,交通大學土木工程學系碩士論文,2006 。
【13】 黃書禮、李玲玲、駱尚廉等,「建立永續臺灣評量指標系統實際應用之研究」,2003。
【14】 曾俊達、龔清志,「生態工法招標及驗收之研究」,成功大學建築研究所,2003。
【15】 鍾金龍、曾惠斌,「公共工程規劃設計之品質評審指標及金質獎評審機制檢討」,行政院公共工程委員會,萬鼎工程服務股份有限公司,2004。
【16】 張行道,「工程技術顧問公司評鑑及獎勵機制之研究」,行政院公共工程委員會,財團法人成大研究發展基金會,2004。
【17】 林正平、林金德,「生態工法招標及驗收之研究」,行政院公共工程委員會,國立台北科技大學土木與防災研究所,2004。
【18】 黃榮堯、周南山、林文雄等,「建立永續公共工程指標系統之研究」,行政院公共工程委員會,國立中央大學營建管理研究所,2008。
【19】 Federation Internationale Des Ingenieurs-Conseils (FIDIC), “Guidelines for the Evaluation of Consultants'Performance." 2001.
【20】 Department of the Environment, Transport and the Regions, “KPI Report for the Minister for the Construction,” Eland House Bressenden Place London UK, 2001.
【21】 DM Gann, AJ Salter, JK Whyte, ”Design Quality Indicator as a tool for thinking”, Building Research and Information, Vol. 31, No. 5, pp. 318-333, 2003.
【22】 E Gibson, R Gebken, “Design quality in pre-project planning: applications of the Project Definition Rating Index”, Building Research and Information, Vol. 31, No. 5, pp. 346-356, 2003.
【23】 USGBC: LEED, http://www.usgbc.org/DisplayPage.aspx?CategoryID=19
【24】 Wikipedia, http://zh.wikipedia.org/zh-tw/美國綠建築協會
【25】 The Green Globes system, http://www.greenglobes.com/
【26】 NABERS, http://www.nabers.com.au/faqs.aspx
【27】 Welcome to Green Building Council of Australia, http://www.gbca.org.au/
【28】 国土交通省官庁營繕部,「官庁施設の設計の品質確保のための業務管理手法の開発」,平成18 年。
【29】 日本可持續建築協會,「建築物綜合環境性能評價體系—綠色設計工具 = Comprehensive assessment system for building environmental efficiency」,中國建築工業出版社,2005。
【30】 中華人民共和國國家計畫委員會,「工程諮詢成果質量評價辦法」,2000。
【31】 Cai, Y. X. “Quality Assurance of Structural Engineering Design”, Journal of Management in Engineering ASCE, 2006.
【32】 Tang, S. L., Lu, M. and Chan, Y. L. “Achieving Client Satisfaction 92 for Engineering Consulting Firms”, Journal of Management in Engineering ASCE, 2003.
【33】 Toufic, M., Abdul-Malak, M. A., Ibrahim, G. and Maher, A. “Knowledge Management in Mechanical and Industrial Engineering Consulting:A Case Study”, Journal of Management in Engineering ASCE, 2005.
【34】 Andia and Takayuki, M. “Design Documents Quality in the Japanese Construction Industry : Factors Influencing and Impacts on Construction Process”, International Journal of Project Management, 2003.
【35】 Chao, L.P., Tumer, I. and Ishii, K. “Design Process Error-Proofing: Engineering Peer Review Lessons From NASA”, Proceedings of the ASME Design Engineering Technical Conference, Vol.3, 2004.
【36】 Liu, X., Wang, Y. and Jiang, S. “A Metrics Based Task Analysis Model for Design Review Planning”, Design Studies, Vol.24, No.4, 2003.
【37】 Jeffrey, G. K., and Gonzalo, P. “Improved Design Review through Web Collaboration”, Journal of Management in Engineering, 2004.
【38】 Lucio, S., Liang, Y. L., Jeffrey, G. K., E. William, E. and Carlos, H. C.、Ken-Yu, L. “Design Review Checking System with Corporate Lessons Learned”, ournal of Construction Engineering and Management, Vol.129, 2003.
【39】 鄧振源,「計畫評估-方法與應用」,華梵大學運籌管理暨決策分析研究室,2003。
【40】 The Delphi Method, http://www.is.njit.edu/pubs/delphibook/
【41】 MBA Lib, http://wiki.mbalib.com/wiki/德尔菲法
【42】 行政院經濟建設委員,網址:http://www.cepd.gov.tw/
【43】 International Standard, “ISO-9001:Quality Systems models for Quality Assurance in Design/Development, Production, Installation and Servicing”, International Organization For Standardization, Switzerland, 1994.
【44】 國家永續發展委員會全球資訊網,http://sta.epa.gov.tw/nsdn/
【45】 行政院國家永續發展委員會,「九十八年國家永續發展獎選拔表揚要點」,2009。
【46】 行政院公共工程委員會,「公共工程金質獎頒發作業要點」,2001 年5 月發布,2007 年4 月修訂。
【47】 台灣綠建築發展協,網址:http://www.taiwangbc.org.tw/chinese/about.php
【48】 黃金田、林志棟等,「公共工程全生週期品質管理整體架構之研訂 」,行政院公共工程委員會,中央大學土木系,2009。
【49】 行政院公共工程委員會全球資訊網,http://www.pcc.gov.tw/pccap2/TMPLfronted/ChtIndex.do?site=002
【50】 王國武、謝定亞、陳愛娥等,「第一議題:健全工程執行環境」,全國公共工程會議,行政院公共工程委員會,2009。
【51】 李建中、周南山、李咸亨等,「第二議題:提升工程執行效益之策略」,全國公共工程會議,行政院公共工程委員會,2009。
【52】 趙正義、沈景鵬、王明德等,「第三議題:鼓勵民間參與公共建設」,全國公共工程會議,行政院公共工程委員會,2009。
【53】 陳體宏,「公共工程統包商之經營管理策略—以大型工程顧問公司為例」,中央大學土木工程系,2009。
【54】 黃英,「統包模式之工程進度及品質管理」,行政院公共工程委員會研究,2005。
【55】 陳正鈞,「專案管理」,品管工程師回訓班,行政院公共工程委員會,2008。
【56】 朱登子,「BOT專案進度與品質管理參考手冊」,品管工程師回訓班,行政院公共工程委員會,2009。
【57】 陳彥璋、梁文盛等,「建立生態工程案件檢核評估作業之研究」,行政院公共工程委員會委託研究,台北科技大學水環境研究中心,2006。
【58】 彭國棟,「生態社區之營造-從理論到實踐」,新故鄉文教基金會,網址:http://www.homeland.org.tw/
【59】 內政部營建署,「規劃設計廠商評分表」,臺北,2006。
【60】 交通部臺灣區國道興建工程局,「技術顧問機構執行績效評鑑要點」系統品質程序書第三版,2003。
【61】 臺北市政府,「臺北市政府技術服務履約績效管理要點」,2008年2 月發布。
【62】 行政院公共工程委員會,「公共工程金質獎頒發作業要點」,2001 年5 月發布,2007 年4 月修訂。
【63】 臺南縣政府,「臺南縣政府公共工程技術服務廠商評鑑作業要點」,2004年12月9日府採審字第0930239769號函發布,2005年7月20日府採品字第0940155524號函修訂。
|