參考文獻 |
[1]AIAG (2008), AIAG Manual, 810-358-3003, http://elsmar.com/APQP/.
[2]Anderson, D. O. (1998), “Product Realization Process (PRP),” Louisiana TechUniversity, Article , http://web.archive.org/web/20030404093913/ www2.latech.edu/~dalea/instruction/prp.html.
[3]Automotive Industry Action Group, (2003), “ISO/TS 16949:2002 Implementation Guide,” 1st ed.
[4]Bosch Group (2005), “Bosch Supplier Development Handbuch,” Version 1.0. 28.
[5]Brewer, J. C. (2002), “Better Launches Begin at Estimating,” in Automotive Industries, Vol. 182, pp. 34-36.
[6]Carbone, T. A. and Tippett, D. D. (2004), “The Front End of Product Development in The Electronics Industry:A Research Proposal,” presented at Proceedings of the American Society for Engineering Management.
[7]Chrysler D. and Ford, G. M. (1995), “Advanced Product Quality Planning & Control Plan,” 1st ed, AIAG.
[8]Chrysler D. and Ford, G. M. (2001), “Potential Failure Mode and Effects Analysis,” 3rd ed, AIAG.
[9]Chrysler D. and Ford, G. M. (2003), “Measurement System Analysis,” 3rd ed, AIAG.
[10]Chrysler D. and Ford, G. M. (2005), “Statistical Process Control,” 2nd ed, AIAG.
[11]Chrysler, D. and Ford, G. M. (2006), “Production Part Approval Process,” 4th ed, AIAG.
[12]Cooper, R. G. (1994), “Perspective: Third-generation New Product Processes,” Journal of Product Innovation Management, Vol. 11, pp. 3-14.
[13]Crows, K. (2007), “New Product Development Solutions, DRM Associates,” www.npd-solutions.com/pdmetrics.html.
[14]Elgh, F. (2004), “A Generic Framework for Automated Cost Evaluation of Product Variants and Fabrication Plants,” Proceedings of ASME Design Engineering Technical Conferences and Computers and Information in Engineering Conference (DETC2004), American Society of Mechanical Engineering, New York.
[15]Elgh, F., and Cederfeldt, M. (2006), “Reducibility Awareness as a Base for Design Automation Development – Analysis and Synthesis Approach to Cost Estimation,” 13th ISPE International Conference on Concurrent Engineering: Research and Applications (CE2006), Antibes.
[16]Elgh, F. (2007), “Computer-supported Design for Productivity: Principles and Models for System Realization and Utilization,” Chalmers University of Technology, Gothenburg, Ph.D. Thesis.
[17]Harlou, U. (2005), “Developing Product Families Base on Architectures – Contribution to a Theory of Product Families,” Technical University of Denmark, Lyngby, Ph.D. Thesis.
[18]Handfield, B. R. et al. (1999), “Involving Suppliers in New Product Development,” California Management Review, Vol. 42, No. 4, pp.59-82.
[19]Hewlett-Packard Development Company (2004), “L.P. HP Product Lifecycle Management (PLM) Strategy,” White paper.
[20]Jayaram, J. and Narasimhan R. (2007), “The Influence of New Product Development Competitive Capabilities on Project Performance,” IEEE Transactions on Engineering Management, Vol. 54, No. 2, pp. 241, 243.
[21]Juran, J. M. (1992), “Juran on Quality by Design: The New Steps for Planning Quality into Goods and Services,” New York, THE FREE PRESS, pp. 200-205.
[22]Lynn, G. S., Reilly, R. R. and Akgun, A. E. (2000), “Knowledge Management in New Product Teams: Practices and Outcomes,” IEEE Transactions on Engineering Management, Vol. 47, pp. 221 - 231.
[23]Mitchell, E. (2001), “Web-based APQP Keeps Everyone Connected,” in Quality, Vol. 40, pp. 40-45.
[24]Peng, C. L. (2007), “Applying MFM and PFMEA for the Supervisory Control of Collaborative Design Process,” National Central University, Master Thesis.
[25]Piszczalski, M. (2002), “Cooking Up A Better Approach to Development & Quality,” in Automotive Design & Production, Vol. 114, pp. 16-18.
[26]Sanongpong, K. (2009), “Automotive Process-based New Product Development: A Review of Key Performance Metrics,” Proceedings of the World Congress on Engineering 2009 Vol I WCE 2009, London, U.K, July 1 - 3.
[27]Sommerville, J., and Dalziel, A. (1998), “Project Teambuilding: The Applicability of Belbin’s Team-Role Self-Perception Inventory,” International Journal Management, Vol. 16, No. 3, pp. 165-171.
[28]Sunnersjo, S., Cederfeldt, M., Elgh, F. and Rask, I. (2006), “A Transparent Design System for Iterative Product Development,” Journal of Computing and Information Science in Engineering 6, 300–307, 2006.
[29]Supply-Chain Council (2006), “Design-chain Operations Reference-model,” http://www.supply-chain.org.
[30]Supply-Chain Council (2006), Design-Chain Special Interest Group, “Design-Chain Operations Reference-model (DCOR) 1.0.”
[31]Wang, L.H., Shen, W.M., Xie, H., Neelamkavil, J. and Pardasani, A (2002), “Collaborative Conceptual Design – State of The Art and Future Trends,” Computer-Aided Design, Vol. 34, No.13, pp. 981-966.
[32]Wang, H. W. (2006), “Establishing an ISO/TS 16949 Based New Product Development Procedure for Automotive TFT-LCD Panel Makers,” National Chiao Tung University, Master Thesis.
[33]江玳君(2007), “A Design Methodology for The Collaborative Product Development Platform,” National Central University, Master Thesis.
|