Taiwan’s manufacturing industry has got success in the world by effective management and good cost control. The production type is from the way to produce in a large amount (MTS: Made to Stock) change into the various producing in batches small of small quantity. In the field of industrial management, the production system we call this a "small amount of diversity" mode of production. "A small amount of diversity" is mode of production design and production of multiple orders for engineer to match product demand.
In this study, we want to know the relocation of Taiwan’’s production line and leaving the company in Taiwan in response to the transformation of enterprises from the production plant into a research and development company. This process for the company is needed change and focused on changes in the probability of under trial run batch of production. As is often produced when the probability is not learned, how to go on in such cases put into lot size for trial run to achieve the purpose of verification process and reduce the cost of loss. To explore this process, using existing simulation software-ARENA as a research assistant tool to construct models for system simulation, simulation of changes in the probability of a different range, lot size, and further obtain the optimal lot size.
Expectations by such a study can have another way to have different thinking besides the probability at a fixed volume of the best outside of the other path. After all, the probability is non-stationary, while the production can only try to maintain at a high level of the interval. When it is non-fixed, how will the operation of the lot size working that is an interesting subject.
|
參考文獻 |
ㄧ.中文文獻
1. 劉賓陽,作業研究,三民書局,2000
2. 林則孟,系統模擬理論與應用,滄海書局,2001
3. 林盛賢,製造業應用功能單元生產模式之研究,碩士論文,2004
4. 柳昌良,筆記型電腦廠製造流程分析:系統組裝線,碩士論文,2001
5. 王志方,EMS/ODM產業概況,台灣工業銀行報告,2009/09
6. 陳奕帆、吳梓維,筆電代工產業分析,產業分析報告,2008/06
7. 李宗儒,分批式流程制程階段批量允收水準參數之最佳化研究,碩士論文,2006/06
8. 陳至安、李紹彰,批量生產下的檢驗策略研究,品質學報 Vol. 15, No. 1 (2008)
9. 林柏勛,電腦發展與趨勢,主題報告,2007
10. 林耕賢、陳顥元,電腦演進概論─「電子計算機」,研究報告
11. 英業達公開資訊,英業達企業社會責任報告書,2009
12. 莊寶鵰、李祥林、黃仕慶,電子組裝業抽樣計畫與品質水準之探討,中華民國品質學會第40 屆年會 高雄市分會第30 屆年會暨第10 屆全國品質管理研討會論文集,2004
13. 工業技術研究院產業經濟與趨勢研究中心、資訊工業策進會資訊市場情報中心,台灣產業發展與策略,2007
14. 賴俊宏,在EPQ模式下含機器當機(AR)型及重工之最佳生產週期,碩士論文,2005/07
15. 拾景源,導入精實生產建構不同生產類型的彈性混線生產模式,碩士論文,2008/07
二. 英文文獻
1. W. David Kelton, Randall P. Sadowski and Nancy B. Swets, “Simulation with Arena” Fifth edition, McGraw.Hill, 2010
2. FINE, C. 1983. Quality Control and Learning in Productive systems. Ph.D. thesis, Graduate School of Business, Stanford University
3. PORTEUS, E., "Optimal Lot Sizing, Process Quality Improvement and Setup Cost Reduction," Oper. Res., 34 (1986)
4. HALL, R. 1983. Zero Inventories. Dow Jones-Irwin, Homewood, Ill
5. ROSENBLATT, M. AND H. LEE, "Economic Production Cycles with Imperfect Production Processes." IIE Trans., 18 (1986a)
6. MONDEN, Y., Toyota Production System, Industrial Engineering and Management Press, Norcross, GA, 1983.
7. Evan L. Porteus., “ The Impact of Inspection Delay on Process and Inspection Lot Sizing” Management Science, Vol. 36, No. 8 (Aug., 1990)
8. F. W. Harris, "How Many Parts to Make at Once? ", Factory: The Magazine of Management, vol. 10, 1913
|